Resource allocation and crashing
From apppm
(Difference between revisions)
Line 11: | Line 11: | ||
= Crashing a project = | = Crashing a project = | ||
== Cost-time trade off == | == Cost-time trade off == | ||
+ | == Advantages and disadvantages == | ||
= Conclusion = | = Conclusion = | ||
= Annotated bibliography = | = Annotated bibliography = |
Revision as of 13:10, 17 February 2019
Contents
Contents |
Introduction
Common to all projects is the need to allocate available resources in the best possible manner. If done correctly by the project manager, she can avoid delays, penalty fees and using unnecessarily many resources on wrong events. In addition, by analyzing the possibility of crashing the project, the project manager might be able to find a more optimal solution than would be possible by the simple PERT/CPM analysis. Thus this analysis is building upon a PERT/CPM analysis.