Talk:Process Planning and Cost Estimation
From DTU ProjectLab
(Difference between revisions)
(Created page with "==Feedback on Abstract:== Cannot give feedback as the abstract is incomplete (19-Feb-2019).") |
SandroPina (Talk | contribs) |
||
| Line 2: | Line 2: | ||
Cannot give feedback as the abstract is incomplete (19-Feb-2019). | Cannot give feedback as the abstract is incomplete (19-Feb-2019). | ||
| + | ==Feedback 1 | Reviewer name: ''Sandro Pina''== | ||
| + | |||
| + | |||
| + | Cannot give feedback as there is nothing written. | ||
Revision as of 22:09, 24 February 2019
Feedback on Abstract:
Cannot give feedback as the abstract is incomplete (19-Feb-2019).
Feedback 1 | Reviewer name: Sandro Pina
Cannot give feedback as there is nothing written.