''Developed by Raphaël Lassaux''
  
'''Coordination of Remote Project: a cluster approach'''
 
  
Aid workers are subject to multiple attacks. Acting in insecure area could mean for the NGO (Non-Governmental Organization) huge expenses in security management. Thereby more of them prefer use remote management to secure their international staff in a secure place. However, the remote control or remote management can lead to risk transfer to local team, wrong accountability or monitoring. Generally, whole those consequences are due to a bad planning and remote control was implemented in emergency situation. However, if it’s implemented and correctly planned in the early stage of the project it could really help the NGO to still provide aid to highly insecure area.
+
'''Coordination of Remote Project: a Cluster Approach'''
  
Moreover, all the lessons learned from the aid remote project can be adapted to general companies. The cluster approach could be one of the method to introduce a more predictable and accountable means for coordination by formalising the lead role to some specific organisation. Cluster management cycle is important to understand and implement in order to achieve the common aim. Indeed, with our virtual and globalized world companies tend to have more geographically dispersed teams. Moreover, some companies are working with university in knowledge clusters. Those teams face some of the same problems of the local aid workers. Some recommendations will be described in order to learn from the lessons of the NGO who have faced similar problems.
+
The United Nations (UN) try to be present all over the world and try to response quickly in case of an emergency. However, local aid workers are subject to multiple attacks. Acting in insecure areas could mean for the NGOs (Non-Governmental Organization) huge expenses in security management. Thereby more of them prefer to use remote management to secure their international staff in a secure place. However, the remote control or remote management can lead to risk transfer to local teams, wrong accountability or monitoring. Generally, those effects are due to a bad planning. In addition, remote control is implemented in emergency situation. Though, if it’s executed and correctly planned in the early stages of the project it could really help the NGOs to still provide aid to highly insecure areas.
 +
 
 +
To avoid a lack of coordination they have implemented some years ago a cluster approach (figure 1 shows the UN clusters). The system is composed by a team leader who will coordinate the actions and sectoral teams for each activity. Some notable benefits have been demonstrated through the years as better coordination, less gap and a better information sharing between the members. The theory behind this cluster approach is based on a cluster management cycle used also in knowledge cluster (academic and companies). This perpetual cycle is composed by six stages: Define, Design, Implement, Monitor, Evaluate and Revise. It gives a framework and recommendations to correctly implement the cluster approach on remote project for example. It highlights the fact that this approach and remote project should be think early before the project otherwise the benefits and objectives could not be reached. Finally, clusters are a new way to work together. It promotes innovation and is a unit with its own agenda inside a company.
 +
 
 +
As it will be explained in this article, the lessons and challenges from the emergency response could be transposed to companies doing remote project. There are multiples difficulties to implement this kind of project as the difference in time zones, languages, and technologies. Moreover, there should be a mutual trust to accomplish the specified task between the members.
 +
 
 +
In brief, this article starts from the case of emergency situations and NGOs, shows an approach to correct certain difficulties in the collaboration process, to finally expose the cluster management cycle theory and the definition of cluster team working.
 +
 +
[[File: clusterUN.png|rigth|thumb|600px|Figure 1: How the United Nation cluster works? <ref>United Nations Office for humanitarian affairs, http://www.unocha.org/sites/default/files/OCHA_Category/What%20We%20Do/cluster-leads.png </ref>]]
  
  
Line 11: Line 19:
 
= Remote Project Management =
 
= Remote Project Management =
  
Remote project management or remote control is defined as ''reducing or restricting movement or withdrawing internationals (or any other staff at particular risk) while shifting responsibilities for programme delivery to local staff or local partners.'' <ref name = once>[ Once Removed, Stoddard, Lessons and Challenges in remote management of humanitarian operations for insecure area]</ref>. It was first adopted in the conflict in early 1980s. However, only few documents explained the good practice of this kind of management and how to succeed. ‘Remote control’, ‘remote support’ and ‘remote partnership’ and ‘limited access programming’ are different concept for remote management that it could be find in the literature <ref>[Hansen, 2008; Stoddard, Harmer & Renouf, 2010]</ref>
+
Remote project management or remote control is defined as ''reducing or restricting movement or withdrawing internationals (or any other staff at particular risk) while shifting responsibilities for program delivery to local staff or local partners.'' <ref name = once> Once Removed, Stoddard, Lessons and Challenges in remote management of humanitarian operations for insecure area</ref>. It was first adopted in conflicts in early 1980s. However, only few documents explained the good practice of this kind of management and how to succeed. ‘Remote control’, ‘remote support’, ‘remote partnership’ and ‘limited access programming’ are different concepts for remote management that could be found in the literature <ref>Hansen, 2008; Stoddard, Harmer & Renouf, 2010</ref>
 +
 
 +
The key element of remote project management is that the project is coordinated from outside: a different city, country, etc. Moreover, one of the consequences is that the team is geographically dispersed. As NGOs, some companies have also scattered crews all over the world working on the same project. Thereby, the same challenge must be overcome.
 +
 
 +
= Key Challenge in the Coordination of Dispersed Teams =
 +
 
 +
[[File: challenge.jpg|rigth|thumb|650px|Figure 2: Challenge of remote team<ref name=Monica></ref>]] The key challenge for international NGOs is to deal with geographically dispersed teams and all the consequences. They would prefer to be on the field for a more effective action but due to insecurity reasons they have to oversee the activities from another location. Thereby they want to pursue a humanitarian imperative principle <ref name=once></ref>: ''getting aid to those in need as the first priority-even if it must be done from a distance''. Usual companies are practicing remote project more for offshore outsourcing and develop new markets. But this lead to the same coordination problem inside the company.
 +
 
 +
This kind of management has several negative sides as risk transfer on local team or poor quality and coordination. But those are due to a short-term decision-making attitude. The cluster approach that will be explained later resolves some of these drawbacks and can be applied to common companies. As it can be seen on figure 2, the two main difficulties are to communicate effectively and trust.
  
= Key Challenge in the Coordination of dispersed teams =
 
  
[[File:challenge.jpg|left|thumb|350px]] The key challenge for international NGO's is to deal with geographically dispersed team and all the consequences. They would prefer to be on the field for a more effective action but due to insecurity reasons they have to oversee the activities from another location. Thereby to continue to pursue a humanitarian imperative principle <ref>[ Once Removed, Stoddard, Lessons and Challenges in remote management of humanitarian operations for insecure area]</ref>: getting aid to those in need as the first priority-even if it must be done from a distance.
 
This kind of management has several negative side as risk transfer on local team or poor quality and coordination. But those are due to a short-term decision-making attitude. The cluster approach that will be explained latter resolve some of these drawbacks.
 
  
 
=== Trust ===
 
=== Trust ===
  
As local NGO should have trust in their international management, dispersed teams should have the same behavior with the Head Offices. It enforces the formation of cohesiveness between team members. If there is not enough trust between the teams, they will have some difficulties to face challenge and even sometimes blame each other. Moreover, the local NGO has a better understanding of the problem but international headquarters have experience from different and previous experience, Therefore, scattered teams should understand the skills of everyone and use them with trust.
+
As local NGOs should have trust in their international management, dispersed teams should have the same behavior with the Head Office of the company. It enforces the formation of cohesiveness between team members. If there is not enough confidence between the teams, they will have some difficulties to face challenges and even sometimes blame each other. Moreover, the local workers have a better understanding of the problem but international headquarters have knowledge from different and previous experiences. Therefore, scattered teams should appreciate the skills of everyone and use them with trust.
  
=== Difference in Time zones, language and cultural barriers ===
+
=== Difference in Time Zones, Language and Cultural Barriers ===
An American NGO operating in Afghanistan with a local supplier will have some issue with the communication. Indeed, because of the difference in time zones that impose some delay in the reaction mostly in emergency situation. Moreover, there could be some misunderstanding because of the difference in language.
+
An example will be taken in order to illustrate this challenge. An American NGO operating in Afghanistan with a local supplier will have some issues with the communication. Indeed, there is a difference in time zones, in languages and a cultural difference. The change in time zones imposes some delays for the response. But in emergency situation this delay is not acceptable. Therefore, there is a significant demand for staff to cover the time difference.
 +
Then, the language is also an important barrier. First, which language to use. Then, have all team members sufficient knowledge to communicate properly?  There could be some misunderstandings that can impede the progression and implementation of the emergency response. That is why the remote control should be implemented early and taking into account all these considerations.
 +
 
 +
The same likenesses are existing when firms practice 'remote management': how to be sure that the requirements and responsibilities are well understood between all the project members?
  
 
=== Technical issues ===
 
=== Technical issues ===
First, an easy solution to resolve the different in time zones could be using ''low bandwidth communication channels, such as emails or documents, which generates large amounts of lost or misunderstood information''<ref name=Monica> Monica Yap, Successful Distributed Agile Team Working Patterns, https://www.solutionsiq.com/docs/successful-distributed-team-working-patterns.pdf </ref>. Therefore, video and deskopt sharing should be use instead to promote face-to-face communications.
+
First, an easy solution to resolve the different in time zones could be using ''low bandwidth communication channels, such as emails or documents, which generates large amounts of lost or misunderstood information''<ref name=Monica> Monica Yap, Successful Distributed Agile Team Working Patterns, https://www.solutionsiq.com/docs/successful-distributed-team-working-patterns.pdf </ref>. Therefore, video and desktop sharing should be used instead to promote face-to-face communication.
  
Then, people from different countries use different technologies. Americans will prefer Microsoft Office and the Chinese more open-source software.When the team are in the same building, those problems generally will be resolved by day-to-day communication<ref name=Monica> </ref> but for remote project it will be impossible. Therefore, a clear definition of which programs should be used must be done before starting the remote project.
+
Then, employees from different countries use diverse technologies. Americans would probably prefer Microsoft Office and the Chinese more open-source software for example. When the team are in the same building, those problems will be generally resolved by face-to-face communication<ref name=Monica> </ref> but for remote project it will be impossible. Therefore, a clear definition of which programs should be used must be done before starting the remote project.
  
 
= One solution: a cluster approach =
 
= One solution: a cluster approach =
  
 
As it has been described, remote management can lead to coordination issues. In order to resolve that, the cluster approach was introduced in 2005 <ref name= once></ref>. Thereby the lead role was more formalized among the different organisations.
 
As it has been described, remote management can lead to coordination issues. In order to resolve that, the cluster approach was introduced in 2005 <ref name= once></ref>. Thereby the lead role was more formalized among the different organisations.
The cluster approach is defined by a Cluster lead, the lead coordinator for a specific area of response which is responsible for organizing coordination at global and country level, prepare global planning, guidance and acting as a last resort <ref name=BOOM> [ Logan, BOOM , The Cluster Approach: working towards best practices in Humanitarian Response, 2012]</ref>. Then, there are the lead agencies for each area of activities/clusters: logistics, camp management, etc. The cluster approach is now used in 43 countries to respond to any kind of emergency project <ref name=cluster >[Cluster Approach, One Response. http//oneresponse.info/coordination/clusterApproach/pages/ClusterApproach.aspx]</ref>
+
The cluster approach is defined by a Cluster lead, the lead coordinator for a specific area of response which is responsible for organizing coordination at global and country level, prepare global planning, guidance and acting as a last resort <ref name=BOOM> Logan, BOOM , The Cluster Approach: working towards best practices in Humanitarian Response, 2012]</ref>. Then, there are the lead agencies for each area of activities/clusters: logistics, camp management, etc. The cluster approach is now used in more than 43 countries to respond to any kind of emergency projects <ref name=cluster > Cluster Approach, One Response. http//oneresponse.info/coordination/clusterApproach/pages/ClusterApproach.aspx</ref>
  
{{#ev:youtube|https://www.youtube.com/watch?v=DvNJx8F9j4k |alignment=left }}
+
 
 +
{{#ev:youtube|https://www.youtube.com/watch?v=DvNJx8F9j4k |alignment=left}}
  
 
== Notable Benefits ==
 
== Notable Benefits ==
Even if this approach is still to be improved, notable benefits have been identified in different fields like gap identification, coordination or information sharing.
+
Even if this approach is still to be improved, notable benefits have been identified<ref name=BOOM></ref> in different fields like gap identification, coordination or information sharing.
 +
 
 
=== Gap identification and Coverage ===
 
=== Gap identification and Coverage ===
  
Thanks to a better collaboration between the agencies, it was possible to reduce the humanitarian efforts on site. Moreover, it was possible to identify the missing services inside the cluster and correct it. <ref> [ Steets,Julia.Office of the Coordination for Humanitarian Affairs. Inter-Agency Standing committee. IASC Cluster Approach Evaluation, 2nd Phase. 2010, http://ochanet.unocha.org/p/Documents/Inception_Report_CE2_Final.pdf] </ref>. Indeed, the cluster approach allows to have a collective response to a specific problem. Before that, the origin of the gap will be defined thanks to the information sharing.
+
Thanks to an improved collaboration between the agencies, it was possible to reduce the humanitarian efforts on site. Indeed, each of the members rely on each other. Moreover, it was possible to identify the missing services inside the cluster and correct it. <ref> J.Steets,Office of the Coordination for Humanitarian Affairs. Inter-Agency Standing committee. IASC Cluster Approach Evaluation, 2nd Phase. 2010, http://ochanet.unocha.org/p/Documents/Inception_Report_CE2_Final.pdf </ref>. Indeed, the cluster approach allows to have a collective response to a specific problem. The information will be shared in a better way. By this means, the origin of gaps and overlaps can be identified earlier.
 +
 
 +
On a project management perspective, offshore outsourcing has also the advantage to find the right people for the task. This is one reason why the companies are doing remote project. Besides that, IT-companies, for example, uses offshore outsourcing to have ''lower office operating costs, and reduced administrative costs, and so outsourcing becomes a more viable alternative in modern business''<ref name= IT> http://www.w2ssolutions.com/blog/5-irrefutable-benefits-of-offshore-outsourcing-that-you-cant-ignore/ </ref>
  
 
=== Coordination and leadership ===
 
=== Coordination and leadership ===
This double managing structure with on one side the Cluster lead and on the other side the cluster agencies responsible for one sector, allows to clearly understand the responsibilities of everyone.
 
This sectorial agencies are in charge of ’’ ensuring response capacity in place and that assessment, planning and response activities are carried out in collaboration with partners and in accordance with agreed standards and guidelines” <ref name=cluster></ref>.What make the cluster approach working is the fact that all the team members are working for the same common humanitarian objectives <ref name=cluster></ref>.
 
  
=== Monitoring,evaluation and Information sharing===
+
This binary managing structure with on one side the Cluster lead (UN for example) and on the other side the cluster agencies (WHO - World Health organization for instance) responsible for one sector, allows to clearly understand the responsibilities of one and all.
Before the implementation of cluster approach in the humanitarian response, each member collected information but they are not sharing between the agencies. Trough cluster they can now share valuable information, analysis, strategic planning and evaluation. <ref=boom></ref>. Thereby this system improves the understanding of an pressing issue and let easy to find an appropriate response.
+
These sector agencies are in charge of '' ensuring response capacity in place and that assessment, planning and response activities are carried out in collaboration with partners and in accordance with agreed standards and guidelines'' <ref name=cluster></ref>. What make the cluster approach working is the fact that all the team members are working for the same common humanitarian objectives <ref name=cluster></ref>. The leadership of the coordination is held by the Cluster lead and the leadership on the sector is held by the agencies.
 +
 
 +
For project managers, thanks to this structure each needs in the project are identified and related to someone. If there is a new specific need it should be a new responsible. It ensures consistency in the structure. In that way, it becomes easier to manage and identify the weaknesses. Moreover, the leadership is clearly defined.
 +
 
 +
=== Monitoring, evaluation and information sharing===
 +
 
 +
Before the implementation of cluster approach in the humanitarian response, each member collected information but the data was not shared between the agencies. No one may learn from the other experiences and there was no database. Trough cluster they can now share valuable information, analysis, strategic planning and evaluation. <ref name=BOOM></ref> Thereby this system improves the understanding of a pressing issue and it is easier to find an appropriate response. Working processes have been identified and can be so easily implemented.
 +
 
 +
Monitoring and information sharing are key elements to ensure an upright remote project for a company. As it will be seen further with the cluster project management cycle, this monitoring activities and evaluation are the core process of this model.
 +
 
 +
== Cluster Management Cycle ==
 +
The cluster Management Cycle is a way to implement the cluster approach in aid projects but it can be also applied in conventional firms who are dealing with international partners or teams.
 +
Cluster management is defined as a perpetual cyclic activity. It’s a complex, interactive and non-linear process. <ref name=PWC> J.-H. Schretlen, Uncovering excellence in cluster management, 2011, https://www.pwc.com/gx/en/psrc/pdf/cluster_management.pdf </ref>. There is so a requirement in an adaptive management structure. As explained on figure 3 six stages are essential to establish this cycle.
 +
[[File: PWC.png|rigth|thumb|650px|Figure 3: The cluster management cycle<ref name=PWC></ref>]]
  
== Cluster management cycle ==
 
The cluster approach is a way to implement in aid project but it can be also implemented in conventional companies who are dealing to international partners or teams.
 
Cluster management is defined as a perpetual cyclic activity. It’s a complex, interactive and non-linear process. <ref name=PWC> [JAn-Hendrik Schretlen, Uncovering excellence in cluster management, 2011, https://www.pwc.com/gx/en/psrc/pdf/cluster_management.pdf ] </ref>. There is so a need in an adaptive management structure. Five stages can be looked at:
 
# Define
 
# Design
 
# Implement
 
# Monitor
 
# Evaluate
 
# Revise
 
  
 
=== Define ===
 
=== Define ===
In order to have clearly defined objective, the first step is to define the expected results for the cluster. A clear vision of the long term future of the cluster should be defined. It represents the strategic planning. For example, the WHO (World Health Organisation) cluster defines is vision as promoting health in the world.
+
In order to have well-defined objective, the first step is to outline the expected results for the cluster. A clear vision of the long term future of the cluster should be defined. It represents the strategic planning. For example, the WHO (World Health Organisation) cluster defines its vision as promoting health in the world.
Another important recommendation is to identifying key uncertainties. As in insecure environment, the cluster manager is working in a highly uncertain environment and should act despite unpredictability. Key uncertainties for NGO or companies could be: <ref name=PWC> </Ref>  
+
Another important recommendation is to identifying key uncertainties. As in insecure environments, the cluster manager is working in a highly uncertain environment and should act despite unpredictability.
* continuity of commitment of the key stakeholders
+
 
* finance instability  
+
Key uncertainties for NGOs or companies could be: <ref name=PWC> </Ref>  
* change in technological and regulatory field
+
* Continuity of commitment of the key stakeholders
In order to succeed in cluster management, the vision and strategy should be developed with all clusters members. Moreover, the goals even in emergency situation should be measurable and feasible. Then, each clusters member should understand what are the benefit of this type of coordination.
+
* Finance instability  
 +
* Change in technological and regulatory field
 +
 
 +
In order to succeed in cluster management, the vision and strategy should be developed with all clusters members. Moreover, the goals even in emergency situation should be measurable and feasible. Then, each clusters member should recognise what are the benefit of this type of coordination.
 +
 
 +
=== Design ===
 +
After defining objectives, they have to be performed. As seen before, one key challenge is to maintain a clear communication between the different stakeholders. Because of the change in technologies and languages, it can become a hard task to manage. Therefore, two different plans should be presented.
  
===  Design ===
+
First, an action plan has to be implemented in order to highlight the activities, the related responsibilities, planning and allocation of the resources <ref name= PWC> </ref>. For each objective there has to be indicators for success and measurement. Thereby, a data collection could be performed afterwards. However, those indicators should be well chosen in order to avoid an overload of information.
After defining objectives, they have to be performed. As it has been seen, one key challenge is to maintain a clear communication between the different stakeholders. Because of the difference is technologies, language it can become a hard task to manage. Therefore, two different plants should be presented.
+
Then, a communication plan should be defined in order to promote a positive association, behavior between the members. Several questions should be answered in this plan like “Who are the Stakeholders?” "What are the communication mechanisms", etc. As in emergency situation is important to maintain a regular contact with the local suppliers. The frequency will differ following the role of the cluster member in the crisis as in the project for the companies. However, the communication mechanisms (software, etc.) have to be clearly characterized with all the stakeholders.  
First, an action plan has to be implemented in order to highlight the activities, the responsibilities related, planning and allocation of the resources <ref name= PWC> </ref> For each objective there has to be indicator for success and measurement. Thereby, a data collection could be performed afterwards. However, those indicators should be well chosen in order to avoid an overload of information.
+
Then, a communication plan in order to promote positive association, behaviour between the members. Several questions should be answered in this plan like “Who are the Stakeholders?” the communication mechanisms, etc. As in emergency situation is important to maintain a regular contact with the local suppliers. The frequency will differ following the role of the cluster member in the crisis as in the project for the companies. However, the communication mechanisms (software, etc) have to be clearly characterize with all the stakeholders.  
+
 
Finally, all the cluster members should accept a governance agreement for the decision making and communication.
 
Finally, all the cluster members should accept a governance agreement for the decision making and communication.
  
=== Implement ===
+
=== Implement ===
Once the design approved, the implementation has to start. Here also a similarity could be seen between the operational actions of NGO and companies: the networking, providing information, collaboration, training, etc. <ref name=biotec> [Biotechnology Cluster (1999). Report of a team led by Lord Sainsbury, Minister fro Science, United Kingdom] </ref>
+
  
===  Monitor ===
+
Once the design approved, the implementation has to start. Here also similarities could be understood between the operational actions of NGOs and companies: the networking, providing information, collaboration, training, etc. <ref name=biotech> Biotechnology Cluster (1999). Report of a team led by Lord Sainsbury, Minister of Sciences, United Kingdom </ref>. The networking activities could be done during workshops or international conferences.
 +
The most important step in the implementation is to promote collaboration between the members. If they don't have the goodwill to work together the cluster structure will collapse. However, to have a proper collaboration, it has been shown that some of the key challenge should be mastered. For instance, the technical issue can be resolved by providing training in some softwares.
  
Monitoring is extremely important to gather crucial information on the different projects. To have useful information the members must know which kind of info should be collected, their form and the involved people. To have a good monitoring it should be done on a systematic way and regular basis. <ref name=PWC></ref>
+
=== Monitor ===
There are two ways for monitoring the activities or on a process-related indicator (that should be defined in step 1) or continuously collect information on the outputs<ref name=shapiro> Shapiro, J. (2001) Monitoring and Evaluation. CIVICIUS/ World Alliance fro citizen Participation </ref>. However, this last method requires a big involvement of the cluster member to share uninterruptedly their information. For emergency case, it could very interesting but in other case it could impede the correct working of the sectorial group.
+
The goal of monitoring is to adapt and check if the cluster is acting in the right way. Moreover, it allows to identify problems in planning and/or implementation.
+
  
=== Evaluate ===
+
Monitoring is extremely important to gather crucial information on the different projects. To have useful data the participants must know which kind of info should be collected, their form and the involved people. Furthermore, it should be done on a systematic way and on a regular basis to have a good monitoring. <ref name=PWC></ref>
Comparing the actual effects with the decided strategies at a define moment is called evaluation<ref name=PWC></ref>. It differs from monitoring in the way is done. Monitoring is continuous and evaluation is at a precise moment. Moreover, the evaluation report if the objectives were reached, the strong and weakness of the cluster. Nevertheless, if there is a correct monitoring, the evaluation should be right as well.
+
There are two ways for monitoring the actions: the first option is on a process-related indicator (that should be defined in step 1- Define), the second one is a continuously collecting of information on the outputs<ref name=shapiro> Shapiro, J. (2001) Monitoring and Evaluation. CIVICIUS/ World Alliance for citizen Participation </ref>. However, this last method requires a big involvement of the cluster member to share uninterruptedly their information. For emergency case, it could be very interesting but in other case it could impede the correct working of the group.
 +
The goal of monitoring is to adapt and check if the cluster is acting in the right way. Moreover, it allows to identify problems in planning and/or implementation. The correction should be implemented as soon as possible.
 +
 
 +
=== Evaluate ===
 +
Comparing the actual effects with the decided strategies at a define moment is called evaluation<ref name=PWC></ref>. It differs from monitoring in the way is done. Monitoring is continuous and evaluation is at a precise moment (generally once or twice a year). Moreover, the evaluation report shows if the objectives were reached, the strengths and weaknesses of the cluster. It allows a complete understanding of the cluster organisation. Usually, if there is a correct monitoring, the evaluation should be right as well.
 
Two types of evaluation could be highlighted: the formative and the summative. They form together the complete evaluation.
 
Two types of evaluation could be highlighted: the formative and the summative. They form together the complete evaluation.
* Formative
+
* '''Formative'''
 
The purpose is to analyse the organisation of the cluster.
 
The purpose is to analyse the organisation of the cluster.
* Summative
+
* '''Summative'''
 
The goal is to look at the improvement of the development of the cluster and its local impact.
 
The goal is to look at the improvement of the development of the cluster and its local impact.
Then, another purpose of the evaluations is for decision policy. The evaluations are a way to justify certain decisions certainly in difficult contexts.  
+
Then, another purpose of the evaluations is for decision policy. The assessments are a way to justify certain decisions like in difficult contexts (emergency disaster, bad economic context…).  
Finally, it is extremely important for the experience and the development afterwards. Lessons could be learned and the action plan established in step 2 could be changed
+
Finally, it is extremely important for the experience and the development afterwards. Lessons could be learned and the action plan established in step 2 could be changed.
  
=== Revise ===
+
=== Revise ===
  
The final step of this cyclic process is to review objectives and uncertainties taking into account the previous stages. After that the lessons learned and results must be spread with the stakeholders or in the company.
+
The final step of this cyclic process is to review objectives and uncertainties taking into account the previous stages. After that the lessons learned and results must be spread with the stakeholders or in the company. At this stage, some reports about the different evaluations have to be produced and shared to a wider community. This last step closes the cluster management cycle.
  
 
==Cluster: a new way of teamworking ==
 
==Cluster: a new way of teamworking ==
 
   
 
   
Over time the effectiveness of a team decrease. <ref name=Havard> https://hbr.org/2013/02/the-future-of-talent-is-in-clusters </ref>. Once the project done and not a real recognition from the company for the team, tehn teh motivation could despair. Cluster team are totally the opposite of conventional team. They are by definition outside the company “but are hired and paid by companies as a unit, as a permanent part of the company” <ref name=Havard></ref>. It is like a company unit inside a company. They have their own way of working and divide the remuneration. However, they are not doing consultancy in the way that they are hired for the long term and have their own working tools and methods.
+
Over time the effectiveness of a team decreases. <ref name=Havard> D.Aron,''The Future of Talent Is in Clusters'', Harvard Business Review, 2013 https://hbr.org/2013/02/the-future-of-talent-is-in-clusters </ref>. Once the project is done and if there is not a real recognition from the company for the well-working team, the motivation of the employees could disappear. Cluster teams are totally the opposite of conventional team. They are by definition outside the company ''but are hired and paid by companies as a unit, as a permanent part of the company'' <ref name=Havard></ref>. It is like a company unit inside a company. They have their own way of working and divide the remuneration. However, they are not doing consultancy in the way that they are hired for the long term and have their own working tools and methods. This is not always the case for consultancy groups.
 +
They are ''multi-disciplinary, multi-functional collaborative networks to drive optimal outcomes. They come into being to address a particular challenge, and then dissipate to form other networks addressing other challenges''<ref name=fast> https://www.fastcompany.com/3012598/how-talent-clusters-will-help-you-win-a-sustainable-future </ref>
 +
 
 +
Regardless of the type of cluster (geographically dispersed or not), the following aspects are present<ref name=fast></ref>:
 +
*'''Custom-made plan''': operational objectives and schedule. It represents the purpose.
 +
*'''Defined time-frame''': when there is a need, the cluster is used. Once the objectives reached, the cluster has no reason to stay.
 +
*'''Evolving team members''': If new skills are required, new members will enter in the cluster.
 +
*'''Self-organized''': Clusters have their own structure and rules. They received the remuneration as a unit and spread it between the participants.
 +
 
 +
== Reflexion ==
 +
 
 +
For a project manager, clusters have the benefit that they have defined with the company a clear outcome and work for this unique result. It ensures a high motivation of the members to achieve the same goal. Therefore, the project should be divided in results to achieve. In that way, the project becomes easier to monitor and evaluate. That’s why the cluster management cycle has to be implemented early in the project.
 +
 
 +
However, this group of talent people can lead to some issues with the coordination. Indeed, it’s important to avoid the ''Apollo effect'' <ref name=talent> http://www.managementpsychology.com/articles/when-too-many-smart-people-spoil-the-team-the-apollo-effect-in-the-professional-firm/ </ref> where each member want to impose his solution. The lead manager should clearly express the responsibilities of everyone and avoid that a fellow impedes the progress of another one.
 +
 
 +
For the manager, ''the cluster model removes individual performance management''<ref name=Havard></ref> where the faithfulness of the talent members to the company is tough to achieve. Yet, the issue is to guarantee that '' the best are motivated to stay, the worst are inclined to go, and those in the middle are motivated to improve.'' <ref name=Havard></ref>. The role of the lead project manager is to preserve this motivation through the members and one way to do it is to apply correctly the cluster management cycle. Indeed, with this tool, the manager can easily show by evaluations that the cluster is working well towards the common objective.
 +
 
 +
Like any system, it needs to be improved. With the cluster management cycle, the feedback is made automatically. The video bellows that shows the main future enhancements required for the NGOs.
 +
 
 +
{{#ev:youtube|https://www.youtube.com/watch?v=9rR-__6uQhc |alignment=center}}
 +
 
 +
=Annotated Bibliography=
 +
 
 +
* For more information about remote project and the cluster approach in humanitarian operations.
 +
'''[1] A. Stoddard, A. Harmer, and J. Renouf, ''Once Removed: Lessons and Challenged in remote management of humanitarian operations for insecure areas'', 2010, Humanitarian Outcomes.'''
 +
 
 +
This article explained that organisations doing remote project can avoid the drawbacks (risk transfer, effectiveness, etc.) by a cluster approach. It explains the different challenges and types of remote projects. It explains also more in details the definition of insecure areas and why the current NGOs use remote management. It describes the current methodologies to ensures the humanitarian response.
 +
 
 +
* For more information about cluster management cycle
 +
'''[2] J.-H. Schretlen, ''Uncovering excellence in cluster management'', PWC,2011,'''
 +
 
 +
This report from PWC gives an overlook about the cluster management cycle and details deeply the six different steps. It clarifies also the cluster governance that was not exposed in this article. It is more based on knowledge-intensive clusters between companies, universities and authorities. There is less information about remote project.
 +
 
 +
*For more information about cluster as team working
 +
 
 +
'''[3] D. Aron,''The Future of Talent Is in Clusters'', Harvard Business Review, 2013'''
 +
 
 +
It enlightens about the fact that with an appropriate team working (i.e. clusters) the companies could be more innovative. It says what is the definition of a cluster as a unit of a companies, how it is work and the benefits/drawbacks of this kind of project management. The author emphasizes the fact that the current team working is not the proper way to be innovative.
  
=Conclusion=
+
*For more information about successful distributed team management
  
As it can be understood through this article is that the lessons and challenges from the emergency response could be transposed to a companies doing remote project. There are multiples difficulties to implement this kind of project as the difference in time zones, languages, and technology. Moreover, there should be a mutual trust to accomplish the specified task between the members. In some case like unsecure areas, the NGO have no choice to implement remote control. To avoid a lack of coordination they have implement some years ago a cluster approach. The system is composed by a team leader who will coordinate the actions and sectorial teams for each activity. Some notable benefits have been shown through the years as better coordination, less gap and a better information sharing between the members. The theory behind this cluster approach is based on cluster management cycle used also in knowledge cluster (academic and companies). This perpetual cycle is compose by five stages: Define, Design, Implement, Monitor,Evaluate and Revise. It gives a framework and recommendation to correctly implement cluster approach on remote project for example. It highlights the fact that a cluster approach and remote project should be think early before the project otherwise the benefits and objectives could not have been reached.
+
'''[4] M.Yap,''Successful Distributed Agile Team Working Patterns'', SolutionIQ, 2010'''
{{#ev:youtube|https://www.youtube.com/watch?v=9rR-__6uQhc |alignment=rigth }}
+
  
 +
This white paper was used more to highlight the challenges in distributed teams but it explains a lot about distributed Agile management that is not covered in this article. Nevertheless, it could be interesting if the reader wants more information about remote project without the cluster approach.
 +
It explains the best practices in this kind of team working and if it is successful to have distributed teams.
  
 
=References=
 
=References=
 
<references/>
 
<references/>

Latest revision as of 15:00, 18 December 2018

Developed by Raphaël Lassaux


Coordination of Remote Project: a Cluster Approach

The United Nations (UN) try to be present all over the world and try to response quickly in case of an emergency. However, local aid workers are subject to multiple attacks. Acting in insecure areas could mean for the NGOs (Non-Governmental Organization) huge expenses in security management. Thereby more of them prefer to use remote management to secure their international staff in a secure place. However, the remote control or remote management can lead to risk transfer to local teams, wrong accountability or monitoring. Generally, those effects are due to a bad planning. In addition, remote control is implemented in emergency situation. Though, if it’s executed and correctly planned in the early stages of the project it could really help the NGOs to still provide aid to highly insecure areas.

To avoid a lack of coordination they have implemented some years ago a cluster approach (figure 1 shows the UN clusters). The system is composed by a team leader who will coordinate the actions and sectoral teams for each activity. Some notable benefits have been demonstrated through the years as better coordination, less gap and a better information sharing between the members. The theory behind this cluster approach is based on a cluster management cycle used also in knowledge cluster (academic and companies). This perpetual cycle is composed by six stages: Define, Design, Implement, Monitor, Evaluate and Revise. It gives a framework and recommendations to correctly implement the cluster approach on remote project for example. It highlights the fact that this approach and remote project should be think early before the project otherwise the benefits and objectives could not be reached. Finally, clusters are a new way to work together. It promotes innovation and is a unit with its own agenda inside a company.

As it will be explained in this article, the lessons and challenges from the emergency response could be transposed to companies doing remote project. There are multiples difficulties to implement this kind of project as the difference in time zones, languages, and technologies. Moreover, there should be a mutual trust to accomplish the specified task between the members.

In brief, this article starts from the case of emergency situations and NGOs, shows an approach to correct certain difficulties in the collaboration process, to finally expose the cluster management cycle theory and the definition of cluster team working.

Figure 1: How the United Nation cluster works? [1]


Contents


[edit] Remote Project Management

Remote project management or remote control is defined as reducing or restricting movement or withdrawing internationals (or any other staff at particular risk) while shifting responsibilities for program delivery to local staff or local partners. [2]. It was first adopted in conflicts in early 1980s. However, only few documents explained the good practice of this kind of management and how to succeed. ‘Remote control’, ‘remote support’, ‘remote partnership’ and ‘limited access programming’ are different concepts for remote management that could be found in the literature [3]

The key element of remote project management is that the project is coordinated from outside: a different city, country, etc. Moreover, one of the consequences is that the team is geographically dispersed. As NGOs, some companies have also scattered crews all over the world working on the same project. Thereby, the same challenge must be overcome.

[edit] Key Challenge in the Coordination of Dispersed Teams

Figure 2: Challenge of remote team[4]
The key challenge for international NGOs is to deal with geographically dispersed teams and all the consequences. They would prefer to be on the field for a more effective action but due to insecurity reasons they have to oversee the activities from another location. Thereby they want to pursue a humanitarian imperative principle [2]: getting aid to those in need as the first priority-even if it must be done from a distance. Usual companies are practicing remote project more for offshore outsourcing and develop new markets. But this lead to the same coordination problem inside the company.

This kind of management has several negative sides as risk transfer on local team or poor quality and coordination. But those are due to a short-term decision-making attitude. The cluster approach that will be explained later resolves some of these drawbacks and can be applied to common companies. As it can be seen on figure 2, the two main difficulties are to communicate effectively and trust.


[edit] Trust

As local NGOs should have trust in their international management, dispersed teams should have the same behavior with the Head Office of the company. It enforces the formation of cohesiveness between team members. If there is not enough confidence between the teams, they will have some difficulties to face challenges and even sometimes blame each other. Moreover, the local workers have a better understanding of the problem but international headquarters have knowledge from different and previous experiences. Therefore, scattered teams should appreciate the skills of everyone and use them with trust.

[edit] Difference in Time Zones, Language and Cultural Barriers

An example will be taken in order to illustrate this challenge. An American NGO operating in Afghanistan with a local supplier will have some issues with the communication. Indeed, there is a difference in time zones, in languages and a cultural difference. The change in time zones imposes some delays for the response. But in emergency situation this delay is not acceptable. Therefore, there is a significant demand for staff to cover the time difference. Then, the language is also an important barrier. First, which language to use. Then, have all team members sufficient knowledge to communicate properly? There could be some misunderstandings that can impede the progression and implementation of the emergency response. That is why the remote control should be implemented early and taking into account all these considerations.

The same likenesses are existing when firms practice 'remote management': how to be sure that the requirements and responsibilities are well understood between all the project members?

[edit] Technical issues

First, an easy solution to resolve the different in time zones could be using low bandwidth communication channels, such as emails or documents, which generates large amounts of lost or misunderstood information[4]. Therefore, video and desktop sharing should be used instead to promote face-to-face communication.

Then, employees from different countries use diverse technologies. Americans would probably prefer Microsoft Office and the Chinese more open-source software for example. When the team are in the same building, those problems will be generally resolved by face-to-face communication[4] but for remote project it will be impossible. Therefore, a clear definition of which programs should be used must be done before starting the remote project.

[edit] One solution: a cluster approach

As it has been described, remote management can lead to coordination issues. In order to resolve that, the cluster approach was introduced in 2005 [2]. Thereby the lead role was more formalized among the different organisations. The cluster approach is defined by a Cluster lead, the lead coordinator for a specific area of response which is responsible for organizing coordination at global and country level, prepare global planning, guidance and acting as a last resort [5]. Then, there are the lead agencies for each area of activities/clusters: logistics, camp management, etc. The cluster approach is now used in more than 43 countries to respond to any kind of emergency projects [6]



[edit] Notable Benefits

Even if this approach is still to be improved, notable benefits have been identified[5] in different fields like gap identification, coordination or information sharing.

[edit] Gap identification and Coverage

Thanks to an improved collaboration between the agencies, it was possible to reduce the humanitarian efforts on site. Indeed, each of the members rely on each other. Moreover, it was possible to identify the missing services inside the cluster and correct it. [7]. Indeed, the cluster approach allows to have a collective response to a specific problem. The information will be shared in a better way. By this means, the origin of gaps and overlaps can be identified earlier.

On a project management perspective, offshore outsourcing has also the advantage to find the right people for the task. This is one reason why the companies are doing remote project. Besides that, IT-companies, for example, uses offshore outsourcing to have lower office operating costs, and reduced administrative costs, and so outsourcing becomes a more viable alternative in modern business[8]

[edit] Coordination and leadership

This binary managing structure with on one side the Cluster lead (UN for example) and on the other side the cluster agencies (WHO - World Health organization for instance) responsible for one sector, allows to clearly understand the responsibilities of one and all. These sector agencies are in charge of ensuring response capacity in place and that assessment, planning and response activities are carried out in collaboration with partners and in accordance with agreed standards and guidelines [6]. What make the cluster approach working is the fact that all the team members are working for the same common humanitarian objectives [6]. The leadership of the coordination is held by the Cluster lead and the leadership on the sector is held by the agencies.

For project managers, thanks to this structure each needs in the project are identified and related to someone. If there is a new specific need it should be a new responsible. It ensures consistency in the structure. In that way, it becomes easier to manage and identify the weaknesses. Moreover, the leadership is clearly defined.

[edit] Monitoring, evaluation and information sharing

Before the implementation of cluster approach in the humanitarian response, each member collected information but the data was not shared between the agencies. No one may learn from the other experiences and there was no database. Trough cluster they can now share valuable information, analysis, strategic planning and evaluation. [5] Thereby this system improves the understanding of a pressing issue and it is easier to find an appropriate response. Working processes have been identified and can be so easily implemented.

Monitoring and information sharing are key elements to ensure an upright remote project for a company. As it will be seen further with the cluster project management cycle, this monitoring activities and evaluation are the core process of this model.

[edit] Cluster Management Cycle

The cluster Management Cycle is a way to implement the cluster approach in aid projects but it can be also applied in conventional firms who are dealing with international partners or teams. Cluster management is defined as a perpetual cyclic activity. It’s a complex, interactive and non-linear process. [9]. There is so a requirement in an adaptive management structure. As explained on figure 3 six stages are essential to establish this cycle.

Figure 3: The cluster management cycle[9]


[edit] Define

In order to have well-defined objective, the first step is to outline the expected results for the cluster. A clear vision of the long term future of the cluster should be defined. It represents the strategic planning. For example, the WHO (World Health Organisation) cluster defines its vision as promoting health in the world. Another important recommendation is to identifying key uncertainties. As in insecure environments, the cluster manager is working in a highly uncertain environment and should act despite unpredictability.

Key uncertainties for NGOs or companies could be: [9]

  • Continuity of commitment of the key stakeholders
  • Finance instability
  • Change in technological and regulatory field

In order to succeed in cluster management, the vision and strategy should be developed with all clusters members. Moreover, the goals even in emergency situation should be measurable and feasible. Then, each clusters member should recognise what are the benefit of this type of coordination.

[edit] Design

After defining objectives, they have to be performed. As seen before, one key challenge is to maintain a clear communication between the different stakeholders. Because of the change in technologies and languages, it can become a hard task to manage. Therefore, two different plans should be presented.

First, an action plan has to be implemented in order to highlight the activities, the related responsibilities, planning and allocation of the resources [9]. For each objective there has to be indicators for success and measurement. Thereby, a data collection could be performed afterwards. However, those indicators should be well chosen in order to avoid an overload of information. Then, a communication plan should be defined in order to promote a positive association, behavior between the members. Several questions should be answered in this plan like “Who are the Stakeholders?” "What are the communication mechanisms", etc. As in emergency situation is important to maintain a regular contact with the local suppliers. The frequency will differ following the role of the cluster member in the crisis as in the project for the companies. However, the communication mechanisms (software, etc.) have to be clearly characterized with all the stakeholders. Finally, all the cluster members should accept a governance agreement for the decision making and communication.

[edit] Implement

Once the design approved, the implementation has to start. Here also similarities could be understood between the operational actions of NGOs and companies: the networking, providing information, collaboration, training, etc. [10]. The networking activities could be done during workshops or international conferences. The most important step in the implementation is to promote collaboration between the members. If they don't have the goodwill to work together the cluster structure will collapse. However, to have a proper collaboration, it has been shown that some of the key challenge should be mastered. For instance, the technical issue can be resolved by providing training in some softwares.

[edit] Monitor

Monitoring is extremely important to gather crucial information on the different projects. To have useful data the participants must know which kind of info should be collected, their form and the involved people. Furthermore, it should be done on a systematic way and on a regular basis to have a good monitoring. [9] There are two ways for monitoring the actions: the first option is on a process-related indicator (that should be defined in step 1- Define), the second one is a continuously collecting of information on the outputs[11]. However, this last method requires a big involvement of the cluster member to share uninterruptedly their information. For emergency case, it could be very interesting but in other case it could impede the correct working of the group. The goal of monitoring is to adapt and check if the cluster is acting in the right way. Moreover, it allows to identify problems in planning and/or implementation. The correction should be implemented as soon as possible.

[edit] Evaluate

Comparing the actual effects with the decided strategies at a define moment is called evaluation[9]. It differs from monitoring in the way is done. Monitoring is continuous and evaluation is at a precise moment (generally once or twice a year). Moreover, the evaluation report shows if the objectives were reached, the strengths and weaknesses of the cluster. It allows a complete understanding of the cluster organisation. Usually, if there is a correct monitoring, the evaluation should be right as well. Two types of evaluation could be highlighted: the formative and the summative. They form together the complete evaluation.

  • Formative

The purpose is to analyse the organisation of the cluster.

  • Summative

The goal is to look at the improvement of the development of the cluster and its local impact. Then, another purpose of the evaluations is for decision policy. The assessments are a way to justify certain decisions like in difficult contexts (emergency disaster, bad economic context…). Finally, it is extremely important for the experience and the development afterwards. Lessons could be learned and the action plan established in step 2 could be changed.

[edit] Revise

The final step of this cyclic process is to review objectives and uncertainties taking into account the previous stages. After that the lessons learned and results must be spread with the stakeholders or in the company. At this stage, some reports about the different evaluations have to be produced and shared to a wider community. This last step closes the cluster management cycle.

[edit] Cluster: a new way of teamworking

Over time the effectiveness of a team decreases. [12]. Once the project is done and if there is not a real recognition from the company for the well-working team, the motivation of the employees could disappear. Cluster teams are totally the opposite of conventional team. They are by definition outside the company but are hired and paid by companies as a unit, as a permanent part of the company [12]. It is like a company unit inside a company. They have their own way of working and divide the remuneration. However, they are not doing consultancy in the way that they are hired for the long term and have their own working tools and methods. This is not always the case for consultancy groups. They are multi-disciplinary, multi-functional collaborative networks to drive optimal outcomes. They come into being to address a particular challenge, and then dissipate to form other networks addressing other challenges[13]

Regardless of the type of cluster (geographically dispersed or not), the following aspects are present[13]:

  • Custom-made plan: operational objectives and schedule. It represents the purpose.
  • Defined time-frame: when there is a need, the cluster is used. Once the objectives reached, the cluster has no reason to stay.
  • Evolving team members: If new skills are required, new members will enter in the cluster.
  • Self-organized: Clusters have their own structure and rules. They received the remuneration as a unit and spread it between the participants.

[edit] Reflexion

For a project manager, clusters have the benefit that they have defined with the company a clear outcome and work for this unique result. It ensures a high motivation of the members to achieve the same goal. Therefore, the project should be divided in results to achieve. In that way, the project becomes easier to monitor and evaluate. That’s why the cluster management cycle has to be implemented early in the project.

However, this group of talent people can lead to some issues with the coordination. Indeed, it’s important to avoid the Apollo effect [14] where each member want to impose his solution. The lead manager should clearly express the responsibilities of everyone and avoid that a fellow impedes the progress of another one.

For the manager, the cluster model removes individual performance management[12] where the faithfulness of the talent members to the company is tough to achieve. Yet, the issue is to guarantee that the best are motivated to stay, the worst are inclined to go, and those in the middle are motivated to improve. [12]. The role of the lead project manager is to preserve this motivation through the members and one way to do it is to apply correctly the cluster management cycle. Indeed, with this tool, the manager can easily show by evaluations that the cluster is working well towards the common objective.

Like any system, it needs to be improved. With the cluster management cycle, the feedback is made automatically. The video bellows that shows the main future enhancements required for the NGOs.


[edit] Annotated Bibliography

  • For more information about remote project and the cluster approach in humanitarian operations.

[1] A. Stoddard, A. Harmer, and J. Renouf, Once Removed: Lessons and Challenged in remote management of humanitarian operations for insecure areas, 2010, Humanitarian Outcomes.

This article explained that organisations doing remote project can avoid the drawbacks (risk transfer, effectiveness, etc.) by a cluster approach. It explains the different challenges and types of remote projects. It explains also more in details the definition of insecure areas and why the current NGOs use remote management. It describes the current methodologies to ensures the humanitarian response.

  • For more information about cluster management cycle

[2] J.-H. Schretlen, Uncovering excellence in cluster management, PWC,2011,

This report from PWC gives an overlook about the cluster management cycle and details deeply the six different steps. It clarifies also the cluster governance that was not exposed in this article. It is more based on knowledge-intensive clusters between companies, universities and authorities. There is less information about remote project.

  • For more information about cluster as team working

[3] D. Aron,The Future of Talent Is in Clusters, Harvard Business Review, 2013

It enlightens about the fact that with an appropriate team working (i.e. clusters) the companies could be more innovative. It says what is the definition of a cluster as a unit of a companies, how it is work and the benefits/drawbacks of this kind of project management. The author emphasizes the fact that the current team working is not the proper way to be innovative.

  • For more information about successful distributed team management

[4] M.Yap,Successful Distributed Agile Team Working Patterns, SolutionIQ, 2010

This white paper was used more to highlight the challenges in distributed teams but it explains a lot about distributed Agile management that is not covered in this article. Nevertheless, it could be interesting if the reader wants more information about remote project without the cluster approach. It explains the best practices in this kind of team working and if it is successful to have distributed teams.

[edit] References

  1. United Nations Office for humanitarian affairs, http://www.unocha.org/sites/default/files/OCHA_Category/What%20We%20Do/cluster-leads.png
  2. 2.0 2.1 2.2 Once Removed, Stoddard, Lessons and Challenges in remote management of humanitarian operations for insecure area
  3. Hansen, 2008; Stoddard, Harmer & Renouf, 2010
  4. 4.0 4.1 4.2 Monica Yap, Successful Distributed Agile Team Working Patterns, https://www.solutionsiq.com/docs/successful-distributed-team-working-patterns.pdf
  5. 5.0 5.1 5.2 Logan, BOOM , The Cluster Approach: working towards best practices in Humanitarian Response, 2012]
  6. 6.0 6.1 6.2 Cluster Approach, One Response. http//oneresponse.info/coordination/clusterApproach/pages/ClusterApproach.aspx
  7. J.Steets,Office of the Coordination for Humanitarian Affairs. Inter-Agency Standing committee. IASC Cluster Approach Evaluation, 2nd Phase. 2010, http://ochanet.unocha.org/p/Documents/Inception_Report_CE2_Final.pdf
  8. http://www.w2ssolutions.com/blog/5-irrefutable-benefits-of-offshore-outsourcing-that-you-cant-ignore/
  9. 9.0 9.1 9.2 9.3 9.4 9.5 J.-H. Schretlen, Uncovering excellence in cluster management, 2011, https://www.pwc.com/gx/en/psrc/pdf/cluster_management.pdf
  10. Biotechnology Cluster (1999). Report of a team led by Lord Sainsbury, Minister of Sciences, United Kingdom
  11. Shapiro, J. (2001) Monitoring and Evaluation. CIVICIUS/ World Alliance for citizen Participation
  12. 12.0 12.1 12.2 12.3 D.Aron,The Future of Talent Is in Clusters, Harvard Business Review, 2013 https://hbr.org/2013/02/the-future-of-talent-is-in-clusters
  13. 13.0 13.1 https://www.fastcompany.com/3012598/how-talent-clusters-will-help-you-win-a-sustainable-future
  14. http://www.managementpsychology.com/articles/when-too-many-smart-people-spoil-the-team-the-apollo-effect-in-the-professional-firm/
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox