Talk:Managing Uncertainty and Risk on the Project

From apppm
(Difference between revisions)
Jump to: navigation, search
 
(9 intermediate revisions by 4 users not shown)
Line 1: Line 1:
Review1, Buurbuur:
+
tool that can be applied for managing uncertainty and risk in a project. Remember that your article has to fit one of the two article types and the required structure -)
- I found the topic very interesting and very relevant for this course.
+
- Good that many point are illustrated with an appropriate figure.
+
- However I find the scope very broad, maybe choose only to focus on project or portofolio management.
+
- In the ''definition'' section i find it difficult to understand and navigate between all the different definitions, maybe it could make it more easy and understandable if you make a grid to show the difference. Or list them up on bulletspoints
+
- Secure that the article fit to one of the two article types i relation to the required topics
+
- However I find the figures clear and understandable
+
- Good that there are references on every figure
+
  
 +
Review1, Buurbuur:
 +
* I found the topic very interesting and very relevant for this course.
 +
* Good that many point are illustrated with an appropriate figure.
 +
* However i think you scope maybe is too big, maybe just focus on managing uncertainty and risk in either project or portfolio
 +
* In the ''definition'' section i find it difficult to understand and navigate between all the different definitions, maybe it could make it more easy and understandable if you make a grid to show the difference. Or list them up on bulletspoints
 +
* Secure that the article fit to one of the two article types i relation to the required topics
 +
* Write the full wording before abbreviation in this case i refer to the use of FMEA
 +
* However I find the figures clear and understandable
 +
* Good that there are references on every figure
  
 +
'''Author feedback: I have changed to scope, so that I have a clearer scope on project management and excluded the portfolio part. I deleted a part of the definition section, so that it made more sense. Also I changed the "body" of the article to fit it to Article type 1. I made the full name before the acronym and made it as hyperlink. 
 +
'''
  
Anna: It is an interesting and very relevant topic, however, I would suggest that you try to narrow down the scope and focus your article on one method/tool that can be applied for managing uncertainty and risk in a project. Remember that your article has to fit one of the two article types and the required structure :)
+
Reviewer 2:Andkamp
 +
*Great use of English and nice sentences structure
 +
*Great subject but, very broad, needs to be narrowed a little bit
 +
*Nice figures, but the matrix with the papers is something I expected to be illustrated in matrix and not a Figure, in order to maintain the wiki style of the article.
 +
*Nice Referencing of the figures, although it hadn't any inter-wiki links or in text links.
 +
*The interest of a practitioner could be greater if there was more focusing in aspects of this subject.
 +
*Profound relation with project management
 +
*The good structure assures logical flow
 +
*Extremely poor reference material for such extended article, that could lead someone with bad intensions to think that there's some amount of plagiarism
 +
*Expected to see pros/cons
 +
*Implementations would narrow the whole subject and make it more interesting
 +
Generally speaking a more wiki style text, with hyperlinks,more bibliography and see also section would be more appropriate to this great text.
 +
 
 +
'''Author feedback: I tried to narrow the article so that I have focus on project management and the tool. I deleted that part with the comparing the different definitions. I have made the relevant inter-wiki links that fitted in this article. I have answered how to use the the tool. I have used more references, so the credibility is higher. Limitations and strengths has been added as well. '''
 +
 
 +
== Reviewer 3 - s141938 ==
 +
 
 +
+
 +
 
 +
* abstract at the beginning
 +
* captions and figure numbering
 +
* gramatically correct. easy and pleasant to read
 +
* nice references to the graphs - everything is explained nicely
 +
 
 +
-
 +
* separate consequences in the definitions into paragraphs
 +
* "In the beginning of the a project the uncertainty is very high and depending on the size of the project and to decrease the mission uncertainty it can some extend be used” - I think you're missing something at some point
 +
* really broad - maybe give some methods that are used to minimize risk and uncertainty cause this would stick more with the method type of article
 +
* Advantages and limitations ? (required in the method type article)
 +
* Add more references for higher credibility ;)
 +
* maybe restructure the definition section, to make the article easier to scan quickly
 +
 
 +
Conclusion: Great article and properly written, but needs to be restructured a bit for quicker scanning of the article and to fit the method article type.
 +
 
 +
'''Author feedback: I deleted a part of the definition section so that it made more sense. I scoped the article so that I focused on project management part only. I added limitation/strengths part. I also added more references (I was just not finished with the article at that point) :) I fitted the article to the type 1 article, so that I have the right structure.'''

Latest revision as of 15:08, 29 September 2015

tool that can be applied for managing uncertainty and risk in a project. Remember that your article has to fit one of the two article types and the required structure -)

Review1, Buurbuur: 
  • I found the topic very interesting and very relevant for this course.
  • Good that many point are illustrated with an appropriate figure.
  • However i think you scope maybe is too big, maybe just focus on managing uncertainty and risk in either project or portfolio
  • In the definition section i find it difficult to understand and navigate between all the different definitions, maybe it could make it more easy and understandable if you make a grid to show the difference. Or list them up on bulletspoints
  • Secure that the article fit to one of the two article types i relation to the required topics
  • Write the full wording before abbreviation in this case i refer to the use of FMEA
  • However I find the figures clear and understandable
  • Good that there are references on every figure

Author feedback: I have changed to scope, so that I have a clearer scope on project management and excluded the portfolio part. I deleted a part of the definition section, so that it made more sense. Also I changed the "body" of the article to fit it to Article type 1. I made the full name before the acronym and made it as hyperlink.

Reviewer 2:Andkamp

  • Great use of English and nice sentences structure
  • Great subject but, very broad, needs to be narrowed a little bit
  • Nice figures, but the matrix with the papers is something I expected to be illustrated in matrix and not a Figure, in order to maintain the wiki style of the article.
  • Nice Referencing of the figures, although it hadn't any inter-wiki links or in text links.
  • The interest of a practitioner could be greater if there was more focusing in aspects of this subject.
  • Profound relation with project management
  • The good structure assures logical flow
  • Extremely poor reference material for such extended article, that could lead someone with bad intensions to think that there's some amount of plagiarism
  • Expected to see pros/cons
  • Implementations would narrow the whole subject and make it more interesting

Generally speaking a more wiki style text, with hyperlinks,more bibliography and see also section would be more appropriate to this great text.

Author feedback: I tried to narrow the article so that I have focus on project management and the tool. I deleted that part with the comparing the different definitions. I have made the relevant inter-wiki links that fitted in this article. I have answered how to use the the tool. I have used more references, so the credibility is higher. Limitations and strengths has been added as well.

[edit] Reviewer 3 - s141938

+

  • abstract at the beginning
  • captions and figure numbering
  • gramatically correct. easy and pleasant to read
  • nice references to the graphs - everything is explained nicely

-

  • separate consequences in the definitions into paragraphs
  • "In the beginning of the a project the uncertainty is very high and depending on the size of the project and to decrease the mission uncertainty it can some extend be used” - I think you're missing something at some point
  • really broad - maybe give some methods that are used to minimize risk and uncertainty cause this would stick more with the method type of article
  • Advantages and limitations ? (required in the method type article)
  • Add more references for higher credibility ;)
  • maybe restructure the definition section, to make the article easier to scan quickly

Conclusion: Great article and properly written, but needs to be restructured a bit for quicker scanning of the article and to fit the method article type.

Author feedback: I deleted a part of the definition section so that it made more sense. I scoped the article so that I focused on project management part only. I added limitation/strengths part. I also added more references (I was just not finished with the article at that point) :) I fitted the article to the type 1 article, so that I have the right structure.

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox