Talk:Risk Profile in General Contracting

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 13: Line 13:
  
  
== '''Reviewer 1, 150477''' ==
+
== '''Reviewer 3, 150477''' ==
  
  
 
The article has been accessed the 22/09/2015 at 21 p.m.
 
The article has been accessed the 22/09/2015 at 21 p.m.
  
'''* Overall overview.'''
+
* The abstract sounds interesting and your parts constructed in a logical way.
 +
* The last part has been written twice, be careful!
 +
* Relevant topic with Risks in Construction.
 +
* Impatient to read your article (i am civil engineering student ;-)
 +
* Difficult actually to evaluate your article properly.

Revision as of 21:04, 22 September 2015

KB1991, reviewer 2:

  • What there is written so far is good.
  • Good introduction that describes the topic briefly, but the last part has been written twice.
  • The structure looks fine both regards to the formatting and the red threat.
  • Would have been nice to read more of the article ☺


s150905, Review 2:

The idea behind this article seem really interesting, but most of the article itself is missing

  • The sketched structure appears to be just a draft of the final one, and if the one I see now is the final one I think is not satisfactory for a good work
  • The lack of text and imagines make impossible to me to do some actual consideration about the work


Reviewer 3, 150477

The article has been accessed the 22/09/2015 at 21 p.m.

  • The abstract sounds interesting and your parts constructed in a logical way.
  • The last part has been written twice, be careful!
  • Relevant topic with Risks in Construction.
  • Impatient to read your article (i am civil engineering student ;-)
  • Difficult actually to evaluate your article properly.
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox