Variation Orders in Construction Projects
From DTU ProjectLab
(Difference between revisions)
| Line 6: | Line 6: | ||
Due to their nature, changes are vital for the construction projects. | Due to their nature, changes are vital for the construction projects. | ||
| + | |||
| + | == Level 2 == | ||
Revision as of 20:40, 11 February 2021
Abstract
Construction projects are long term projects with multiple parties involved and work coherently in a designated area within a specified time to construct a structure. During this process, the project
However, for the most cases
Due to their nature, changes are vital for the construction projects.