Resource allocation and crashing

From apppm
(Difference between revisions)
Jump to: navigation, search
(Abstract)
Line 3: Line 3:
 
= Abstract =
 
= Abstract =
 
Common to all projects is the need to allocate available resources in the best possible manner.  
 
Common to all projects is the need to allocate available resources in the best possible manner.  
If done correctly by the project manager, she can avoid delays, penalty fees and using unnecessarily many resources on wrong events.
+
If done correctly by the project manager, she can optimize the way the project uses it resources, minimize the negative effect of unforeseen events. However, if done casually, this might result in delays, penalty fees, using unnecessarily many resources on wrong events and not on critical events. These are the main points that the project manager will learn to optimize from this article.  
 
In addition, by analyzing the possibility of crashing the project, the project manager might be able to find a more optimal solution than would be possible by the simple PERT/CPM analysis, this analysis thus builds upon a PERT/CPM analysis. This article aims at giving the reader a greater understanding of how to allocate resources to a project as well as presenting an example of how a project could be crashed.
 
In addition, by analyzing the possibility of crashing the project, the project manager might be able to find a more optimal solution than would be possible by the simple PERT/CPM analysis, this analysis thus builds upon a PERT/CPM analysis. This article aims at giving the reader a greater understanding of how to allocate resources to a project as well as presenting an example of how a project could be crashed.
Three different techniques will be presented and explained in depth. Furthermore, in order to give the reader a greater understanding of how resource allocation can effect a project, an example using CPM crash heuristics will be presented.  
+
Three different techniques to resource allocation will be presented and explained in depth. Furthermore, in order to give the reader a greater understanding of how resource allocation can effect a project, positively as well as negatively, two examples using CPM crash heuristics will be presented.
  
 
= Resource allocation =
 
= Resource allocation =

Revision as of 19:01, 18 February 2019

Created by Jesper Antonius Wolters

Contents

Abstract

Common to all projects is the need to allocate available resources in the best possible manner. If done correctly by the project manager, she can optimize the way the project uses it resources, minimize the negative effect of unforeseen events. However, if done casually, this might result in delays, penalty fees, using unnecessarily many resources on wrong events and not on critical events. These are the main points that the project manager will learn to optimize from this article. In addition, by analyzing the possibility of crashing the project, the project manager might be able to find a more optimal solution than would be possible by the simple PERT/CPM analysis, this analysis thus builds upon a PERT/CPM analysis. This article aims at giving the reader a greater understanding of how to allocate resources to a project as well as presenting an example of how a project could be crashed. Three different techniques to resource allocation will be presented and explained in depth. Furthermore, in order to give the reader a greater understanding of how resource allocation can effect a project, positively as well as negatively, two examples using CPM crash heuristics will be presented.

Resource allocation

Resource loading

Resource leveling using ALAP heuristics

Resource scheduling

Crashing a project

Cost-time trade off

Advantages and disadvantages

Conclusion

Annotated bibliography

Fast tracked project Calculate

References

[1] [2] [3]

  1. Meredith, Jack and Mantel, Samuel (2009) "Project management a managerial approach 7th Edition
  2. https://link-springer-com.proxy.findit.dtu.dk/content/pdf/10.1007%2F3-540-27852-4.pdf
  3. dr. ir. Broekmeulen. Rob "Slides from Project Management"
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox