<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en-GB">
	<id>http://13.50.150.85/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Roki</id>
	<title>DTU ProjectLab - User contributions [en-gb]</title>
	<link rel="self" type="application/atom+xml" href="http://13.50.150.85/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Roki"/>
	<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php/Special:Contributions/Roki"/>
	<updated>2026-07-14T08:45:19Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.43.3</generator>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101728</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101728"/>
		<updated>2021-02-28T22:57:49Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Annotated Bibliography */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
These principles are comparable to the project scope management and have similarities in more than one principle/process.  &amp;lt;ref name=&amp;quot;BC&amp;quot; /&amp;gt; These two goes hand in hand in terms of identifying the scope of projects and value for customers. By following these steps, the propability of overlooking relevant information is reduced, and the project will thus be raised to a higher and more quality conscious level.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Puplisher: International Journal of Construction Supply Chain Management (1th edition 2012). &#039;&#039;Application of Lean Principles to Design Processes in Construction Consultancy&#039;&#039;&lt;br /&gt;
*  This article investigate the Lean way within the design phase in the construction industry. It is interesting to look at it in order to find some suitable methods to apply Lean in these processes.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Project Management Institute, Inc. (PMI) (1th edition 2017). &#039;&#039; Guide to the Project Management Body of Knowledge&#039;&#039;&lt;br /&gt;
*  As the title indicates, consists this book a range of elements within project management. It is very beneficial, because it guides you and give a clear overview of the things that need to be done, in order to manage a project succesfully.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt;, Doanh Do&#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;BC&amp;quot;&amp;gt; Inc.  Project Management Institute,  &#039;&#039;&amp;quot;  Guide to the Project Management Body of Knowledge&amp;quot; Published September 22, 2017. Accessed February 18, 2021.[https://app-knovel-com.proxy.findit.dtu.dk/web/toc.v/cid:kpGPMBKP02/viewerType:toc//root_slug:viewerType%3Atoc/url_slug:root_slug%3Aguide-project-management?kpromoter=federation]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=rrab&amp;quot;&amp;gt; Inc.  Project Management Institute,  &#039;&#039;&amp;quot;  Guide to the Project Management Body of Knowledge&amp;quot; Published September 22, 2017. Accessed February 18, 2021.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101726</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101726"/>
		<updated>2021-02-28T22:57:37Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Annotated Bibliography */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
These principles are comparable to the project scope management and have similarities in more than one principle/process.  &amp;lt;ref name=&amp;quot;BC&amp;quot; /&amp;gt; These two goes hand in hand in terms of identifying the scope of projects and value for customers. By following these steps, the propability of overlooking relevant information is reduced, and the project will thus be raised to a higher and more quality conscious level.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Puplisher: International Journal of Construction Supply Chain Management (1th edition 2012). &#039;&#039;Application of Lean Principles to Design Processes in Construction Consultancy&#039;&#039;&lt;br /&gt;
*  This article investigate the Lean way within the design phase in the construction industry. It is interesting to look at it in order to find some suitable methods to apply Lean in these processes.&lt;br /&gt;
&lt;br /&gt;
Project Management Institute, Inc. (PMI) (1th edition 2017). &#039;&#039; Guide to the Project Management Body of Knowledge&#039;&#039;&lt;br /&gt;
*  As the title indicates, consists this book a range of elements within project management. It is very beneficial, because it guides you and give a clear overview of the things that need to be done, in order to manage a project succesfully.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt;, Doanh Do&#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;BC&amp;quot;&amp;gt; Inc.  Project Management Institute,  &#039;&#039;&amp;quot;  Guide to the Project Management Body of Knowledge&amp;quot; Published September 22, 2017. Accessed February 18, 2021.[https://app-knovel-com.proxy.findit.dtu.dk/web/toc.v/cid:kpGPMBKP02/viewerType:toc//root_slug:viewerType%3Atoc/url_slug:root_slug%3Aguide-project-management?kpromoter=federation]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=rrab&amp;quot;&amp;gt; Inc.  Project Management Institute,  &#039;&#039;&amp;quot;  Guide to the Project Management Body of Knowledge&amp;quot; Published September 22, 2017. Accessed February 18, 2021.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101704</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101704"/>
		<updated>2021-02-28T22:53:54Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
These principles are comparable to the project scope management and have similarities in more than one principle/process.  &amp;lt;ref name=&amp;quot;BC&amp;quot; /&amp;gt; These two goes hand in hand in terms of identifying the scope of projects and value for customers. By following these steps, the propability of overlooking relevant information is reduced, and the project will thus be raised to a higher and more quality conscious level.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Puplisher: International Journal of Construction Supply Chain Management (1th edition 2012). &#039;&#039;Application of Lean Principles to Design Processes in Construction Consultancy&#039;&#039;&lt;br /&gt;
*  This article investigate the Lean way within the design phase in the construction industry. It is interesting to look at it in order to find some suitable methods to apply Lean in these processes.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt;, Doanh Do&#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;BC&amp;quot;&amp;gt; Inc.  Project Management Institute,  &#039;&#039;&amp;quot;  Guide to the Project Management Body of Knowledge&amp;quot; Published September 22, 2017. Accessed February 18, 2021.[https://app-knovel-com.proxy.findit.dtu.dk/web/toc.v/cid:kpGPMBKP02/viewerType:toc//root_slug:viewerType%3Atoc/url_slug:root_slug%3Aguide-project-management?kpromoter=federation]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=rrab&amp;quot;&amp;gt; Inc.  Project Management Institute,  &#039;&#039;&amp;quot;  Guide to the Project Management Body of Knowledge&amp;quot; Published September 22, 2017. Accessed February 18, 2021.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101700</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101700"/>
		<updated>2021-02-28T22:53:26Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Lean principles */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
These principles are comparable to the project scope management and have similarities in more than one principle/process.  &amp;lt;ref name=&amp;quot;BC&amp;quot; /&amp;gt; These two goes hand in hand in terms of identifying the scope of projects and value for customers. By following these steps, the propability of overlooking relevant information is reduced, and the project will thus be raised to a higher and more quality conscious level.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Puplisher: International Journal of Construction Supply Chain Management (1th edition 2012). &#039;&#039;Application of Lean Principles to Design Processes in Construction Consultancy&#039;&#039;&lt;br /&gt;
*  This article investigate the Lean way within the design phase in the construction industry. It is interesting to look at it in order to find some suitable methods to apply Lean in these processes.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt;, Doanh Do&#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=rrab&amp;quot;&amp;gt; Inc.  Project Management Institute,  &#039;&#039;&amp;quot;  Guide to the Project Management Body of Knowledge&amp;quot; Published September 22, 2017. Accessed February 18, 2021.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101697</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101697"/>
		<updated>2021-02-28T22:52:59Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
These principles are comparable to the project scope management and have similarities in more than one principle/process.  &amp;lt;ref name=&amp;quot;rrab&amp;quot; /&amp;gt; These two goes hand in hand in terms of identifying the scope of projects and value for customers. By following these steps, the propability of overlooking relevant information is reduced, and the project will thus be raised to a higher and more quality conscious level.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Puplisher: International Journal of Construction Supply Chain Management (1th edition 2012). &#039;&#039;Application of Lean Principles to Design Processes in Construction Consultancy&#039;&#039;&lt;br /&gt;
*  This article investigate the Lean way within the design phase in the construction industry. It is interesting to look at it in order to find some suitable methods to apply Lean in these processes.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt;, Doanh Do&#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=rrab&amp;quot;&amp;gt; Inc.  Project Management Institute,  &#039;&#039;&amp;quot;  Guide to the Project Management Body of Knowledge&amp;quot; Published September 22, 2017. Accessed February 18, 2021.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101694</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101694"/>
		<updated>2021-02-28T22:51:14Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
These principles are comparable to the project scope management and have similarities in more than one principle/process.  &amp;lt;ref name=&amp;quot;rrab&amp;quot; /&amp;gt; These two goes hand in hand in terms of identifying the scope of projects and value for customers. By following these steps, the propability of overlooking relevant information is reduced, and the project will thus be raised to a higher and more quality conscious level.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Puplisher: International Journal of Construction Supply Chain Management (1th edition 2012). &#039;&#039;Application of Lean Principles to Design Processes in Construction Consultancy&#039;&#039;&lt;br /&gt;
*  This article investigate the Lean way within the design phase in the construction industry. It is interesting to look at it in order to find some suitable methods to apply Lean in these processes.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt;Inc.  Project Management Institute, &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101689</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101689"/>
		<updated>2021-02-28T22:50:03Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
These principles are comparable to the project scope management and have similarities in more than one principle/process.  &amp;lt;ref name=&amp;quot;rrab&amp;quot; /&amp;gt; These two goes hand in hand in terms of identifying the scope of projects and value for customers. By following these steps, the propability of overlooking relevant information is reduced, and the project will thus be raised to a higher and more quality conscious level.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Puplisher: International Journal of Construction Supply Chain Management (1th edition 2012). &#039;&#039;Application of Lean Principles to Design Processes in Construction Consultancy&#039;&#039;&lt;br /&gt;
*  This article investigate the Lean way within the design phase in the construction industry. It is interesting to look at it in order to find some suitable methods to apply Lean in these processes.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt;Inc.  Project Management Institute, &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=rrab&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  Guide to the Project Management Body of Knowledge&amp;quot; Published September 22, 2017. Accessed February 18, 2021.[https://app-knovel-com.proxy.findit.dtu.dk/web/toc.v/cid:kpGPMBKP02/viewerType:toc//root_slug:viewerType%3Atoc/url_slug:root_slug%3Aguide-project-management?kpromoter=federation]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101688</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101688"/>
		<updated>2021-02-28T22:49:41Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
These principles are comparable to the project scope management and have similarities in more than one principle/process.  &amp;lt;ref name=&amp;quot;rrab&amp;quot; /&amp;gt; These two goes hand in hand in terms of identifying the scope of projects and value for customers. By following these steps, the propability of overlooking relevant information is reduced, and the project will thus be raised to a higher and more quality conscious level.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Puplisher: International Journal of Construction Supply Chain Management (1th edition 2012). &#039;&#039;Application of Lean Principles to Design Processes in Construction Consultancy&#039;&#039;&lt;br /&gt;
*  This article investigate the Lean way within the design phase in the construction industry. It is interesting to look at it in order to find some suitable methods to apply Lean in these processes.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt;Inc.  Project Management Institute, &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=rraa&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  Guide to the Project Management Body of Knowledge&amp;quot; Published September 22, 2017. Accessed February 18, 2021.[https://app-knovel-com.proxy.findit.dtu.dk/web/toc.v/cid:kpGPMBKP02/viewerType:toc//root_slug:viewerType%3Atoc/url_slug:root_slug%3Aguide-project-management?kpromoter=federation]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101660</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101660"/>
		<updated>2021-02-28T22:45:21Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Lean principles */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
These principles are comparable to the project scope management and have similarities in more than one principle/process.  &amp;lt;ref name=&amp;quot;rrab&amp;quot; /&amp;gt; These two goes hand in hand in terms of identifying the scope of projects and value for customers. By following these steps, the propability of overlooking relevant information is reduced, and the project will thus be raised to a higher and more quality conscious level.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Puplisher: International Journal of Construction Supply Chain Management (1th edition 2012). &#039;&#039;Application of Lean Principles to Design Processes in Construction Consultancy&#039;&#039;&lt;br /&gt;
*  This article investigate the Lean way within the design phase in the construction industry. It is interesting to look at it in order to find some suitable methods to apply Lean in these processes.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101587</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101587"/>
		<updated>2021-02-28T22:34:38Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Annotated Bibliography */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Puplisher: International Journal of Construction Supply Chain Management (1th edition 2012). &#039;&#039;Application of Lean Principles to Design Processes in Construction Consultancy&#039;&#039;&lt;br /&gt;
*  This article investigate the Lean way within the design phase in the construction industry. It is interesting to look at it in order to find some suitable methods to apply Lean in these processes.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101530</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101530"/>
		<updated>2021-02-28T22:26:54Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Annotated Bibliography */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101527</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101527"/>
		<updated>2021-02-28T22:26:41Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Annotated Bibliography */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Routledge (1th edition 2002). &#039;&#039;Design and Construction&#039;&#039;&lt;br /&gt;
*  This book is written by Lauri Koskela, Greg Howell, Glenn Ballard and Iris Tommelein who all have great knowledge within Lean and have made some experiments too. Chapter 14 in this book represent the foundation and key elements of Lean Construction to get a better comprehension of this concept. Paragraph 14.3 is remarkable because it review the negative aspect of the conventional construction project&lt;br /&gt;
management and why it does not succeea according to their examination.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101478</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101478"/>
		<updated>2021-02-28T22:16:57Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Annotated Bibliography */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is a great lexicon within finding sustainable methods to optimize the construction industry. The book is divided in chapters, where each one present and assess a specific method. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. This chapter has also examined some other useful and interesting content within LEAN.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101454</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=101454"/>
		<updated>2021-02-28T22:11:47Z</updated>

		<summary type="html">&lt;p&gt;Roki: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Annotated Bibliography==&lt;br /&gt;
&lt;br /&gt;
Butterworthheinemann (1th edition 2019). &#039;&#039;Sustainable Construction Technologies&#039;&#039;&lt;br /&gt;
*  This book is the greatest lexicon within the LEAN world. The book is divided in chapters, where each one assess a specific aspect of Lean. You can find all relevant information within Lean, starting from the history, to the development of the idea, and lastly about the implementation and the different aspects of it. Chapter 12 goes into detail with Lean principles in the construction industry and gives a clear overview of the industry and its challenges. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100901</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100901"/>
		<updated>2021-02-28T21:02:51Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;88ab&amp;quot;&amp;gt; Marzouk Mohamed M. et al.&#039;&#039;&amp;quot;Application of Lean Principles to Design Processes in Construction Consultancy&amp;quot; January 2012&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100871</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100871"/>
		<updated>2021-02-28T20:59:50Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Limitations */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process are achieved.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100868</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100868"/>
		<updated>2021-02-28T20:59:36Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Implementing Lean */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process.   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources&amp;lt;ref name=&amp;quot;88ab&amp;quot; /&amp;gt;.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized processARE achieved.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100812</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100812"/>
		<updated>2021-02-28T20:53:10Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Limitations */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized processARE achieved.&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100786</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100786"/>
		<updated>2021-02-28T20:50:25Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* 7 wastes */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Transportation&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Inventory&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Motion&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Waiting&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Over-Processing&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;6.	Overproduction&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;7.	Defects&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100779</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=100779"/>
		<updated>2021-02-28T20:49:49Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Lean principles */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;1.	Define value&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;2.	Map the value stream&#039;&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;3.	Create flow&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;4.	Establish pull&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;5.	Pursue perfection&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91806</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91806"/>
		<updated>2021-02-23T11:29:50Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Oladapo Adebayo Akanbi et al. &#039;&#039;&amp;quot; Sustainable Construction Technologies&amp;quot; chapter 12: Lean Principles in Construction, Published 2019&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91799</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91799"/>
		<updated>2021-02-23T11:21:03Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;RA&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  NO NAME&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91795</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91795"/>
		<updated>2021-02-23T11:19:42Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Just in time */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time &amp;lt;ref name=&amp;quot;RA&amp;quot; /&amp;gt;. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91721</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91721"/>
		<updated>2021-02-23T09:04:38Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Implementing Lean */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different.&lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91717</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91717"/>
		<updated>2021-02-23T08:55:08Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  Implementation Leanconstruction: Improving downstream performance&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91713</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91713"/>
		<updated>2021-02-23T08:52:31Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91712</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91712"/>
		<updated>2021-02-23T08:52:13Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; Howell, G.and Ballard, G.&#039;&#039;&amp;quot;Implementing lean construction: understanding and action. In: Proceedings of the Sixth Annual Conference of the International Group for Lean Construction&amp;quot;(1998)&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91705</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91705"/>
		<updated>2021-02-23T08:37:44Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91704</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91704"/>
		<updated>2021-02-23T08:37:11Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91703</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91703"/>
		<updated>2021-02-23T08:36:44Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Articles_Spring_Term_2021&amp;diff=91322</id>
		<title>Articles Spring Term 2021</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Articles_Spring_Term_2021&amp;diff=91322"/>
		<updated>2021-02-22T08:37:12Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Overview of 2021 Wiki Collections */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=Overview of 2021 Wiki Collections=&lt;br /&gt;
&lt;br /&gt;
{| class=&amp;quot;wikitable sortable&amp;quot;&lt;br /&gt;
|+Spring Term 2021 Wiki Collections&lt;br /&gt;
|Group name&lt;br /&gt;
|First name&lt;br /&gt;
|Surname&lt;br /&gt;
|Student number&lt;br /&gt;
|[[Article name]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|TAs Example&lt;br /&gt;
|Thomas&lt;br /&gt;
|Giannoulopoulos&lt;br /&gt;
|s192419&lt;br /&gt;
|[[APPM Example 2021]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 12&lt;br /&gt;
|Christian&lt;br /&gt;
|Frøsig&lt;br /&gt;
|s175044&lt;br /&gt;
|[[Belbin&#039;s 9 team roles]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Oliver&lt;br /&gt;
|K. Vittrup&lt;br /&gt;
|s163754&lt;br /&gt;
|[[Top-down vs bottom-up estimations]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|44&lt;br /&gt;
|Jeyad&lt;br /&gt;
|M. Baig&lt;br /&gt;
|s153585&lt;br /&gt;
|[[Planning Methods - 3 Levels of Project Planning]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 17&lt;br /&gt;
|Quoc-Khanh Rose-Marie Therese&lt;br /&gt;
|Madsen&lt;br /&gt;
|s123462&lt;br /&gt;
|[[Applying Tuckman’s model for team development]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|31&lt;br /&gt;
|Haoxiang&lt;br /&gt;
|Sang&lt;br /&gt;
|s192258&lt;br /&gt;
|[[Cost control with statistic tools]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 31&lt;br /&gt;
|He&lt;br /&gt;
|Fan&lt;br /&gt;
|s192195&lt;br /&gt;
|[[Work Break-down Structure]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Ángel&lt;br /&gt;
|Castro del Olmo&lt;br /&gt;
|s193246&lt;br /&gt;
|[[Stakeholder Engagement and Sustainability in Maritime Spatial Planning]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|44&lt;br /&gt;
|Abdullah Shams&lt;br /&gt;
|Turkmani&lt;br /&gt;
|s153337&lt;br /&gt;
|[[ICT Agreement]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 17&lt;br /&gt;
|Jacopo&lt;br /&gt;
|Renzi&lt;br /&gt;
|s210445&lt;br /&gt;
|[[Double Diamond in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 35&lt;br /&gt;
|Helga Sigríður&lt;br /&gt;
|Magnúsdóttir&lt;br /&gt;
|s202027&lt;br /&gt;
|[[Network Planning]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|12&lt;br /&gt;
|Cæcilie&lt;br /&gt;
|Kortbæk&lt;br /&gt;
|163873&lt;br /&gt;
|[[Double diamond]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Frithjof Johannes&lt;br /&gt;
|Thiem&lt;br /&gt;
|s202972&lt;br /&gt;
|[[DevOps]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|12&lt;br /&gt;
|Emilie&lt;br /&gt;
|Winther Schmidt&lt;br /&gt;
|163884&lt;br /&gt;
|[[Iron Triangle]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|12&lt;br /&gt;
|Anna&lt;br /&gt;
|Fredgaard&lt;br /&gt;
|s163887&lt;br /&gt;
|[[Active Listening Technique]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|35&lt;br /&gt;
|Ruben&lt;br /&gt;
|Raes&lt;br /&gt;
|s202029&lt;br /&gt;
|[[Iron Triangle of Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|21&lt;br /&gt;
|Claudia&lt;br /&gt;
|Balcells&lt;br /&gt;
|s202939&lt;br /&gt;
|[[APPPM Issue Tree]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|35&lt;br /&gt;
|Brynja&lt;br /&gt;
|Gudmundsdottir&lt;br /&gt;
|s202030&lt;br /&gt;
|[[FAST goals]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|16&lt;br /&gt;
|Andrea&lt;br /&gt;
|Pin Morales&lt;br /&gt;
|s205567&lt;br /&gt;
|[[The Business Case]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|16&lt;br /&gt;
|Lena Maria&lt;br /&gt;
|Thyen&lt;br /&gt;
|s202969&lt;br /&gt;
|[[The 7 Habits of Highly Effective People]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|35&lt;br /&gt;
|Úlfar&lt;br /&gt;
|Viktorsson&lt;br /&gt;
|s202022&lt;br /&gt;
|[[The 4 Disciplines of Execution]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|16&lt;br /&gt;
|Moritz&lt;br /&gt;
|Rindermann&lt;br /&gt;
|s202976&lt;br /&gt;
|[[Tuckmans model for Team Development]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 29&lt;br /&gt;
|Heiðdís Ósk&lt;br /&gt;
|Pétursdóttir&lt;br /&gt;
|s202025&lt;br /&gt;
|[[Efficiency and Effectiveness]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|31&lt;br /&gt;
|Xabier&lt;br /&gt;
|Martínez de Zabarte&lt;br /&gt;
|s210323&lt;br /&gt;
|[[Scrumban]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|17&lt;br /&gt;
|Aldís Braga&lt;br /&gt;
|Eiríksdóttir&lt;br /&gt;
|s202045&lt;br /&gt;
|[[Blake-Mouton Managerial Grid]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|32&lt;br /&gt;
|Jan Otis&lt;br /&gt;
| Ernst&lt;br /&gt;
|s210433&lt;br /&gt;
|[[RACI Matrix]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|3&lt;br /&gt;
|Julie&lt;br /&gt;
| Finne-Ipsen&lt;br /&gt;
|s153987&lt;br /&gt;
|[[Kahneman - Two Thinking Systems]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|24&lt;br /&gt;
|Maria Eileen&lt;br /&gt;
| Hubbuck&lt;br /&gt;
|s210444&lt;br /&gt;
|[[Risk Management-Identification]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|11&lt;br /&gt;
|Alina&lt;br /&gt;
| Barun&lt;br /&gt;
|s202514&lt;br /&gt;
|[[Maslow&#039;s Hierarchy of Needs]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|24&lt;br /&gt;
|Felix Vinzenz&lt;br /&gt;
|Wütherich&lt;br /&gt;
|s202968&lt;br /&gt;
|[[Emotional Intelligence and Leadership]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|28&lt;br /&gt;
|Ariadna&lt;br /&gt;
|Ramos&lt;br /&gt;
|s191852&lt;br /&gt;
|[[The Work Breakdown Structure (WBS)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Jakob&lt;br /&gt;
|Grønvald&lt;br /&gt;
|s164346&lt;br /&gt;
|[[Maslow‘s Hierarchy of Needs, Motivation in the workplace]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 16&lt;br /&gt;
|Martina&lt;br /&gt;
|Rampazzo&lt;br /&gt;
|s202895&lt;br /&gt;
|[[Earned value management (EVM)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 2&lt;br /&gt;
|John&lt;br /&gt;
|Fritz&lt;br /&gt;
|s202967&lt;br /&gt;
|[[Learning plan]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 24&lt;br /&gt;
|Henning&lt;br /&gt;
|Duwe&lt;br /&gt;
|s210450&lt;br /&gt;
|[[SWOT Analysis]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|Søren Emil&lt;br /&gt;
|Kjær&lt;br /&gt;
|s201528&lt;br /&gt;
|[[GANTT]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Mathilde Kremmer&lt;br /&gt;
|Broberg&lt;br /&gt;
|s175074&lt;br /&gt;
|[[Corrective and Preventive Actions (CAPA)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|Rune Lykke&lt;br /&gt;
|Høg&lt;br /&gt;
|s165012&lt;br /&gt;
|[[The use of the A3 management process]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 35&lt;br /&gt;
|Tinna Hrönn&lt;br /&gt;
|Unudóttir&lt;br /&gt;
|s202032&lt;br /&gt;
|[[Constructive communication]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 17&lt;br /&gt;
|Eva Rún&lt;br /&gt;
|Arnarsdóttir&lt;br /&gt;
|s203214&lt;br /&gt;
|[[Biases in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 24&lt;br /&gt;
|Astrid&lt;br /&gt;
|Skovhus&lt;br /&gt;
|s164499&lt;br /&gt;
|[[Getting Things Done (GTD)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 7&lt;br /&gt;
|Phillip&lt;br /&gt;
|Dyrberg&lt;br /&gt;
|s164503&lt;br /&gt;
|[[Double diamond: A design process model]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|Amanda Emilie&lt;br /&gt;
|Søborg Berthelsen&lt;br /&gt;
|s154707&lt;br /&gt;
|[[The Johari Window]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Nicolai Mossing&lt;br /&gt;
|Madsen&lt;br /&gt;
|s164515&lt;br /&gt;
|[[SMART Goals (Specific, Measurable, Attainable, Relevant, Time-bound)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Marie-Louise Wolfsberg&lt;br /&gt;
|Schmidt&lt;br /&gt;
|s164417&lt;br /&gt;
|[[The Affect Heuristic]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Erika Marie&lt;br /&gt;
|Strøm&lt;br /&gt;
|s203224&lt;br /&gt;
|[[Parkinson&#039;s Law in Project Schedule Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 16&lt;br /&gt;
|Beatrice&lt;br /&gt;
|Ranzato&lt;br /&gt;
|s202887&lt;br /&gt;
|[[X-Matrix Hoshin Kanri]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 9&lt;br /&gt;
|Helene Waldmann&lt;br /&gt;
|Jørgensen&lt;br /&gt;
|s173891&lt;br /&gt;
|[[Lag &amp;amp; Lead]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Zahra&lt;br /&gt;
|Al-Mosawi&lt;br /&gt;
|s193938&lt;br /&gt;
|[[Belbin Team Roles in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|William Axel Linderoth&lt;br /&gt;
|Michaelen&lt;br /&gt;
|s153275&lt;br /&gt;
|[[Design-Build]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 31&lt;br /&gt;
|Jesús &lt;br /&gt;
|Gracia Yoldi&lt;br /&gt;
|s210111&lt;br /&gt;
|[[Kanban in APPPM]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 35&lt;br /&gt;
|Katrín Erla &lt;br /&gt;
|Bergsveinsdóttir&lt;br /&gt;
|s202026&lt;br /&gt;
|[[Contingency plans]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Cecilie Marie Raagaard &lt;br /&gt;
|Christensen&lt;br /&gt;
|s160832&lt;br /&gt;
|[[Work breakdown structure (WBS)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Ali Jamal&lt;br /&gt;
|Jomeh&lt;br /&gt;
|s173741&lt;br /&gt;
|[[SMART goals: A project management tool]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 15&lt;br /&gt;
|Tobias &lt;br /&gt;
|Hyldmo&lt;br /&gt;
|s206658&lt;br /&gt;
|[[High performing teams]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Samah&lt;br /&gt;
|Said&lt;br /&gt;
|s203228&lt;br /&gt;
|[[Reference class forecasting]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 3&lt;br /&gt;
|Emilie&lt;br /&gt;
|Torp&lt;br /&gt;
|s153320&lt;br /&gt;
|[[Goal Hierarchy]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 3&lt;br /&gt;
|Victor Nørregaard&lt;br /&gt;
|Schwærter&lt;br /&gt;
|s164745&lt;br /&gt;
|[[Milestone Planning]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 9&lt;br /&gt;
|Jacob&lt;br /&gt;
|Ammitsøe&lt;br /&gt;
|s173849&lt;br /&gt;
|[[Authenticity]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Anna&lt;br /&gt;
|Bjørn Reland&lt;br /&gt;
|s154556&lt;br /&gt;
|[[Choosing the appropriate medium (oral – written – hybrids)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 10&lt;br /&gt;
|Wail&lt;br /&gt;
|Atrari&lt;br /&gt;
|s170706&lt;br /&gt;
|[[The Double Diamond Tool: Prevent budget overruns and delays in your projects]]&lt;br /&gt;
|-&lt;br /&gt;
|Group 10&lt;br /&gt;
|Helená Evin&lt;br /&gt;
|Cinar&lt;br /&gt;
|s164741&lt;br /&gt;
|[[SWOT Analysis Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 10&lt;br /&gt;
|Mohammad&lt;br /&gt;
|Abou Hassan&lt;br /&gt;
|s160101&lt;br /&gt;
|[[Implementing SWOT]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 10&lt;br /&gt;
|Ahmet&lt;br /&gt;
|Akgül&lt;br /&gt;
|s152597&lt;br /&gt;
|[[Smart goals (Specific, Measurable, Achievable, Realistic, and Timely)]]&lt;br /&gt;
|- &lt;br /&gt;
|- &lt;br /&gt;
|Group 2&lt;br /&gt;
|Amalie&lt;br /&gt;
|N. Müller&lt;br /&gt;
|s173675&lt;br /&gt;
|[[Big five personality traits (OCEAN model)]]&lt;br /&gt;
|- &lt;br /&gt;
|- &lt;br /&gt;
|Group 29&lt;br /&gt;
|Pétursdóttir&lt;br /&gt;
|Stefanía Ósk&lt;br /&gt;
|s202044&lt;br /&gt;
|[[Situational leadership - Hersey and Blanchard]]&lt;br /&gt;
|- &lt;br /&gt;
|- &lt;br /&gt;
|Group 10&lt;br /&gt;
|Abdulahi&lt;br /&gt;
|Hayle Hassan&lt;br /&gt;
|s164691&lt;br /&gt;
|[[Stakeholder management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Louise&lt;br /&gt;
|Landschoff&lt;br /&gt;
|s165111&lt;br /&gt;
|[[SCRUM - A Project Management Framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 10&lt;br /&gt;
|Sara&lt;br /&gt;
|Alabiidi&lt;br /&gt;
|s164650&lt;br /&gt;
|[[The Blake-Mouton Managerial Grid]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Felix&lt;br /&gt;
|Dressel&lt;br /&gt;
|s202965&lt;br /&gt;
|[[The SPALTEN Problem-Solving Methodology as a Decision Making Tool in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 11&lt;br /&gt;
|Sandra&lt;br /&gt;
|Nielsen&lt;br /&gt;
|s153370&lt;br /&gt;
|[[Conflict ladder]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 11&lt;br /&gt;
|Lise Munch&lt;br /&gt;
|Nordheim&lt;br /&gt;
|s200400&lt;br /&gt;
|[[McGregor&#039;s X &amp;amp; Y theory]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 2&lt;br /&gt;
|Simon&lt;br /&gt;
|Knutsson&lt;br /&gt;
|s202041&lt;br /&gt;
|[[Earned Value Management (EVM)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 12&lt;br /&gt;
|Christoffer&lt;br /&gt;
|Askgaard&lt;br /&gt;
|s165098&lt;br /&gt;
|[[Design the team you need to succeed using Belbin&#039;s team roles]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 24&lt;br /&gt;
|Gaute Bø&lt;br /&gt;
|Aaløkken&lt;br /&gt;
|s202065&lt;br /&gt;
|[[Diversity in teams]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 2&lt;br /&gt;
|Lukas&lt;br /&gt;
|Tanzer&lt;br /&gt;
|s200120&lt;br /&gt;
|[[Continuous Improvement]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 7&lt;br /&gt;
|Sofie&lt;br /&gt;
|Lundsteen&lt;br /&gt;
|s170285&lt;br /&gt;
|[[Team roles at work]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|FIRST NAME&lt;br /&gt;
|LAST NAME&lt;br /&gt;
|STUDY ID&lt;br /&gt;
|[[Applying the Hawthorne studies to project management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 3&lt;br /&gt;
|Amalie Nordstrøm&lt;br /&gt;
|Nielsen&lt;br /&gt;
|s153272&lt;br /&gt;
|[[The seven characteristic principles]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|Louise Damborg&lt;br /&gt;
|Frederiksen&lt;br /&gt;
|s185238&lt;br /&gt;
|[[Using Facilitation to Mitigate Bias in a Team Setting]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Georg Holger&lt;br /&gt;
|Waage&lt;br /&gt;
|s163819&lt;br /&gt;
|[[Fishbone Diagram]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Özgenur&lt;br /&gt;
|Baştuğ&lt;br /&gt;
|s203033&lt;br /&gt;
|[[Variation Orders in Construction Projects]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 9&lt;br /&gt;
|Mads&lt;br /&gt;
|Møhlenberg&lt;br /&gt;
|s173879&lt;br /&gt;
|[[A hybrid consisting of Agile and Stage Gate]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 29&lt;br /&gt;
|Svanhvít Birta&lt;br /&gt;
|Guðmundsdóttir&lt;br /&gt;
|s203174&lt;br /&gt;
|[[Project Milestones]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Bente&lt;br /&gt;
|Meidahl Münsberg&lt;br /&gt;
|s175068&lt;br /&gt;
|[[Gantt Charts]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Frederik&lt;br /&gt;
|Carlsson &lt;br /&gt;
|s164345&lt;br /&gt;
|[[FAST Goals]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 11&lt;br /&gt;
|Tobias&lt;br /&gt;
|Rydahl &lt;br /&gt;
|s200471&lt;br /&gt;
|[[Using DISC assessment for project team management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 7&lt;br /&gt;
|Mads &lt;br /&gt;
|Støjfer-Hønberg&lt;br /&gt;
|s174303&lt;br /&gt;
|[[SCRUM - An Agile Project Management Framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 21&lt;br /&gt;
|Matthieu &lt;br /&gt;
|Buy&lt;br /&gt;
|s202925&lt;br /&gt;
|[[The Five-Factor Model (OCEAN)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Astrid Helene&lt;br /&gt;
|Erecius&lt;br /&gt;
|s171013&lt;br /&gt;
|[[Choosing communication media for negotiation]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 44&lt;br /&gt;
|Zainab&lt;br /&gt;
|Jalal&lt;br /&gt;
|s165491&lt;br /&gt;
|[[Work Breakdown Structure in project management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 2&lt;br /&gt;
|Anna Felicia Mai&lt;br /&gt;
|Lindström&lt;br /&gt;
|s202046&lt;br /&gt;
|[[Project Status Reporting]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Alberto&lt;br /&gt;
|Melloni&lt;br /&gt;
|s202894&lt;br /&gt;
|[[Pre-mortem analysis]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 29&lt;br /&gt;
|Thore Uwe&lt;br /&gt;
|Aye&lt;br /&gt;
|s202746&lt;br /&gt;
|[[Quality Gates in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 9&lt;br /&gt;
|Lydia&lt;br /&gt;
|Tsintzou&lt;br /&gt;
|s193745&lt;br /&gt;
|[[SWOT Analysis Guide]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Kendra Ana&lt;br /&gt;
|Rodríguez López&lt;br /&gt;
|s200182&lt;br /&gt;
|[[Choosing by Advantages Decision-Making System]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Rasmus&lt;br /&gt;
|Engberg&lt;br /&gt;
|s164513&lt;br /&gt;
|[[RDM]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Christine&lt;br /&gt;
|Fryland&lt;br /&gt;
|s153875&lt;br /&gt;
|[[Theory X-Y]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Manas P.&lt;br /&gt;
|Dalvi&lt;br /&gt;
|s210143&lt;br /&gt;
|[[Effective Tools for Multiple Project Management]]&lt;br /&gt;
-&lt;br /&gt;
|-&lt;br /&gt;
|Group 12&lt;br /&gt;
|Joakim&lt;br /&gt;
|Vollertzen&lt;br /&gt;
|s163947&lt;br /&gt;
|[[Extreme Project Management (XPM)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Shubham&lt;br /&gt;
|Ingole&lt;br /&gt;
|s200092&lt;br /&gt;
|[[Stakeholder Management Strategies]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 31&lt;br /&gt;
|Alvaro&lt;br /&gt;
|Bello&lt;br /&gt;
|s210447&lt;br /&gt;
|[[Forecasting and estimation techniques]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 09&lt;br /&gt;
|Dorothea&lt;br /&gt;
|Georgiadou&lt;br /&gt;
|s200230&lt;br /&gt;
|[[Risk Register analysis]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 09&lt;br /&gt;
|Maria Konstantina&lt;br /&gt;
|Papaioannou&lt;br /&gt;
|s195550&lt;br /&gt;
|[[Fishbone diagram analysis]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 21&lt;br /&gt;
|Kelvin&lt;br /&gt;
|Scott-Fordsmand&lt;br /&gt;
|s174312&lt;br /&gt;
|[[RiskRegister]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Christoffer Friis&lt;br /&gt;
|Hansen&lt;br /&gt;
|s164569&lt;br /&gt;
|[[Identifying risk]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Giulia &lt;br /&gt;
|Zanelli&lt;br /&gt;
|s205701&lt;br /&gt;
|[[Earned Value Management - EVM]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 29&lt;br /&gt;
|Tinna &lt;br /&gt;
|Dofradottir&lt;br /&gt;
|s203177&lt;br /&gt;
|[[Adaptive Project Framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Jonatan Larsen&lt;br /&gt;
|Edry&lt;br /&gt;
|s165499&lt;br /&gt;
|[[The iron triangle as an analytical tool]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Mikkel Walther&lt;br /&gt;
|Hellesen&lt;br /&gt;
|s203227&lt;br /&gt;
|[[System Readiness Level Index]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Yamila Denise&lt;br /&gt;
|Aviles&lt;br /&gt;
|s203409&lt;br /&gt;
|[[Agile Release Train]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Kallina&lt;br /&gt;
|Karamitsiou&lt;br /&gt;
|s202249&lt;br /&gt;
|[[Kahneman&#039;s dual-system thinking]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Prasad&lt;br /&gt;
|Jagtap&lt;br /&gt;
|s200109&lt;br /&gt;
|[[Communication Management using Service Blueprint]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 3&lt;br /&gt;
|Johan Holger &lt;br /&gt;
|Rasmussen&lt;br /&gt;
|s210512&lt;br /&gt;
|[[Daniel Kahneman&#039;s two systems of thinking]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Sigrún Björk &lt;br /&gt;
|Sævarsdóttir&lt;br /&gt;
|s200165&lt;br /&gt;
|[[The Scrum framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Francesca&lt;br /&gt;
|Pieraccini&lt;br /&gt;
|s206673&lt;br /&gt;
|[[Double Diamond model]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 15&lt;br /&gt;
|Dionysios&lt;br /&gt;
|Dasopoulos&lt;br /&gt;
|s202916&lt;br /&gt;
|[[Tuckman&#039;s Model for Sustainable Team Development]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 15&lt;br /&gt;
|Joern&lt;br /&gt;
|Appelt&lt;br /&gt;
|s202854&lt;br /&gt;
|[[Intrinsic Motivation]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Oliver&lt;br /&gt;
|Karlsson&lt;br /&gt;
|s165080&lt;br /&gt;
|[[Double Diamond Model]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Victor&lt;br /&gt;
|Soler Fuertes&lt;br /&gt;
|s206040&lt;br /&gt;
|[[OKR - Objectives and Key Results]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 31&lt;br /&gt;
|João&lt;br /&gt;
|Ferreira&lt;br /&gt;
|s202867&lt;br /&gt;
|[[Psychological safety as a key factor to quality and productivity of Organizations]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 31&lt;br /&gt;
|Timo&lt;br /&gt;
|Scheitinger&lt;br /&gt;
|s202966&lt;br /&gt;
|[[The big five (OCEAN)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 15&lt;br /&gt;
|Maria-Lito&lt;br /&gt;
|Glykioti&lt;br /&gt;
|s151256&lt;br /&gt;
|[[The role of Emotional Intelligence in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 15&lt;br /&gt;
|Hafeez&lt;br /&gt;
|Ahmadi&lt;br /&gt;
|s164137&lt;br /&gt;
|[[ISM Principles of Change]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 21&lt;br /&gt;
|Magnus Riis&lt;br /&gt;
|Gregersen&lt;br /&gt;
|s214321&lt;br /&gt;
|[[Gantt Chart Scheduling]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Marie Elly Ulricke&lt;br /&gt;
|Kristensen&lt;br /&gt;
|s144408&lt;br /&gt;
|[[Motivation through Theory X&amp;amp;Y from a Project Management perspective]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Christopher &lt;br /&gt;
|Burgdorf&lt;br /&gt;
|s154689&lt;br /&gt;
|[[Simple Multi-Attribute Rating Technique (SMART)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Ishak&lt;br /&gt;
|Zaaimia&lt;br /&gt;
|s164631&lt;br /&gt;
|[[Parkinson&#039;s Law]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 11&lt;br /&gt;
|Sara Ballegaard&lt;br /&gt;
|Laursen&lt;br /&gt;
|s193723&lt;br /&gt;
|[[Organizational Socialization]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Ali Waleed&lt;br /&gt;
|Abbas&lt;br /&gt;
|s172841&lt;br /&gt;
|[[Fishbone diagram for root cause analysis]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 17&lt;br /&gt;
|Cecilia&lt;br /&gt;
|Thuy Duyen Nguyen-Cong&lt;br /&gt;
|s184300&lt;br /&gt;
|[[The 7 Habits of Highly Effective People by Stephen R. Covey]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 44&lt;br /&gt;
|Farah&lt;br /&gt;
|Sabri&lt;br /&gt;
|s164740&lt;br /&gt;
|[[Lack of communication in project management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Shakila&lt;br /&gt;
|Khan Malik&lt;br /&gt;
|s173780&lt;br /&gt;
|[[Risk]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Asbjørn Martin&lt;br /&gt;
|Kruuse&lt;br /&gt;
|s153470&lt;br /&gt;
|[[Chairing a meeting]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Tummas Dímun&lt;br /&gt;
|Mohr&lt;br /&gt;
|s160129&lt;br /&gt;
|[[Project Dashboards]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Vanessa &lt;br /&gt;
|Clausen&lt;br /&gt;
|s183302&lt;br /&gt;
|[[Overcoming small-big projects (Gantt)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 09&lt;br /&gt;
|Emil &lt;br /&gt;
|Ballermann&lt;br /&gt;
|s174393&lt;br /&gt;
|[[Parkinson&#039;s law and how to manage it]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Gian Marco&lt;br /&gt;
|Grieco&lt;br /&gt;
|s202893&lt;br /&gt;
|[[Parkinson&#039;s Law: achieving more in less time]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 44&lt;br /&gt;
|Shahad&lt;br /&gt;
|Abdelaziz&lt;br /&gt;
|s122945&lt;br /&gt;
|[[Outsourcing]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 3&lt;br /&gt;
|Tais&lt;br /&gt;
|Christiansen&lt;br /&gt;
|s165131&lt;br /&gt;
|[[Relationship of projects, programs and portfolios]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Sana&lt;br /&gt;
|Ilyas&lt;br /&gt;
|s192815&lt;br /&gt;
|[[SCRUM framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Mia Chrstine&lt;br /&gt;
|Wheitman&lt;br /&gt;
|s206053&lt;br /&gt;
|[[The use of Gantt Charts]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 35&lt;br /&gt;
|Sigurjón Bjarni&lt;br /&gt;
|Bjarnason&lt;br /&gt;
|s202049&lt;br /&gt;
|[[The Work breakdown structure(WBS)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Morten Dam&lt;br /&gt;
|Laursen&lt;br /&gt;
|s200364&lt;br /&gt;
|[[Multiple Project Management: Summary, Theory and Improvement]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 29&lt;br /&gt;
|Céline Engelbrecht&lt;br /&gt;
|Galea-Larsen&lt;br /&gt;
|s147312&lt;br /&gt;
|[[Group Development - The Tuckman Model]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Hazal &lt;br /&gt;
|Alawi&lt;br /&gt;
|s180408&lt;br /&gt;
|[[The Double Diamond Framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 17&lt;br /&gt;
|Xenia&lt;br /&gt;
|Jørgensen&lt;br /&gt;
|s123633&lt;br /&gt;
|[[Teams - Creation and optimisation]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 11&lt;br /&gt;
|Jonas &lt;br /&gt;
|Bøje Simonsen&lt;br /&gt;
|s154089&lt;br /&gt;
|[[Logic tree and the Answer First Methodology]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Kavikrishnan&lt;br /&gt;
|Balakrishnan&lt;br /&gt;
|s164338&lt;br /&gt;
|[[Learning plans for high uncertainty projects]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 2&lt;br /&gt;
|Riccardo&lt;br /&gt;
|Pollacchini&lt;br /&gt;
|s192412&lt;br /&gt;
|[[Complex Project Management (CPM)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 44&lt;br /&gt;
|Rokiya &lt;br /&gt;
|Ahmed Ramzy&lt;br /&gt;
|s170501&lt;br /&gt;
|[[Lean in construction industry]]&lt;br /&gt;
|-&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Articles_Spring_Term_2021&amp;diff=91321</id>
		<title>Articles Spring Term 2021</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Articles_Spring_Term_2021&amp;diff=91321"/>
		<updated>2021-02-22T08:36:35Z</updated>

		<summary type="html">&lt;p&gt;Roki: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=Overview of 2021 Wiki Collections=&lt;br /&gt;
&lt;br /&gt;
{| class=&amp;quot;wikitable sortable&amp;quot;&lt;br /&gt;
|+Spring Term 2021 Wiki Collections&lt;br /&gt;
|Group name&lt;br /&gt;
|First name&lt;br /&gt;
|Surname&lt;br /&gt;
|Student number&lt;br /&gt;
|[[Article name]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|TAs Example&lt;br /&gt;
|Thomas&lt;br /&gt;
|Giannoulopoulos&lt;br /&gt;
|s192419&lt;br /&gt;
|[[APPM Example 2021]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 12&lt;br /&gt;
|Christian&lt;br /&gt;
|Frøsig&lt;br /&gt;
|s175044&lt;br /&gt;
|[[Belbin&#039;s 9 team roles]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Oliver&lt;br /&gt;
|K. Vittrup&lt;br /&gt;
|s163754&lt;br /&gt;
|[[Top-down vs bottom-up estimations]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|44&lt;br /&gt;
|Jeyad&lt;br /&gt;
|M. Baig&lt;br /&gt;
|s153585&lt;br /&gt;
|[[Planning Methods - 3 Levels of Project Planning]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 17&lt;br /&gt;
|Quoc-Khanh Rose-Marie Therese&lt;br /&gt;
|Madsen&lt;br /&gt;
|s123462&lt;br /&gt;
|[[Applying Tuckman’s model for team development]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|31&lt;br /&gt;
|Haoxiang&lt;br /&gt;
|Sang&lt;br /&gt;
|s192258&lt;br /&gt;
|[[Cost control with statistic tools]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 31&lt;br /&gt;
|He&lt;br /&gt;
|Fan&lt;br /&gt;
|s192195&lt;br /&gt;
|[[Work Break-down Structure]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Ángel&lt;br /&gt;
|Castro del Olmo&lt;br /&gt;
|s193246&lt;br /&gt;
|[[Stakeholder Engagement and Sustainability in Maritime Spatial Planning]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|44&lt;br /&gt;
|Abdullah Shams&lt;br /&gt;
|Turkmani&lt;br /&gt;
|s153337&lt;br /&gt;
|[[ICT Agreement]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 17&lt;br /&gt;
|Jacopo&lt;br /&gt;
|Renzi&lt;br /&gt;
|s210445&lt;br /&gt;
|[[Double Diamond in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 35&lt;br /&gt;
|Helga Sigríður&lt;br /&gt;
|Magnúsdóttir&lt;br /&gt;
|s202027&lt;br /&gt;
|[[Network Planning]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|12&lt;br /&gt;
|Cæcilie&lt;br /&gt;
|Kortbæk&lt;br /&gt;
|163873&lt;br /&gt;
|[[Double diamond]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Frithjof Johannes&lt;br /&gt;
|Thiem&lt;br /&gt;
|s202972&lt;br /&gt;
|[[DevOps]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|12&lt;br /&gt;
|Emilie&lt;br /&gt;
|Winther Schmidt&lt;br /&gt;
|163884&lt;br /&gt;
|[[Iron Triangle]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|12&lt;br /&gt;
|Anna&lt;br /&gt;
|Fredgaard&lt;br /&gt;
|s163887&lt;br /&gt;
|[[Active Listening Technique]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|35&lt;br /&gt;
|Ruben&lt;br /&gt;
|Raes&lt;br /&gt;
|s202029&lt;br /&gt;
|[[Iron Triangle of Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|21&lt;br /&gt;
|Claudia&lt;br /&gt;
|Balcells&lt;br /&gt;
|s202939&lt;br /&gt;
|[[APPPM Issue Tree]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|35&lt;br /&gt;
|Brynja&lt;br /&gt;
|Gudmundsdottir&lt;br /&gt;
|s202030&lt;br /&gt;
|[[FAST goals]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|16&lt;br /&gt;
|Andrea&lt;br /&gt;
|Pin Morales&lt;br /&gt;
|s205567&lt;br /&gt;
|[[The Business Case]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|16&lt;br /&gt;
|Lena Maria&lt;br /&gt;
|Thyen&lt;br /&gt;
|s202969&lt;br /&gt;
|[[The 7 Habits of Highly Effective People]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|35&lt;br /&gt;
|Úlfar&lt;br /&gt;
|Viktorsson&lt;br /&gt;
|s202022&lt;br /&gt;
|[[The 4 Disciplines of Execution]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|16&lt;br /&gt;
|Moritz&lt;br /&gt;
|Rindermann&lt;br /&gt;
|s202976&lt;br /&gt;
|[[Tuckmans model for Team Development]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 29&lt;br /&gt;
|Heiðdís Ósk&lt;br /&gt;
|Pétursdóttir&lt;br /&gt;
|s202025&lt;br /&gt;
|[[Efficiency and Effectiveness]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|31&lt;br /&gt;
|Xabier&lt;br /&gt;
|Martínez de Zabarte&lt;br /&gt;
|s210323&lt;br /&gt;
|[[Scrumban]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|17&lt;br /&gt;
|Aldís Braga&lt;br /&gt;
|Eiríksdóttir&lt;br /&gt;
|s202045&lt;br /&gt;
|[[Blake-Mouton Managerial Grid]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|32&lt;br /&gt;
|Jan Otis&lt;br /&gt;
| Ernst&lt;br /&gt;
|s210433&lt;br /&gt;
|[[RACI Matrix]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|3&lt;br /&gt;
|Julie&lt;br /&gt;
| Finne-Ipsen&lt;br /&gt;
|s153987&lt;br /&gt;
|[[Kahneman - Two Thinking Systems]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|24&lt;br /&gt;
|Maria Eileen&lt;br /&gt;
| Hubbuck&lt;br /&gt;
|s210444&lt;br /&gt;
|[[Risk Management-Identification]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|11&lt;br /&gt;
|Alina&lt;br /&gt;
| Barun&lt;br /&gt;
|s202514&lt;br /&gt;
|[[Maslow&#039;s Hierarchy of Needs]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|24&lt;br /&gt;
|Felix Vinzenz&lt;br /&gt;
|Wütherich&lt;br /&gt;
|s202968&lt;br /&gt;
|[[Emotional Intelligence and Leadership]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|28&lt;br /&gt;
|Ariadna&lt;br /&gt;
|Ramos&lt;br /&gt;
|s191852&lt;br /&gt;
|[[The Work Breakdown Structure (WBS)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Jakob&lt;br /&gt;
|Grønvald&lt;br /&gt;
|s164346&lt;br /&gt;
|[[Maslow‘s Hierarchy of Needs, Motivation in the workplace]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 16&lt;br /&gt;
|Martina&lt;br /&gt;
|Rampazzo&lt;br /&gt;
|s202895&lt;br /&gt;
|[[Earned value management (EVM)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 2&lt;br /&gt;
|John&lt;br /&gt;
|Fritz&lt;br /&gt;
|s202967&lt;br /&gt;
|[[Learning plan]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 24&lt;br /&gt;
|Henning&lt;br /&gt;
|Duwe&lt;br /&gt;
|s210450&lt;br /&gt;
|[[SWOT Analysis]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|Søren Emil&lt;br /&gt;
|Kjær&lt;br /&gt;
|s201528&lt;br /&gt;
|[[GANTT]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Mathilde Kremmer&lt;br /&gt;
|Broberg&lt;br /&gt;
|s175074&lt;br /&gt;
|[[Corrective and Preventive Actions (CAPA)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|Rune Lykke&lt;br /&gt;
|Høg&lt;br /&gt;
|s165012&lt;br /&gt;
|[[The use of the A3 management process]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 35&lt;br /&gt;
|Tinna Hrönn&lt;br /&gt;
|Unudóttir&lt;br /&gt;
|s202032&lt;br /&gt;
|[[Constructive communication]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 17&lt;br /&gt;
|Eva Rún&lt;br /&gt;
|Arnarsdóttir&lt;br /&gt;
|s203214&lt;br /&gt;
|[[Biases in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 24&lt;br /&gt;
|Astrid&lt;br /&gt;
|Skovhus&lt;br /&gt;
|s164499&lt;br /&gt;
|[[Getting Things Done (GTD)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 7&lt;br /&gt;
|Phillip&lt;br /&gt;
|Dyrberg&lt;br /&gt;
|s164503&lt;br /&gt;
|[[Double diamond: A design process model]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|Amanda Emilie&lt;br /&gt;
|Søborg Berthelsen&lt;br /&gt;
|s154707&lt;br /&gt;
|[[The Johari Window]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Nicolai Mossing&lt;br /&gt;
|Madsen&lt;br /&gt;
|s164515&lt;br /&gt;
|[[SMART Goals (Specific, Measurable, Attainable, Relevant, Time-bound)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Marie-Louise Wolfsberg&lt;br /&gt;
|Schmidt&lt;br /&gt;
|s164417&lt;br /&gt;
|[[The Affect Heuristic]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Erika Marie&lt;br /&gt;
|Strøm&lt;br /&gt;
|s203224&lt;br /&gt;
|[[Parkinson&#039;s Law in Project Schedule Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 16&lt;br /&gt;
|Beatrice&lt;br /&gt;
|Ranzato&lt;br /&gt;
|s202887&lt;br /&gt;
|[[X-Matrix Hoshin Kanri]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 9&lt;br /&gt;
|Helene Waldmann&lt;br /&gt;
|Jørgensen&lt;br /&gt;
|s173891&lt;br /&gt;
|[[Lag &amp;amp; Lead]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Zahra&lt;br /&gt;
|Al-Mosawi&lt;br /&gt;
|s193938&lt;br /&gt;
|[[Belbin Team Roles in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|William Axel Linderoth&lt;br /&gt;
|Michaelen&lt;br /&gt;
|s153275&lt;br /&gt;
|[[Design-Build]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 31&lt;br /&gt;
|Jesús &lt;br /&gt;
|Gracia Yoldi&lt;br /&gt;
|s210111&lt;br /&gt;
|[[Kanban in APPPM]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 35&lt;br /&gt;
|Katrín Erla &lt;br /&gt;
|Bergsveinsdóttir&lt;br /&gt;
|s202026&lt;br /&gt;
|[[Contingency plans]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Cecilie Marie Raagaard &lt;br /&gt;
|Christensen&lt;br /&gt;
|s160832&lt;br /&gt;
|[[Work breakdown structure (WBS)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Ali Jamal&lt;br /&gt;
|Jomeh&lt;br /&gt;
|s173741&lt;br /&gt;
|[[SMART goals: A project management tool]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 15&lt;br /&gt;
|Tobias &lt;br /&gt;
|Hyldmo&lt;br /&gt;
|s206658&lt;br /&gt;
|[[High performing teams]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Samah&lt;br /&gt;
|Said&lt;br /&gt;
|s203228&lt;br /&gt;
|[[Reference class forecasting]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 3&lt;br /&gt;
|Emilie&lt;br /&gt;
|Torp&lt;br /&gt;
|s153320&lt;br /&gt;
|[[Goal Hierarchy]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 3&lt;br /&gt;
|Victor Nørregaard&lt;br /&gt;
|Schwærter&lt;br /&gt;
|s164745&lt;br /&gt;
|[[Milestone Planning]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 9&lt;br /&gt;
|Jacob&lt;br /&gt;
|Ammitsøe&lt;br /&gt;
|s173849&lt;br /&gt;
|[[Authenticity]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Anna&lt;br /&gt;
|Bjørn Reland&lt;br /&gt;
|s154556&lt;br /&gt;
|[[Choosing the appropriate medium (oral – written – hybrids)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 10&lt;br /&gt;
|Wail&lt;br /&gt;
|Atrari&lt;br /&gt;
|s170706&lt;br /&gt;
|[[The Double Diamond Tool: Prevent budget overruns and delays in your projects]]&lt;br /&gt;
|-&lt;br /&gt;
|Group 10&lt;br /&gt;
|Helená Evin&lt;br /&gt;
|Cinar&lt;br /&gt;
|s164741&lt;br /&gt;
|[[SWOT Analysis Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 10&lt;br /&gt;
|Mohammad&lt;br /&gt;
|Abou Hassan&lt;br /&gt;
|s160101&lt;br /&gt;
|[[Implementing SWOT]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 10&lt;br /&gt;
|Ahmet&lt;br /&gt;
|Akgül&lt;br /&gt;
|s152597&lt;br /&gt;
|[[Smart goals (Specific, Measurable, Achievable, Realistic, and Timely)]]&lt;br /&gt;
|- &lt;br /&gt;
|- &lt;br /&gt;
|Group 2&lt;br /&gt;
|Amalie&lt;br /&gt;
|N. Müller&lt;br /&gt;
|s173675&lt;br /&gt;
|[[Big five personality traits (OCEAN model)]]&lt;br /&gt;
|- &lt;br /&gt;
|- &lt;br /&gt;
|Group 29&lt;br /&gt;
|Pétursdóttir&lt;br /&gt;
|Stefanía Ósk&lt;br /&gt;
|s202044&lt;br /&gt;
|[[Situational leadership - Hersey and Blanchard]]&lt;br /&gt;
|- &lt;br /&gt;
|- &lt;br /&gt;
|Group 10&lt;br /&gt;
|Abdulahi&lt;br /&gt;
|Hayle Hassan&lt;br /&gt;
|s164691&lt;br /&gt;
|[[Stakeholder management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Louise&lt;br /&gt;
|Landschoff&lt;br /&gt;
|s165111&lt;br /&gt;
|[[SCRUM - A Project Management Framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 10&lt;br /&gt;
|Sara&lt;br /&gt;
|Alabiidi&lt;br /&gt;
|s164650&lt;br /&gt;
|[[The Blake-Mouton Managerial Grid]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Felix&lt;br /&gt;
|Dressel&lt;br /&gt;
|s202965&lt;br /&gt;
|[[The SPALTEN Problem-Solving Methodology as a Decision Making Tool in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 11&lt;br /&gt;
|Sandra&lt;br /&gt;
|Nielsen&lt;br /&gt;
|s153370&lt;br /&gt;
|[[Conflict ladder]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 11&lt;br /&gt;
|Lise Munch&lt;br /&gt;
|Nordheim&lt;br /&gt;
|s200400&lt;br /&gt;
|[[McGregor&#039;s X &amp;amp; Y theory]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 2&lt;br /&gt;
|Simon&lt;br /&gt;
|Knutsson&lt;br /&gt;
|s202041&lt;br /&gt;
|[[Earned Value Management (EVM)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 12&lt;br /&gt;
|Christoffer&lt;br /&gt;
|Askgaard&lt;br /&gt;
|s165098&lt;br /&gt;
|[[Design the team you need to succeed using Belbin&#039;s team roles]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 24&lt;br /&gt;
|Gaute Bø&lt;br /&gt;
|Aaløkken&lt;br /&gt;
|s202065&lt;br /&gt;
|[[Diversity in teams]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 2&lt;br /&gt;
|Lukas&lt;br /&gt;
|Tanzer&lt;br /&gt;
|s200120&lt;br /&gt;
|[[Continuous Improvement]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 7&lt;br /&gt;
|Sofie&lt;br /&gt;
|Lundsteen&lt;br /&gt;
|s170285&lt;br /&gt;
|[[Team roles at work]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|FIRST NAME&lt;br /&gt;
|LAST NAME&lt;br /&gt;
|STUDY ID&lt;br /&gt;
|[[Applying the Hawthorne studies to project management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 3&lt;br /&gt;
|Amalie Nordstrøm&lt;br /&gt;
|Nielsen&lt;br /&gt;
|s153272&lt;br /&gt;
|[[The seven characteristic principles]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 14&lt;br /&gt;
|Louise Damborg&lt;br /&gt;
|Frederiksen&lt;br /&gt;
|s185238&lt;br /&gt;
|[[Using Facilitation to Mitigate Bias in a Team Setting]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Georg Holger&lt;br /&gt;
|Waage&lt;br /&gt;
|s163819&lt;br /&gt;
|[[Fishbone Diagram]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Özgenur&lt;br /&gt;
|Baştuğ&lt;br /&gt;
|s203033&lt;br /&gt;
|[[Variation Orders in Construction Projects]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 9&lt;br /&gt;
|Mads&lt;br /&gt;
|Møhlenberg&lt;br /&gt;
|s173879&lt;br /&gt;
|[[A hybrid consisting of Agile and Stage Gate]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 29&lt;br /&gt;
|Svanhvít Birta&lt;br /&gt;
|Guðmundsdóttir&lt;br /&gt;
|s203174&lt;br /&gt;
|[[Project Milestones]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Bente&lt;br /&gt;
|Meidahl Münsberg&lt;br /&gt;
|s175068&lt;br /&gt;
|[[Gantt Charts]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Frederik&lt;br /&gt;
|Carlsson &lt;br /&gt;
|s164345&lt;br /&gt;
|[[FAST Goals]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 11&lt;br /&gt;
|Tobias&lt;br /&gt;
|Rydahl &lt;br /&gt;
|s200471&lt;br /&gt;
|[[Using DISC assessment for project team management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 7&lt;br /&gt;
|Mads &lt;br /&gt;
|Støjfer-Hønberg&lt;br /&gt;
|s174303&lt;br /&gt;
|[[SCRUM - An Agile Project Management Framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 21&lt;br /&gt;
|Matthieu &lt;br /&gt;
|Buy&lt;br /&gt;
|s202925&lt;br /&gt;
|[[The Five-Factor Model (OCEAN)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Astrid Helene&lt;br /&gt;
|Erecius&lt;br /&gt;
|s171013&lt;br /&gt;
|[[Choosing communication media for negotiation]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 44&lt;br /&gt;
|Zainab&lt;br /&gt;
|Jalal&lt;br /&gt;
|s165491&lt;br /&gt;
|[[Work Breakdown Structure in project management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 2&lt;br /&gt;
|Anna Felicia Mai&lt;br /&gt;
|Lindström&lt;br /&gt;
|s202046&lt;br /&gt;
|[[Project Status Reporting]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Alberto&lt;br /&gt;
|Melloni&lt;br /&gt;
|s202894&lt;br /&gt;
|[[Pre-mortem analysis]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 29&lt;br /&gt;
|Thore Uwe&lt;br /&gt;
|Aye&lt;br /&gt;
|s202746&lt;br /&gt;
|[[Quality Gates in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 9&lt;br /&gt;
|Lydia&lt;br /&gt;
|Tsintzou&lt;br /&gt;
|s193745&lt;br /&gt;
|[[SWOT Analysis Guide]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Kendra Ana&lt;br /&gt;
|Rodríguez López&lt;br /&gt;
|s200182&lt;br /&gt;
|[[Choosing by Advantages Decision-Making System]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Rasmus&lt;br /&gt;
|Engberg&lt;br /&gt;
|s164513&lt;br /&gt;
|[[RDM]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Christine&lt;br /&gt;
|Fryland&lt;br /&gt;
|s153875&lt;br /&gt;
|[[Theory X-Y]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Manas P.&lt;br /&gt;
|Dalvi&lt;br /&gt;
|s210143&lt;br /&gt;
|[[Effective Tools for Multiple Project Management]]&lt;br /&gt;
-&lt;br /&gt;
|-&lt;br /&gt;
|Group 12&lt;br /&gt;
|Joakim&lt;br /&gt;
|Vollertzen&lt;br /&gt;
|s163947&lt;br /&gt;
|[[Extreme Project Management (XPM)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Shubham&lt;br /&gt;
|Ingole&lt;br /&gt;
|s200092&lt;br /&gt;
|[[Stakeholder Management Strategies]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 31&lt;br /&gt;
|Alvaro&lt;br /&gt;
|Bello&lt;br /&gt;
|s210447&lt;br /&gt;
|[[Forecasting and estimation techniques]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 09&lt;br /&gt;
|Dorothea&lt;br /&gt;
|Georgiadou&lt;br /&gt;
|s200230&lt;br /&gt;
|[[Risk Register analysis]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 09&lt;br /&gt;
|Maria Konstantina&lt;br /&gt;
|Papaioannou&lt;br /&gt;
|s195550&lt;br /&gt;
|[[Fishbone diagram analysis]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 21&lt;br /&gt;
|Kelvin&lt;br /&gt;
|Scott-Fordsmand&lt;br /&gt;
|s174312&lt;br /&gt;
|[[RiskRegister]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Christoffer Friis&lt;br /&gt;
|Hansen&lt;br /&gt;
|s164569&lt;br /&gt;
|[[Identifying risk]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Giulia &lt;br /&gt;
|Zanelli&lt;br /&gt;
|s205701&lt;br /&gt;
|[[Earned Value Management - EVM]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 29&lt;br /&gt;
|Tinna &lt;br /&gt;
|Dofradottir&lt;br /&gt;
|s203177&lt;br /&gt;
|[[Adaptive Project Framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Jonatan Larsen&lt;br /&gt;
|Edry&lt;br /&gt;
|s165499&lt;br /&gt;
|[[The iron triangle as an analytical tool]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Mikkel Walther&lt;br /&gt;
|Hellesen&lt;br /&gt;
|s203227&lt;br /&gt;
|[[System Readiness Level Index]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Yamila Denise&lt;br /&gt;
|Aviles&lt;br /&gt;
|s203409&lt;br /&gt;
|[[Agile Release Train]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Kallina&lt;br /&gt;
|Karamitsiou&lt;br /&gt;
|s202249&lt;br /&gt;
|[[Kahneman&#039;s dual-system thinking]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Prasad&lt;br /&gt;
|Jagtap&lt;br /&gt;
|s200109&lt;br /&gt;
|[[Communication Management using Service Blueprint]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 3&lt;br /&gt;
|Johan Holger &lt;br /&gt;
|Rasmussen&lt;br /&gt;
|s210512&lt;br /&gt;
|[[Daniel Kahneman&#039;s two systems of thinking]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Sigrún Björk &lt;br /&gt;
|Sævarsdóttir&lt;br /&gt;
|s200165&lt;br /&gt;
|[[The Scrum framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Francesca&lt;br /&gt;
|Pieraccini&lt;br /&gt;
|s206673&lt;br /&gt;
|[[Double Diamond model]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 15&lt;br /&gt;
|Dionysios&lt;br /&gt;
|Dasopoulos&lt;br /&gt;
|s202916&lt;br /&gt;
|[[Tuckman&#039;s Model for Sustainable Team Development]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 15&lt;br /&gt;
|Joern&lt;br /&gt;
|Appelt&lt;br /&gt;
|s202854&lt;br /&gt;
|[[Intrinsic Motivation]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Oliver&lt;br /&gt;
|Karlsson&lt;br /&gt;
|s165080&lt;br /&gt;
|[[Double Diamond Model]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Victor&lt;br /&gt;
|Soler Fuertes&lt;br /&gt;
|s206040&lt;br /&gt;
|[[OKR - Objectives and Key Results]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 31&lt;br /&gt;
|João&lt;br /&gt;
|Ferreira&lt;br /&gt;
|s202867&lt;br /&gt;
|[[Psychological safety as a key factor to quality and productivity of Organizations]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 31&lt;br /&gt;
|Timo&lt;br /&gt;
|Scheitinger&lt;br /&gt;
|s202966&lt;br /&gt;
|[[The big five (OCEAN)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 15&lt;br /&gt;
|Maria-Lito&lt;br /&gt;
|Glykioti&lt;br /&gt;
|s151256&lt;br /&gt;
|[[The role of Emotional Intelligence in Project Management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 15&lt;br /&gt;
|Hafeez&lt;br /&gt;
|Ahmadi&lt;br /&gt;
|s164137&lt;br /&gt;
|[[ISM Principles of Change]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 21&lt;br /&gt;
|Magnus Riis&lt;br /&gt;
|Gregersen&lt;br /&gt;
|s214321&lt;br /&gt;
|[[Gantt Chart Scheduling]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Marie Elly Ulricke&lt;br /&gt;
|Kristensen&lt;br /&gt;
|s144408&lt;br /&gt;
|[[Motivation through Theory X&amp;amp;Y from a Project Management perspective]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 18&lt;br /&gt;
|Christopher &lt;br /&gt;
|Burgdorf&lt;br /&gt;
|s154689&lt;br /&gt;
|[[Simple Multi-Attribute Rating Technique (SMART)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Ishak&lt;br /&gt;
|Zaaimia&lt;br /&gt;
|s164631&lt;br /&gt;
|[[Parkinson&#039;s Law]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 11&lt;br /&gt;
|Sara Ballegaard&lt;br /&gt;
|Laursen&lt;br /&gt;
|s193723&lt;br /&gt;
|[[Organizational Socialization]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Ali Waleed&lt;br /&gt;
|Abbas&lt;br /&gt;
|s172841&lt;br /&gt;
|[[Fishbone diagram for root cause analysis]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 17&lt;br /&gt;
|Cecilia&lt;br /&gt;
|Thuy Duyen Nguyen-Cong&lt;br /&gt;
|s184300&lt;br /&gt;
|[[The 7 Habits of Highly Effective People by Stephen R. Covey]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 44&lt;br /&gt;
|Farah&lt;br /&gt;
|Sabri&lt;br /&gt;
|s164740&lt;br /&gt;
|[[Lack of communication in project management]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 1&lt;br /&gt;
|Shakila&lt;br /&gt;
|Khan Malik&lt;br /&gt;
|s173780&lt;br /&gt;
|[[Risk]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Asbjørn Martin&lt;br /&gt;
|Kruuse&lt;br /&gt;
|s153470&lt;br /&gt;
|[[Chairing a meeting]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 23&lt;br /&gt;
|Tummas Dímun&lt;br /&gt;
|Mohr&lt;br /&gt;
|s160129&lt;br /&gt;
|[[Project Dashboards]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 27&lt;br /&gt;
|Vanessa &lt;br /&gt;
|Clausen&lt;br /&gt;
|s183302&lt;br /&gt;
|[[Overcoming small-big projects (Gantt)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 09&lt;br /&gt;
|Emil &lt;br /&gt;
|Ballermann&lt;br /&gt;
|s174393&lt;br /&gt;
|[[Parkinson&#039;s law and how to manage it]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Gian Marco&lt;br /&gt;
|Grieco&lt;br /&gt;
|s202893&lt;br /&gt;
|[[Parkinson&#039;s Law: achieving more in less time]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 44&lt;br /&gt;
|Shahad&lt;br /&gt;
|Abdelaziz&lt;br /&gt;
|s122945&lt;br /&gt;
|[[Outsourcing]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 3&lt;br /&gt;
|Tais&lt;br /&gt;
|Christiansen&lt;br /&gt;
|s165131&lt;br /&gt;
|[[Relationship of projects, programs and portfolios]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 4&lt;br /&gt;
|Sana&lt;br /&gt;
|Ilyas&lt;br /&gt;
|s192815&lt;br /&gt;
|[[SCRUM framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 5&lt;br /&gt;
|Mia Chrstine&lt;br /&gt;
|Wheitman&lt;br /&gt;
|s206053&lt;br /&gt;
|[[The use of Gantt Charts]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 35&lt;br /&gt;
|Sigurjón Bjarni&lt;br /&gt;
|Bjarnason&lt;br /&gt;
|s202049&lt;br /&gt;
|[[The Work breakdown structure(WBS)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 19&lt;br /&gt;
|Morten Dam&lt;br /&gt;
|Laursen&lt;br /&gt;
|s200364&lt;br /&gt;
|[[Multiple Project Management: Summary, Theory and Improvement]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 29&lt;br /&gt;
|Céline Engelbrecht&lt;br /&gt;
|Galea-Larsen&lt;br /&gt;
|s147312&lt;br /&gt;
|[[Group Development - The Tuckman Model]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Hazal &lt;br /&gt;
|Alawi&lt;br /&gt;
|s180408&lt;br /&gt;
|[[The Double Diamond Framework]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 17&lt;br /&gt;
|Xenia&lt;br /&gt;
|Jørgensen&lt;br /&gt;
|s123633&lt;br /&gt;
|[[Teams - Creation and optimisation]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 11&lt;br /&gt;
|Jonas &lt;br /&gt;
|Bøje Simonsen&lt;br /&gt;
|s154089&lt;br /&gt;
|[[Logic tree and the Answer First Methodology]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 28&lt;br /&gt;
|Kavikrishnan&lt;br /&gt;
|Balakrishnan&lt;br /&gt;
|s164338&lt;br /&gt;
|[[Learning plans for high uncertainty projects]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 2&lt;br /&gt;
|Riccardo&lt;br /&gt;
|Pollacchini&lt;br /&gt;
|s192412&lt;br /&gt;
|[[Complex Project Management (CPM)]]&lt;br /&gt;
|-&lt;br /&gt;
|-&lt;br /&gt;
|Group 44&lt;br /&gt;
|Rokiya &lt;br /&gt;
|Ahmed Ramzy&lt;br /&gt;
|s170501&lt;br /&gt;
|[[APPM Example 2021]]&lt;br /&gt;
|-&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91050</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91050"/>
		<updated>2021-02-21T22:46:42Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91048</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91048"/>
		<updated>2021-02-21T22:46:02Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9a&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91042</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91042"/>
		<updated>2021-02-21T22:44:52Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91039</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91039"/>
		<updated>2021-02-21T22:44:26Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9a&amp;quot;&amp;gt;  bla bla bla &amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91035</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91035"/>
		<updated>2021-02-21T22:43:47Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9a&amp;quot;&amp;gt; &lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;10a&amp;quot;&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91026</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91026"/>
		<updated>2021-02-21T22:42:50Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean implementation strategies: How are the Toyota Way principles addressed?&amp;quot; November 2016.&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91024</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91024"/>
		<updated>2021-02-21T22:42:15Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91020</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91020"/>
		<updated>2021-02-21T22:41:45Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91018</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91018"/>
		<updated>2021-02-21T22:41:32Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Implementing Lean */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &amp;lt;ref name=&amp;quot;10a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;  LEAN IMPLEMENTATION STRATEGIES: HOW ARE THE TOYOTA WAY PRINCIPLES ADDRESSED?&amp;quot; puplished November, 2016 &amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91013</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91013"/>
		<updated>2021-02-21T22:40:36Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;9ab&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;  LEAN IMPLEMENTATION STRATEGIES: HOW ARE THE TOYOTA WAY PRINCIPLES ADDRESSED?&amp;quot; puplished November, 2016 &amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91009</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91009"/>
		<updated>2021-02-21T22:40:06Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Implementing Lean */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;9ab&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;rr&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;  LEAN IMPLEMENTATION STRATEGIES: HOW ARE THE TOYOTA WAY PRINCIPLES ADDRESSED?&amp;quot; puplished November, 2016 &amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91007</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91007"/>
		<updated>2021-02-21T22:39:36Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Implementing Lean */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;10&amp;quot; /&amp;gt;. The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;rr&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;  LEAN IMPLEMENTATION STRATEGIES: HOW ARE THE TOYOTA WAY PRINCIPLES ADDRESSED?&amp;quot; puplished November, 2016 &amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91003</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91003"/>
		<updated>2021-02-21T22:38:45Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment&amp;lt;ref name=&amp;quot;rr&amp;quot; /&amp;gt;.  The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;rr&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;  LEAN IMPLEMENTATION STRATEGIES: HOW ARE THE TOYOTA WAY PRINCIPLES ADDRESSED?&amp;quot; puplished November, 2016 &amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91000</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=91000"/>
		<updated>2021-02-21T22:38:04Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Implementing Lean */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment&amp;lt;ref name=&amp;quot;rr&amp;quot; /&amp;gt;.  The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1b&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;LEAN IMPLEMENTATION STRATEGIES: HOW ARE THE TOYOTA WAY PRINCIPLES ADDRESSED?&amp;quot; puplished November, 2016 &amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=90999</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=90999"/>
		<updated>2021-02-21T22:37:41Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment&amp;lt;ref name=&amp;quot;1b&amp;quot; /&amp;gt;.  The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1b&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;LEAN IMPLEMENTATION STRATEGIES: HOW ARE THE TOYOTA WAY PRINCIPLES ADDRESSED?&amp;quot; puplished November, 2016 &amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=90998</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=90998"/>
		<updated>2021-02-21T22:37:30Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* Implementing Lean */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment&amp;lt;ref name=&amp;quot;1b&amp;quot; /&amp;gt;.  The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=90997</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=90997"/>
		<updated>2021-02-21T22:37:05Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;1b&amp;quot; /&amp;gt;.  The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
	<entry>
		<id>http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=90994</id>
		<title>Lean in construction industry</title>
		<link rel="alternate" type="text/html" href="http://13.50.150.85/index.php?title=Lean_in_construction_industry&amp;diff=90994"/>
		<updated>2021-02-21T22:36:49Z</updated>

		<summary type="html">&lt;p&gt;Roki: /* References */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==Abstract==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The construction industry is one of the largest and most markable industries worldwide. As most of the professions, the construction industry has some chronic problems such as low productivity, poor safety, inferior working conditions, and insufficient quality &amp;lt;ref name=&amp;quot;1a&amp;quot; /&amp;gt; &lt;br /&gt;
&lt;br /&gt;
These problems are serious diseases which should be managed. They cannot be eliminated completely but can be reduced and handled by specific tools and engagements.  Due to the large extend of this industry, there are many aspects which can be optimized and developed. One of the most important challenges in this industry is the wastage. To maintain a sustainable and justified project, it is necessary to apply some approaches seeking towards a decreased amount of wastage.  One of the approaches and groundbreaking tools is LEAN. &lt;br /&gt;
&lt;br /&gt;
LEAN construction is a phenomenon inspired by LEAN Management. The arise of LEAN in the construction industry emerged first time in the 1990’s in the West, since there were seen huge success and optimization in the manufacturing industry&amp;lt;ref name=&amp;quot;2a&amp;quot; /&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
The core idea of LEAN is to maximize value and eliminate or minimize waste, regardless of which area it is applied to, even if it is a single process. This makes the LEAN thinking one of the best in creating value for the customers and their needs. With other words LEAN is an efficient management technique which strives to meet the customer in eye level and offer them an instant customized product or service  &lt;br /&gt;
LEAN thinking operates overall with 5 key principles that aims to optimize and develop projects:  (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection &amp;lt;ref name=&amp;quot;3a&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
The arise and development of Lean found place in the Japanese car company Toyota. This new phenomenon revolutionized the manufacturing industry, particularly the production of automobiles. The trend was first introduced by John Krafick in the 1988, while the definition of Lean was first time given in the 1996 by James Womack and Daniel Jones.  &lt;br /&gt;
&lt;br /&gt;
Toyota production system had a completely different process than the mass production system of Henry Ford automobiles. Toyota production line was based on two concepts; “Jidoka” and “Just-in-time” &amp;lt;ref name=&amp;quot;4a&amp;quot; /&amp;gt; &lt;br /&gt;
The first mentioned is translated to “automation with a human touch” which means, that each time a problem emerge, the whole production line will stop, to prevent defect objects. The second is based on a production system, that only produce what is needed. &lt;br /&gt;
The arise of Lean left an imprint on the manufacturing industry, since Lean had a potential of reducing wastes and optimize processes.&lt;br /&gt;
Lean construction was developed in the 1990’s by Glenn Ballard and Greg Howell&amp;lt;ref name=&amp;quot;5a&amp;quot; /&amp;gt; . The development of Lean was created to improve the management of construction projects. This was done because there was seen common and similar challenges in the manufacturing sector as construction industry.&lt;br /&gt;
&lt;br /&gt;
==Big Idea==&lt;br /&gt;
&lt;br /&gt;
===Utilization===&lt;br /&gt;
Utilization is an act which is very worshipped within LEAN thinking. Every property whether it is resources, products or knowledge should be utilized to decrease waste and maximize the profit of the project or company. Even employee’s skills, talents and capabilities should be utilized and distributed where it is most beneficial. Experiences shows that low utilization often leads to undesirable events. The most common of them is delays.   &lt;br /&gt;
&lt;br /&gt;
One of the major activities to utilize resources is planning and coordinating &amp;lt;ref name=&amp;quot;6a&amp;quot; /&amp;gt; . Especially the activities that are done by multiple groups of people need to be scheduled, to create synergy in the project environment.  Coordinating is then necessary to ensure utilization of the resources yet maintain a realistic and feasible approach.    &lt;br /&gt;
&lt;br /&gt;
Utilization is as on-going process which is meant to start already in the early stages of the design phase, until the project is constructed and delivered. Every phase of the project needs to apply specific tools and methods to optimize it. Each project is unique and therefore there is not a list of things to do and do not. Depending on the project, the client and the circumstances different tools can be applied.  &lt;br /&gt;
However, Lean is based on a terminology which strives toward an increased efficiency of any area.&lt;br /&gt;
&lt;br /&gt;
===Lean principles===&lt;br /&gt;
&lt;br /&gt;
[[File:Lean principles 2.png|500px|thumb|Figure 1: LEAN Principles, inspiration from https://www.lean.org/whatslean/principles.cfm]]&lt;br /&gt;
&lt;br /&gt;
The lean principles are the core idea and foundation of Lean thinking. It is these 5 principles which can change a work environment and improve the efficiency of it according to Womack and Jones. These principles are with other words the recipe of a healthy and functioning process. Each of the principle covers a specific area of optimization &amp;lt;ref name=&amp;quot;7a&amp;quot; /&amp;gt; .&lt;br /&gt;
  &lt;br /&gt;
&lt;br /&gt;
1.	Define value &lt;br /&gt;
&lt;br /&gt;
Value is a wide concept. In order to understand customer’s needs it is important to have a clear understanding of what value is. A wide range of customers are unconscious of what they actually need or have difficulties in expressing themselves. Value is not only the product or service they are interested in, but also the procedure of it. This can for instance  be preferences in relation to properties, commerce agreements, deliveries etc. By using some suitable techniques, one is able to identify and understand the customer’s needs.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Map the value stream &lt;br /&gt;
&lt;br /&gt;
As the header indicate, this principle encourages the operator to map the customer’s value stream. This require a in depth analysis of the activities that may contribute to the value stream. Conversely there are activities that is considered as waste, since they do not add value to the customers desired product or service. Not all waste activities can be eliminated, since there is activities that are necessary for the main product. Identifying the unwanted activities are beneficial for both parties. By eliminating those activities you are ensuring the customer a product that meets their demand, and at the same time making sure you are not spending time and money on unnecessary processes. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Create flow&lt;br /&gt;
&lt;br /&gt;
Flow means the synergy associated with the production/compiling of the desired product. This step is crucial for the end product. The purpose of this principle is to ensure a smooth flow between the remaining processes and steps in the system. This step is especially needed after eliminating some of the unrewarded activities, mentioned earlier. According to Womack and Jones some of the useable strategies in this step is to reconfigure the production, delegating the workload to more than one unit, invest in the employees, by training them in being multi-skilled and adaptive. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Establish pull&lt;br /&gt;
&lt;br /&gt;
Pull is an effect which aims for attracting the customer. This principle is mostly related to inventory and satisfying the customer. The idea of this principle is to reduce space for inventory and materials used during the process. Establishing pull is achieved by producing the required products in the wanted quantity and delivered when needed. This principle is closely related to Just-in-time and has overall the same purpose. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Pursue perfection&lt;br /&gt;
&lt;br /&gt;
The fifth and last principle strives toward a continuously process of improvement in all the performed actions. This principle is supplementing the first 4 principles, by extending Lean thinking to become a habit and incorporated part of the organization or work environment. By always pursuing perfection, you will pay more attention for waste elements and processes, and thus eliminate those unwanted activities.&lt;br /&gt;
&lt;br /&gt;
===7 wastes===&lt;br /&gt;
&lt;br /&gt;
[[File:Timwood.png|500px|thumb|Figure 2: TIMWOOD, inspiration from https://www.leanscape.io/8-wastes-of-lean/]]&lt;br /&gt;
&lt;br /&gt;
The seven wastes was originally covering the occurrence of wastage in the manufacturing industry. However, parallels are easily drawn regarding waste in the construction industry. These 7 wastes have either a directly or indirectly impact on the environment. The more waste the less sustainable the project is. &lt;br /&gt;
The seven wastes are also called TIMWOOD, where each letter represent a recognized aspect of waste. Each waste is described shortly below:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
1.	Transportation&lt;br /&gt;
&lt;br /&gt;
Transportation is a costly service. The cost is not only related to fuel supply and the drivers fee, but also for the management and environmental expenses. A construction site needs to be supplied with materials and machinery, which make transportation indispensable. However, transportation does not add value to the product itself, therefore it is essential to reduce the costs of it and seek towards a more effective approach. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2.	Inventory&lt;br /&gt;
&lt;br /&gt;
Exceed inventory become a waste when it is unprocessed. This applies also for the objects and processes spent on exceed inventory, such as storage, capital, transportation etc. Therefore, Lean cultivates a production that corresponds to the customers need and down grades mass production. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3.	Motion&lt;br /&gt;
&lt;br /&gt;
Motion is like transportation an unavoidable process within construction industry. However, motions become a wastage when the site is not utilized, and there is a constantly need for moving items back and forwards. This is unfortunately a common problem, where construction workers and craftsmen spent markable amount of time on grabbing items from one place to another on the site.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4.	Waiting&lt;br /&gt;
&lt;br /&gt;
Waiting time can occur due to multiple reasons. Often in the construction site it occurs when one work step finish before another, which then interferes the whole workflow. This is also a very recognized problem, which in many cases leads to a postponement of the time schedule.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5.	Over-Processing&lt;br /&gt;
&lt;br /&gt;
Over-processing is a direct waste of time and energy. It is a very unliked actions, since it doesn’t add value to the processed nor being relevant for the final product. Furthermore, it means that the processor will end up not utilizing his/her time.  &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
6.	Overproduction&lt;br /&gt;
&lt;br /&gt;
Depending on the product, overproduction can be a directly waste. When producing more than wanted, there will end up being capital tied up in unwanted products. The capital covers among other things raw materials, energy, workload, and time.  Besides, being a waste for the producer and customer, it can have a high negative impact on the environment. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7.	Defects&lt;br /&gt;
&lt;br /&gt;
Defects are products that deviates from the standard agreed on. They should be replaced with a product consisting of the right properties and qualities. However, it shouldn’t be forgotten that defects also were processed, and resources were used on producing them. Defects have a impact on the environment since they often get thrown away without being used.&lt;br /&gt;
&lt;br /&gt;
===Just in time===&lt;br /&gt;
&lt;br /&gt;
[[File:Just in time.png|500px|thumb|Figure 3: Procedure of JIT, Own figure]]&lt;br /&gt;
Lean worship the customer. This means that the customer is “pulled” toward the operator through some specific tools and behaviors. One of the tools is called Just-in-time. This tool is especially used within traders or suppliers of specific products.  By using just-in-time application the operator will optimize a couple of aspects. The most important of it, is to meet customer’s needs and secondary to prepare and customize the delivery in the appropriate time. &lt;br /&gt;
&lt;br /&gt;
Furthermore, there are some additional advantages of using just-in-time in the construction site. Many sites struggles with limited spaces due to the narrow work areas. This problem can be solved by agreeing with the subcontractors on using just-in-time deliveries. The materials are meant to be used as soon as they get delivered on site, and not stored for a longer period. This means the need of storage facilities for materials will be reduced significantly.  &lt;br /&gt;
&lt;br /&gt;
However, there may be some external factors that can affect the deliveries. These may be considered when ordering the materials. If the deliveries arrive later than needed, it will cause a loss in the value stream.  Here occurs a reverse effect of Lean, since some of the waste sources such as waiting increase and flow decrease.&lt;br /&gt;
&lt;br /&gt;
==Application==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Implementing Lean===&lt;br /&gt;
&lt;br /&gt;
The formula of how to implement Lean in the construction industry is different whether it is consulting companies or executive construction companies. Although these two parties are dependent on each other’s within the industry and working closely on projects, the activities and processes are very different&amp;lt;ref name=&amp;quot;8a&amp;quot; /&amp;gt;. &lt;br /&gt;
The experience and literature shows there are a larger susceptibility within on-site activities and processes compared to consulting companies.&lt;br /&gt;
 &lt;br /&gt;
There is some strategies to be used when applying Lean to the organization. First, the vision of the organization must be defined if it is not already done. &lt;br /&gt;
Next, it is important to find out what the goals and milestones are for the organization.  Especially the milestones with short-term results should be made and focused on. &lt;br /&gt;
&lt;br /&gt;
Since it is the people who performs the activities it is important to grant employee empowerment &amp;lt;ref name=&amp;quot;1b&amp;quot; /&amp;gt;.  The fostering of Lean thinking within the organization is ideal, to plant the principles and utilization ideology in the minds of the employees. Additionally, is planning a key activity, and has a beneficial effect for any process, whether it is regarding project or human resources. Here it is important to be committed and engaged in the transition phase of the organization where Lean are implemented. &lt;br /&gt;
&lt;br /&gt;
Although some advices and strategies are given, one must not forget that each organization, project, and process is unique and therefore needs a customized and particular Lean approaches and tools.  &lt;br /&gt;
&lt;br /&gt;
As Howell and Ballard emphasized the importance of self-evaluating which methods, tools, and activities to be applied for the current project. “Implementing lean thinking will lead to change in almost every aspect of project and company management. No one step-by-step guide can be offered because change at the mental model level is a developmental process. Each principle driven action will reveal new opportunities hidden because people simply could not think in ways that made the change possible. Thinking causes action, action causes deep learning, and learning causes new thinking.” &lt;br /&gt;
&lt;br /&gt;
An American study tested the usage of Lean in relation to the overall project process, where the result showed a markable reduction of the time, up to 30 %. The implementation that was done in the case study was the following; developments of facilitation of innovation in design and assembly, improvement in site work flow by proper definition of production units, and visualization of process   &lt;br /&gt;
Another successful implementation of Lean in the design phase revealed that the further stages of the project was significantly optimized in terms of project duration and utilization of the available resources.&lt;br /&gt;
&lt;br /&gt;
===Limitations===&lt;br /&gt;
&lt;br /&gt;
Since there is no actual procedure to follow when implementing Lean, it can be considered as a limitation. &lt;br /&gt;
Some of the wastes described earlier may not be recognized in the consultancy companies. They are more applicable by the executer and subcontractors in connection with on-site activities.  The consultant companies needs some other tools and concepts that target how to reduce wastes in the consulting activities and processes. &lt;br /&gt;
&lt;br /&gt;
The same goes for Just-in-time. This is also a tool that wont give any rewarding effect in the consulting companies. In contrast it will give a negative effect if talking about delivering information and tender material. The earlier the information are given to the responsible parties the better and more optimized process.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1a&amp;quot;&amp;gt;Luis Alarcón &#039;&#039;&amp;quot;Lean Construction&amp;quot; Published january 01, 1997. Accessed February 16, 2021.[https://ebookcentral-proquest-com.proxy.findit.dtu.dk/lib/DTUDK/detail.action?docID=259020]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;2a&amp;quot;&amp;gt; Ong, Joy and Sui Pheng, Low &#039;&#039;&amp;quot;Waste Reduction in Precast Construction&amp;quot; chapter 4 Lean Construction Implementation Published 2020. Accessed February 18, 2021.[https://findit.dtu.dk/en/catalog/2612200348]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;3a&amp;quot; &amp;gt;Mark Crawford &#039;&#039;&amp;quot;5 Lean Principles Every Engineer Should Know&amp;quot; Published March 9, 2016. Accessed February 19, 2021.[https://www.asme.org/topics-resources/content/5-lean-principles-every-should-know]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;4a&amp;quot; &amp;gt;Nawras Skhmot &#039;&#039;&amp;quot;What is Lean?&amp;quot; Published August 5, 2017. Accessed February 19, 2021.[https://theleanway.net/what-is-lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;5a&amp;quot;&amp;gt; Banna, Matt &#039;&#039;&amp;quot; A Quick Guide to Lean Construction: Published February 16, 2017. Accessed February 18, 2021.[https://blog.kainexus.com/improvement-disciplines/lean/lean-construction/a-quick-guide-to-lean-construction]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;6a&amp;quot;&amp;gt; Ballard, Glenn and Howell, Gregory &#039;&#039;&amp;quot;  IMPLEMENTING LEANCONSTRUCTION: IMPROVING DOWNSTREAM PERFORMANCE&amp;quot; Published 1994. Accessed February 19, 2021.[https://www.researchgate.net/publication/306120318_Implementing_lean_construction_Improving_downstream_performance]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;7a&amp;quot;&amp;gt; Do, Doanh &#039;&#039;&amp;quot;  The Five Principles of Lean&amp;quot; Published August 5, 2017. Accessed February 16, 2021.[https://theleanway.net/The-Five-Principles-of-Lean]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;8a&amp;quot;&amp;gt; TJ. Womack and D. Jones &#039;&#039;&amp;quot;Lean Thinking: Banish Waste and Create Wealth in Your Corporation&amp;quot; Published 1996.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;ref name=&amp;quot;1b&amp;quot;&amp;gt; R. Coetzee et al. &#039;&#039;&amp;quot;LEAN IMPLEMENTATION STRATEGIES: HOW ARE THE TOYOTA WAY PRINCIPLES ADDRESSED?&amp;quot; puplished November, 2016 &amp;lt;/ref&amp;gt;&lt;/div&gt;</summary>
		<author><name>Roki</name></author>
	</entry>
</feed>