The FMEA method in project risk management
(→FMEA in project life cycle) |
(→Headline text) |
||
Line 10: | Line 10: | ||
== FMEA in project life cycle | == FMEA in project life cycle | ||
− | == | + | == FMEA in project life cycle == |
− | == | + | |
== Model description == | == Model description == |
Revision as of 18:24, 19 September 2015
Every project faces uncertainties all along its life cycle. Dealing with risks is then a fundamental aspect for a successful project management: uncertainties can affect the possible outcomes and project effectiveness The risk management's objective is to assure uncertainty does not affect the project goals. This article aims to show how
The concept of loop of control in risk management is a comprehensive model consisting of applicable methods, implying a dynamic and countinous model. The loop of control is built upon 4 phases: individuation, assessment, controlling and monitoring.
== FMEA in project life cycle
Contents |
FMEA in project life cycle
Model description
FMEA is an analytical methodology used to ensure that potential problems have been condìsidered and adressed throughout the product development cycle. - qualitative risk analysis