(WBS) - Work Breakdown Structure

From apppm
(Difference between revisions)
Jump to: navigation, search
(Diffrent Type-structures)
Line 19: Line 19:
 
== Diffrent Type-structures ==
 
== Diffrent Type-structures ==
  
*Deliverable-Based WBS
+
=== Deliverable-Based WBS ===
*Phase-Based WBS
+
=== Phase-Based WBS ===
*System/Subsystem
+
=== System/Subsystem ===
*Mixed or Hybrid
+
=== Mixed or Hybrid ===
 
+
==
+
 
+
  
 
== Benefits of WBS ==
 
== Benefits of WBS ==

Revision as of 23:25, 19 February 2023

The WBS (work breakdown structure) is a process used in project management to identify the scope of a project and all the associated tasks that must be done to complete the project as defined. For this purpose, a results-oriented hierarchical decomposition of the work is carried out. This technology not only makes the work more accessible and manageable. It also enables the monitoring of different processes of a project, the estimation of costs and schedules and helps with team building. This led to WBS becoming one of the most important project management tools.

In the following, the author presents the different structuring techniques of a work breakdown structure. Furthermore, he describes the process of creating a work breakdown structure, the different forms of presentation as well as the advantages and limitations of a work breakdown structure and will illustrate these with examples.

Contents

Backgroud

  • U.S Department of Defense 1960´s
  • Developed by Nasa

Fundamentals of the WBS

  • Packages
  • Control accounts
  • Levels
  • WBS Dictionary
  • 100% Rule

Diffrent Type-structures

Deliverable-Based WBS

Phase-Based WBS

System/Subsystem

Mixed or Hybrid

Benefits of WBS

  • Detailed illustration of scope
  • Monitor progress
  • Cost and schedule estimates
  • Build project teams