Programming a project with the CPM

From apppm
(Difference between revisions)
Jump to: navigation, search
(Abstract)
(Abstract)
Line 2: Line 2:
 
==Abstract==
 
==Abstract==
 
The Critical Path Method (CPM) was developed in late 1950s and became a very popular tool for Schedule Development. The method, which is broadly used by project managers, is a graphical technique which is known with the generic term Network Modeling.  
 
The Critical Path Method (CPM) was developed in late 1950s and became a very popular tool for Schedule Development. The method, which is broadly used by project managers, is a graphical technique which is known with the generic term Network Modeling.  
[[Wikipedia:Critical Path Method|Critical Path Method]] (CPM) is one of the basic deterministic methods of the network analysis and allows to coordinate effectively the individual and mutually consecutive activities within the project.For both commercial and governmental organizations, the ability to manage projects effectively is a major contributor to an organization’s overall performance.Almost all project planning and scheduling tools on the market today use some type of PERT and/or CPM methodology as their primary underlying methodology. These two approaches are synonymous and are often interchanged or even collectively called PERT/CPM<ref name=''kostas''> ''https://www.pmi.org/learning/library/going-beyond-critical-path-method-6297 /  Project Management Institute '' </ref>. This article describes the methodology and provides an example of this technique.
+
The [[Wikipedia:Critical Path Method|Critical Path Method]] (CPM) is one of the basic deterministic methods of the network analysis and allows to coordinate effectively the individual and mutually consecutive activities within the project.For both commercial and governmental organizations, the ability to manage projects effectively is a major contributor to an organization’s overall performance.Almost all project planning and scheduling tools on the market today use some type of PERT and/or CPM methodology as their primary underlying methodology. These two approaches are synonymous and are often interchanged or even collectively called PERT/CPM<ref name=''kostas''> ''https://www.pmi.org/learning/library/going-beyond-critical-path-method-6297 /  Project Management Institute '' </ref>. This article describes the methodology and provides an example of this technique.
  
 
==References==
 
==References==
 
<references />
 
<references />

Revision as of 17:02, 9 February 2018

Abstract

The Critical Path Method (CPM) was developed in late 1950s and became a very popular tool for Schedule Development. The method, which is broadly used by project managers, is a graphical technique which is known with the generic term Network Modeling. The Critical Path Method (CPM) is one of the basic deterministic methods of the network analysis and allows to coordinate effectively the individual and mutually consecutive activities within the project.For both commercial and governmental organizations, the ability to manage projects effectively is a major contributor to an organization’s overall performance.Almost all project planning and scheduling tools on the market today use some type of PERT and/or CPM methodology as their primary underlying methodology. These two approaches are synonymous and are often interchanged or even collectively called PERT/CPM[1]. This article describes the methodology and provides an example of this technique.

References

  1. https://www.pmi.org/learning/library/going-beyond-critical-path-method-6297 / Project Management Institute
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox