Gantt chart and Scheduling techniques

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 26: Line 26:
 
|}
 
|}
  
{{#ev:youtube|https://youtu.be/Cv6C2GH53aE}}
+
{{#ev:youtube|https://youtu.be/Cv6C2GH53aE|1000|right|Let eet GO|frame}}
  
  

Revision as of 11:49, 20 February 2019

Contents

Abstract

The scheduling techniques that are going to be explained in this article are Gantt and CPM - hereby Network Diagram - have they works - have to use them in practice - have they are connected and supplement each other

Scheduling

A plan can only show the practicability of accomplishing its objectives when the actions and activities in the plan, are put together in a schedule that illustrates when each action or activity will be carried out.

Today there is many different methods and approaches to scheduling. It can either be by computer-based planning tools or done manually [1].


Tools like Gantt chart and Critical Path Method (CPM) are tools often used in the planning process of a project.


Gantt chart

Definition

“A graphic display of schedule-related information. In the typical bar chart, schedule activities or work breakdown structure components are listed down the left side of the chart, dates are shown across the top, and activity durations are shown as date-placed horizontal bars.” [2]

How to create a Gantt chart?

Step by step to construct a Gantt chart
Step 1
Step 2
Step 3


Let eet GO


Critical path method (CPM)

"A schedule network analysis technique used to determine the amount of scheduling flexibility (the amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish dates are calculated by means of a forward pass, using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.” [3]

caption

Constructing a Network Diagram

Checklist when creating a Network Diagram
1.
2.
caption

The connection

References

  1. Managing Successful Projects with PRINCE2. (2017). Managing Successful Projects With Prince2. The Stationery Office Ltd.
  2. Guide, A., 2001. Project management body of knowledge (pmbok® guide). In Project Management Institute. (p. 436)
  3. Guide, A., 2001. Project management body of knowledge (pmbok® guide). In Project Management Institute. (p. 431)
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox