Gantt chart and Scheduling techniques
From DTU ProjectLab
(Difference between revisions)
| Line 6: | Line 6: | ||
A plan can only show the practicability of accomplishing its objectives when the actions and activities in the plan, are put together in a schedule that illustrates when each action or activity will be carried out. | A plan can only show the practicability of accomplishing its objectives when the actions and activities in the plan, are put together in a schedule that illustrates when each action or activity will be carried out. | ||
| − | Today there is many different methods and approaches to scheduling. It can either be by computer-based planning tools or done manually. | + | Today there is many different methods and approaches to scheduling. It can either be by computer-based planning tools or done manually <ref>E. Miller, ''The Sun'', (New York: Academic Press, 2005), 23-5.</ref>. |
===Gantt chart=== | ===Gantt chart=== | ||
| Line 19: | Line 19: | ||
==The connection== | ==The connection== | ||
| + | |||
| + | ==References== | ||
| + | <references /> | ||
Revision as of 16:03, 19 February 2019
Contents |
Abstract
Here you will write your draft for your wiki article, including at least 1 reference.
Scheduling
A plan can only show the practicability of accomplishing its objectives when the actions and activities in the plan, are put together in a schedule that illustrates when each action or activity will be carried out.
Today there is many different methods and approaches to scheduling. It can either be by computer-based planning tools or done manually [1].
Gantt chart
| Checklist when creating a Gantt chart | |||||
|---|---|---|---|---|---|
| 1. 2. | |||||
Constructing a Network Diagram
The connection