Risk Breakdown Structure (RBS)
CrewMember (Talk | contribs) |
CrewMember (Talk | contribs) |
||
Line 3: | Line 3: | ||
A Risk Breakdown Structure is a tool that depicts in the form of a graph the risks a project might face as it develops. Commonly, this tool's structure follows a hierarchical representation of risk, starting with the top levels and consequently moving down to more specific risks. The scope of this tool is to help project managers map out the possible risk exposure of the project - every parameter that might affect the regular progression of the project. | A Risk Breakdown Structure is a tool that depicts in the form of a graph the risks a project might face as it develops. Commonly, this tool's structure follows a hierarchical representation of risk, starting with the top levels and consequently moving down to more specific risks. The scope of this tool is to help project managers map out the possible risk exposure of the project - every parameter that might affect the regular progression of the project. | ||
Risk Breakdown Structure (RBS) is a tool developed by Dr. David Hillson and he describes it as: "A Source-oriented grouping of project risks that organize and defines the total risk exposure of the project. Each descending level represents an increasingly detailed definition of sources of risk to the project." | Risk Breakdown Structure (RBS) is a tool developed by Dr. David Hillson and he describes it as: "A Source-oriented grouping of project risks that organize and defines the total risk exposure of the project. Each descending level represents an increasingly detailed definition of sources of risk to the project." | ||
+ | |||
+ | ==Introduction== | ||
+ | |||
+ | Project Risk Management (PRM) is a systematic process of identifying, assessing and responding to project risk. The overall goal of the risk management process is to maximize the opportunities and minimize the negative consequences of risk threats. | ||
+ | |||
+ | Many tools can be used to communicate identified risks to project stakeholders such as risk registers, risk matrix and risk map. Among them, the hierarchical description of risks using the Risk Breakdown Structure (RBS) is a very practical tool, which makes risk management easier. It can be used in the risk identification stage and it can provide support in the later stages (risk assessment and risk response) since it offers an overview of the risks which affect the project | ||
Revision as of 15:03, 19 February 2022
Developed by Dimitrios Machairas
A Risk Breakdown Structure is a tool that depicts in the form of a graph the risks a project might face as it develops. Commonly, this tool's structure follows a hierarchical representation of risk, starting with the top levels and consequently moving down to more specific risks. The scope of this tool is to help project managers map out the possible risk exposure of the project - every parameter that might affect the regular progression of the project. Risk Breakdown Structure (RBS) is a tool developed by Dr. David Hillson and he describes it as: "A Source-oriented grouping of project risks that organize and defines the total risk exposure of the project. Each descending level represents an increasingly detailed definition of sources of risk to the project."
Contents |
Introduction
Project Risk Management (PRM) is a systematic process of identifying, assessing and responding to project risk. The overall goal of the risk management process is to maximize the opportunities and minimize the negative consequences of risk threats.
Many tools can be used to communicate identified risks to project stakeholders such as risk registers, risk matrix and risk map. Among them, the hierarchical description of risks using the Risk Breakdown Structure (RBS) is a very practical tool, which makes risk management easier. It can be used in the risk identification stage and it can provide support in the later stages (risk assessment and risk response) since it offers an overview of the risks which affect the project
Relation with Work Breakdown Structure (WBS)
Risk Breakdown Structure Template Example
How to Use the RBS
Risk identification aid
Risk assessment
Risk reporting
Introduction to IT project management By Cynthia Snyder, Frank Parth
References
Hillson, David. (2003). Using a Risk Breakdown Structure in project management. Journal of Facilities Management. 2. 85-97. 10.1108/14725960410808131.
Munier, Nolberto. (2014). Risk management for engineering projects: Procedures, methods and tools. 10.1007/978-3-319-05251-9.