The Technique of Value Engineering (VE) in Architecture
Line 12: | Line 12: | ||
The idea was born at General Electric Co in the 1940s by the engineers Lawrence Miles, Jerry Leftow, and Harry Erlicher. The combination of the high demand of products with the shortage of raw materials, created the need for seeking alternative materials which will be in the same cost and function levels with the first ones. This process was named Value Engineering. Nowadays, Value Engineering is consisted by a multi-disciplined team which purpose is to identify and reduce unnecessary costs and poor performance, while maintaining product quality. Functional Analysis System Technique (FAST) diagrams illustrate the phases. The value engineering team has four to six members with complementary expertise in different disciplines.<ref>Sievert, R. W. (1991). A review of value engineering as an effective system for planning building projects. Project Management Journal, 22(1), 31–38.</ref> | The idea was born at General Electric Co in the 1940s by the engineers Lawrence Miles, Jerry Leftow, and Harry Erlicher. The combination of the high demand of products with the shortage of raw materials, created the need for seeking alternative materials which will be in the same cost and function levels with the first ones. This process was named Value Engineering. Nowadays, Value Engineering is consisted by a multi-disciplined team which purpose is to identify and reduce unnecessary costs and poor performance, while maintaining product quality. Functional Analysis System Technique (FAST) diagrams illustrate the phases. The value engineering team has four to six members with complementary expertise in different disciplines.<ref>Sievert, R. W. (1991). A review of value engineering as an effective system for planning building projects. Project Management Journal, 22(1), 31–38.</ref> | ||
− | This tool can be applied at any step in a project, from the pre-workshop preparation to the post-workshop implementation.<ref>SAVE International Value Standard, ''VALUE METHODOLOGY STANDARD'', (SAVE International Value Standard, 2015)</ref> The Society of American Value Engineers (SAVE) was formed in 1959 as a professional society dedicated to the advancement of VE through a better understanding of the principles, methods, and concepts involved. <ref>https://www.wbdg.org/resources/value-engineering</ref> According to the Value Methodology Standard from the SAVE, | + | This tool can be applied at any step in a project, from the pre-workshop preparation to the post-workshop implementation.<ref>SAVE International Value Standard, ''VALUE METHODOLOGY STANDARD'', (SAVE International Value Standard, 2015)</ref> The Society of American Value Engineers (SAVE) was formed in 1959 as a professional society dedicated to the advancement of VE through a better understanding of the principles, methods, and concepts involved. <ref>https://www.wbdg.org/resources/value-engineering</ref> According to the Value Methodology Standard from the SAVE and the American Society for Testing and Materials (ASTM) standard E1699-14, Value Engineering can be described by the following 8-phases: |
# Preparation Phase | # Preparation Phase |
Revision as of 19:51, 4 March 2022
Developed by Aikaterini Deli
Value Engineering (VE) is a sequence of procedures aiming to meliorate the value of the final product by having a better management through the overall steps, always considering the cost. Value Engineering is an organizing tool with origins from the science of Project Management which had been used during the World War II by “General Electric Co” and nowadays it is an approach commonly used for planning building projects.
Most of the companies follow this technique in order to minimize the cost but not the basic function of the product. In the architectural field, the engineers are facing plenty of composite projects which have to meet the needs and requirements of their clients and also being in time and in budget. For this reason, the VE technique is preferable from large architectural offices because of the status of their clients. The bigger the project, the greater the need for examining continuously the budget through the design process.
In a nutshell, Value Engineering is an organized creative review of the needs and requirements of the client which are satisfied through the functions of the product, always underlining its quality and its low life cycle cost.
This article will deliver an analysis of this management tool and will focus on the different stages that the team has to pass throught, the benefits on applying this technique and also its limitations.
Contents |
Big Idea
The idea was born at General Electric Co in the 1940s by the engineers Lawrence Miles, Jerry Leftow, and Harry Erlicher. The combination of the high demand of products with the shortage of raw materials, created the need for seeking alternative materials which will be in the same cost and function levels with the first ones. This process was named Value Engineering. Nowadays, Value Engineering is consisted by a multi-disciplined team which purpose is to identify and reduce unnecessary costs and poor performance, while maintaining product quality. Functional Analysis System Technique (FAST) diagrams illustrate the phases. The value engineering team has four to six members with complementary expertise in different disciplines.[1]
This tool can be applied at any step in a project, from the pre-workshop preparation to the post-workshop implementation.[2] The Society of American Value Engineers (SAVE) was formed in 1959 as a professional society dedicated to the advancement of VE through a better understanding of the principles, methods, and concepts involved. [3] According to the Value Methodology Standard from the SAVE and the American Society for Testing and Materials (ASTM) standard E1699-14, Value Engineering can be described by the following 8-phases:
- Preparation Phase
- Information Phase
- Function Analysis Phase
- Creative Phase
- Evaluation Phase
- Development Phase
- Presentation Phase
- Implementation Phase
Application
The tool is supposed to be used by following the below phases.
Preparation Phase
- understanding the project, first touch
In this step it is important for the value engineering team to be familiar with the project, which means that the team has to understand the need and the specifications that the customer demands and wants for the final product, especially what is to be studied and when.
Information Phase
- gathering of data
In this phase, the team has to research and investigate deeper about the project. Some parts have to be clear now, like the functions of each element and the design procedure. The deeper the research, the better the outcome and the understanding and the more comfortable the team is. The investigation could be in the fileds of "Engineering", "Materials", "Costs", "Manufacturing" and "Scheduling". Some really good and helpful questions are the following:
# How # What # Why # Where # When
Function Analysis Phase
- analysis of the project, clarification of the purpose
In this step, the team defines the served by the building functions, some of the them are primary and the remaining secondary. The difference between them is that the first one reveals absolutely the purpose of the building while the second one describes an added value in this.
The Verb - Noun Approach
The Verb - Noun Approach is well known between the value engineering team, as they set the questions "What this function does?" and "What is this fuction?", which are aswered by a verb and noun respectively. Some advantages about this technique can be summarized like these:
# The success of this approach makes clear that the team has understood the function and it is capable to describe it in two words. # With this technique, it is way easier to not be confused. This is a common phenomenon as the functions are plenty and it is not easy to seperate the different meanings of each. [4]
Creative Phase
- production of ideas which correspond the needs
Here, the team generates the ideas which are corresponding better to the functions. It is a brainstorming productive and why not innovative idea.
Evaluation Phase
- ranking the ideas
In this phase, the team considers about the advantages and disadvantages of each idea of the previous step. It is important the team members to be objective as a non-critical view may lead to wrong outcome in the end. The team performs a weighted matrix analysis to group and rank the alternatives, and the best alternatives are selected for consideration in the next phase. [5]
Development Phase
- review and selection of the most suitable ideas
An in-depth analysis follows the Evaluation Phase. The team now creates a profile for every alternative which has been selected previously in order to inform the client about the idea. The profile may consists of sketches, diagrams, 3D models, cost estimation and cost savings of the building.
Presentation Phase
- presentation to the clients
The value engineering team meets the stakeholders. The Evaluation and Development Phases are now represented to the customers through reports, flow charts in a high level of detail in order to convince them about the outcome and the positive impact of their generated ideas.
Implementation Phase
- realization of the selected by the client’s ideas
This step exists from the moment in which the stakeholders have been convinced and agreed with the previous presentations. Any changes should be incorporated into the implementation plan before the implementation begins. [6]
Limitations
As everywhere, in this technique is easy to detect the limitations, which are man-made [7]. Some of these are the following:
- Difficulties in the communication inside the multidisciplinary team
- Lack of motivation
- Lack of knowledge
- Persistence from stakeholders for even less cost
References
- ↑ Sievert, R. W. (1991). A review of value engineering as an effective system for planning building projects. Project Management Journal, 22(1), 31–38.
- ↑ SAVE International Value Standard, VALUE METHODOLOGY STANDARD, (SAVE International Value Standard, 2015)
- ↑ https://www.wbdg.org/resources/value-engineering
- ↑ Akoud, H. (1998). Value Engineering for the Practice of Architecture, Diploma Thesis, Faculty of New Jersey Institute of Technology, School of Architecture,
- ↑ https://corporatefinanceinstitute.com/resources/knowledge/strategy/value-engineering
- ↑ https://corporatefinanceinstitute.com/resources/knowledge/strategy/value-engineering
- ↑ https://www.yourarticlelibrary.com/marketing/value-analysis-meaning-phases-merits-and-limitations/49178