Prince2
(→Background) |
(→Abstract) |
||
(96 intermediate revisions by one user not shown) | |||
Line 1: | Line 1: | ||
== Abstract == | == Abstract == | ||
− | Many major projects fail due to complexity and poor management. The use of standardized project management | + | Many major projects fail due to complexity and poor management. The use of a standardized project management methodology is in many cases a necessity in order to achieve desired progress and meet project objectives. PRINCE2 (PRojects IN Controlled Environments) is a widely used project management methodology and highly useable for managing advanced projects. It is designed to drive projects with focus on benefits in each stage of the project. The essence of PRINCE2 is to break the project down into smaller stages which simplifies the project's process. Many different international standards exist, where most project management standards are process oriented. The two dominant process-oriented certification bodies internationally are AXELOS Ltd’s PRINCE2 and The Project Management Institute (PMI) with Project Management Professional (PMP) based on the Project Management Body of Knowledge (PMBOK Guide).<ref name=''Projectmanagement''>Paul D. Gardiner. 2005. Project management - a strategic approach. New York: Palgrave Macmillan</ref> |
+ | |||
+ | The following article will describe what role PRINCE2 plays in project management. Moreover, the PRINCE2 methodology is described with respect to its principles, themes and processes. Similarities and differences between PRINCE2 and the PMBOK Guide are outlined to enlighten common misconceptions that are important to address as they are among the most used standards in state-of-the-art project management. While PRINCE2 describes in detail how to manage a project as a whole, the PMBOK Guide focus on project management knowledge. A critical evaluation of PRINCE2 it undertaken, to demonstrate the limitations it has. The article will describe how the PMBOK Guide can cover PRINCE2 limitations.<ref name="Managing Successful Projects" /><ref name=pmi /> | ||
== Background == | == Background == | ||
− | + | It is first of all important to point out why one need project management certifications such as PRINCE2, and why there is a need for project management at all. A survey from the international consultancy company PwC states that “higher-performing projects are significantly more likely to be staffed with certified project managers” <ref name=''Insightspwc''>Pwc. 2007. "Insights and Trends: Current Programme and Project Management Practices*." Accessed February 21, 2019. https://www.pwcprojects.co/Documentos/BRO%20Boosting%20Business%20Performance%20DC-07-1104-A%20v8%5B1%5D.pdf</ref>. The organization Project Management Institute defines project management as “the application of knowledge, skills, tools and techniques to project activities to meet the project requirements.” <ref name=pmi>Project Management Institute, Inc. 2017. Project Management: A guide to the Project Management Body of Knowledge (PMBOK guide) 6 th Edition. Pennsylvania USA: Project Management Institute, Inc. (PMI). </ref> In order to efficiently execute projects in an effective manner, good project management is the key. Good project management will help individuals, groups and organizations to: | |
*Increase chances of success | *Increase chances of success | ||
*Predict better | *Predict better | ||
*Satisfy stakeholders | *Satisfy stakeholders | ||
− | *Meet desired | + | *Meet desired objective(s) |
*Resolve issues as they appear | *Resolve issues as they appear | ||
− | *Manage constraints, such as schedule, scope | + | *Manage constraints, such as schedule, scope and costs |
*Manage change conveniently | *Manage change conveniently | ||
Line 22: | Line 24: | ||
*Failure to meet desired objective(s) | *Failure to meet desired objective(s) | ||
− | As development of successful projects represents a key role in creating value for a given organization, it is clear that effective project management is critical for the organization as a whole. PRINCE2 is a proven best practice in project management and provides a common language for the project’s participants. Using a project framework everyone agrees upon makes communication easier, whereas there is a common understanding of steps and roles. The efficiency of implementing projects increases. Benefits are many and proven. | + | As development of successful projects represents a key role in creating value for a given organization, it is clear that effective project management is critical for the organization as a whole. PRINCE2 is a proven best practice in project management and provides a common language for the project’s participants. Using a project framework everyone agrees upon makes communication easier, whereas there is a common understanding of steps and roles. The efficiency of implementing projects increases. Benefits are many and proven.<ref name="Managing Successful Projects" /><ref name=pmi /> |
== Overview == | == Overview == | ||
− | [[File: APPP_PRINCE2.jpg |300px|thumb|right|top|Figure 1: PRINCE2 structure <ref name=" | + | [[File: APPP_PRINCE2.jpg |300px|thumb|right|top|Figure 1: PRINCE2 structure <ref name="PRINCE2structure">Based on Figure 1.1 N. Bennett, R. Buttrick, P. Stanton. 2017. Managing Successful Projects with PRINCE2, 6th ed. Norwich: AXELOS Limited</ref>]] |
PRINCE2 is a project management methodology and stands for PRojects IN Controlled Environments. It is used globally and based on experience from professionals within a variety of different professions and industries. It is generic and can be applied to projects of different art, regardless of project scale, type, organization, geography or culture. | PRINCE2 is a project management methodology and stands for PRojects IN Controlled Environments. It is used globally and based on experience from professionals within a variety of different professions and industries. It is generic and can be applied to projects of different art, regardless of project scale, type, organization, geography or culture. | ||
Line 34: | Line 36: | ||
===PRINCE2 principles=== | ===PRINCE2 principles=== | ||
− | The PRINCE2 principles are important to be familiar with when determining whether a project should be managed with PRINCE2 or not. There are seven principles that must all be fulfilled for a project to be appropriately managed by the use of PRINCE2. | + | The PRINCE2 principles are important to be familiar with when determining whether a project should be managed with PRINCE2 or not. There are seven principles that must all be fulfilled for a project to be appropriately managed by the use of PRINCE2.<ref name="Managing Successful Projects" /> |
The seven PRINCE2 principles are: | The seven PRINCE2 principles are: | ||
Line 41: | Line 43: | ||
**There must be an approved justified reason for initiating the project. The justification will have to continue throughout the life of the project. | **There must be an approved justified reason for initiating the project. The justification will have to continue throughout the life of the project. | ||
*Learn from experience | *Learn from experience | ||
− | **Project’s team members learn from experience. | + | **Project’s team members learn from experience. Reviewing previous projects so that lessons are learned before initiating a project. The learning process continues throughout the project so that improvements can be incorporated during the life span of the project. Experience and lessons learned from the project shall be passed on. |
*Defined roles and responsibilities | *Defined roles and responsibilities | ||
**Established roles and responsibilities within the structure of the organization which involves the stakeholder interest for those involved. | **Established roles and responsibilities within the structure of the organization which involves the stakeholder interest for those involved. | ||
Line 49: | Line 51: | ||
**Responsibilities for directing, managing and delivering projects are clearly defined so that accountability is maintained on all levels. Accountability is secured by delegation of authority from one management level to the next by defining performance tolerances by: cost, time, quality, scope, benefits and risk. Exceeded tolerances are defined as an exception and upper management will have to decide on how to handle the issue. | **Responsibilities for directing, managing and delivering projects are clearly defined so that accountability is maintained on all levels. Accountability is secured by delegation of authority from one management level to the next by defining performance tolerances by: cost, time, quality, scope, benefits and risk. Exceeded tolerances are defined as an exception and upper management will have to decide on how to handle the issue. | ||
*Focus on products | *Focus on products | ||
− | **Quality requirements are important in PRINCE2 as projects with this focus tend to be successful | + | **Quality requirements are important in PRINCE2 as projects with this focus tend to be successful. |
*Tailor to suit the project | *Tailor to suit the project | ||
**PRINCE2 universal nature towards managing projects is retained because of its design to be tailored. As a consequence, it can fulfill required needs. | **PRINCE2 universal nature towards managing projects is retained because of its design to be tailored. As a consequence, it can fulfill required needs. | ||
Line 68: | Line 70: | ||
| Quality || Quality of the deliverables (products) || What? | | Quality || Quality of the deliverables (products) || What? | ||
|- | |- | ||
− | | Plans || | + | | Plans || Description of how to make/modify the project’s products. Time and money required. When to perform activities || How? How much? When? |
|- | |- | ||
| Risk || Plans on how to manage risk || What if? | | Risk || Plans on how to manage risk || What if? | ||
Line 83: | Line 85: | ||
The seven PRINCE2 processes are as follow; | The seven PRINCE2 processes are as follow; | ||
− | *Starting up at project: consider if the project is fundamentally a good idea. | + | *Starting up at project: consider if the project is fundamentally a good idea. Choose whether to continue or close down the project. |
*Directing a project: the project board make key decisions and are accountable for the project’s success and manage an overall project control. | *Directing a project: the project board make key decisions and are accountable for the project’s success and manage an overall project control. | ||
*Initiating a project: establishment of foundations for the project. Making sure that the organization knows what needs to be done in order to fulfill the project’s objectives. | *Initiating a project: establishment of foundations for the project. Making sure that the organization knows what needs to be done in order to fulfill the project’s objectives. | ||
Line 90: | Line 92: | ||
*Managing product delivery: controlling the relation between project manager and team managers. Requirements for acceptance, execution and delivery are to be agreed on. | *Managing product delivery: controlling the relation between project manager and team managers. Requirements for acceptance, execution and delivery are to be agreed on. | ||
*Closing a project: product deliverables are being handed over and budget closed. | *Closing a project: product deliverables are being handed over and budget closed. | ||
− | |||
− | |||
− | |||
− | |||
== How PRINCE2 relates to PMP == | == How PRINCE2 relates to PMP == | ||
− | There are many different project management certifications out there. When it comes to comparing PRINCE2 in relation to the many certifications, one can point out Project Management Professional (PMP) and PMBOK Guide as a natural basis for comparison. After all, PRINCE2 and PMP are two of the most recognized project management certifications on the market. | + | There are many different project management certifications out there. When it comes to comparing PRINCE2 in relation to the many certifications, one can point out Project Management Professional (PMP) and the PMBOK Guide as a natural basis for comparison. After all, PRINCE2 and PMP are two of the most recognized project management certifications on the market.<ref name="Managing Successful Projects" /><ref name=pmi /> |
===Comparison=== | ===Comparison=== | ||
− | A certification in either of the two methods will consequently require time and money invested. Identifying the differences and similarities may be of interest as selecting the right certification can be confusing. A key aspect to point out is that PRINCE2 is more concerned with managing the project as a whole, while PMBOK Guide describes the knowledge required by a project manager. That being said, PRINCE2 and PMBOK Guide complements each other. Rather than choosing one of them it can be advantageous to choose both. | + | A certification in either of the two methods will consequently require time and money invested. Identifying the differences and similarities may be of interest as selecting the right certification can be confusing. A key aspect to point out is that PRINCE2 is more concerned with managing the project as a whole, while the PMBOK Guide describes the knowledge required by a project manager. That being said, PRINCE2 and the PMBOK Guide complements each other. Rather than choosing one of them it can be advantageous to choose both. |
− | PMBOK Guide is a guide provided by the Project Management Institute that describes a body of knowledge, generally speaking – a set of standard project management terminology and guidelines. The body of knowledge is generic and thus applicable to all kinds of projects. It is a process-based approach where work is accomplished by processes. The processes consist of ten knowledge areas: integration, scope, schedule, cost, quality, resource, communications, risk, procurement, stakeholder. | + | The PMBOK Guide is a guide provided by the Project Management Institute that describes a body of knowledge, generally speaking – a set of standard project management terminology and guidelines. The body of knowledge is generic and thus applicable to all kinds of projects. It is a process-based approach where work is accomplished by processes. The processes consist of ten knowledge areas: integration, scope, schedule, cost, quality, resource, communications, risk, procurement, stakeholder. |
− | PMBOK Guide supports the project manager on what he or she should do in a guidance format, while also providing tools and techniques. However, PMBOK Guide is limited when it comes to | + | The PMBOK Guide supports the project manager on what he or she should do in a guidance format, while also providing tools and techniques. However, the PMBOK Guide is limited when it comes to methodology. PRINCE2 comes in handy here, whereas it covers defined roles and responsibilities, activities order, objective descriptions. Moreover, PRINCE2 also provides principles which makes it easier to know how to use it. Unlike the PMBOK Guide, PRINCE2 will not describe specific tools and techniques. |
− | One can say that PMBOK Guide | + | One can say that the PMBOK Guide gives a project manager knowledge in project management, while PRINCE2 will answer multiple questions according to the different themes in how to actually manage a given project.<ref name="Managing Successful Projects" /><ref name=pmi /><ref name="Klas Skogmar">Klas Skogmar. 2015. PRINCE2®, the PMBOK® Guide and ISO 21500:2012. Norwich: AXELOS Limited</ref> |
===Differences=== | ===Differences=== | ||
− | The are some differences between PRINCE2 and PMBOK Guide although they are complementary. Their view on constraints vary, where PMBOK Guide defines it | + | The are some differences between PRINCE2 and the PMBOK Guide although they are complementary. Their view on constraints vary, where the PMBOK Guide defines it as a “limiting factor that affects the execution”. Costs, schedule, scope, risk and resources are mentioned constraint examples. PRINCE2 employs tolerances instead of constraints in order to control the project – with a total of six tolerances. They work as defined acceptabilities; if everything stays within the given tolerances, the project is under control. If exceeded, the situation must be acted upon and managed by exception.<ref name="Klas Skogmar" /> |
− | '''Phases/stages | + | '''Phases/stages''' Progression in the PMBOK Guide is divided into what is called phases, PRINCE2 use stages. Stages in PRINCE2 are more detailed and they cannot overlap. As a consequence, the project sponsor gains more authority. The phase concept in the PMBOK Guide is more general and can even overlap each other. |
− | ''' | + | |
− | Progression in PMBOK Guide is divided into what is called phases, PRINCE2 use stages. Stages in PRINCE2 are more detailed and they cannot overlap. As a consequence, the project sponsor gains more authority. The phase concept is more general and can even overlap each other. | + | |
− | '''Business case | + | '''Business case''' A business case can be defined as a project’s justification. The business case is dynamic in PRINCE2 and therefore updated throughout the project’s process. The business case work as an input to the project charter (project brief in PRINCE2) in the PMBOK Guide and is used statically. |
− | ''' | + | |
− | A business case can be defined as a project’s justification. The business case is dynamic in PRINCE2 and therefore updated throughout the process. The business case work as an input to the project charter in PMBOK Guide and is used | + | |
− | '''Organization | + | '''Organization''' PRINCE2 is highly organized where it takes care of project governance. Interest of the three primary categories of stakeholders (business, user, supplier) are represented. Delegation and reporting routines are defined. The PMBOK Guide does not provide an organizational setup as it has a more general approach towards organization describing overall roles such as project manager, project stakeholder. |
− | ''' | + | |
− | PRINCE2 is highly organized where it takes care of project governance. Interest of the three primary categories of stakeholders (business, user, supplier) are represented. Delegation and reporting routines are defined. PMBOK Guide does not provide an organizational setup as it has a more general approach towards organization describing overall roles such as project manager, project stakeholder. | + | |
− | ''' | + | '''Scope management''' The PMBOK Guide manages scope generally, based on agreed requirements. The scope is then organized into a work breakdown structure (WBS). A similar approach is used in PRINCE2, but with focus on actual outputs, the deliverables of the project. The project’s deliverables are described with acceptance criteria’s and what the customer expects when it comes to quality. A product breakdown structure (PBS) is used. As the PBS can be categorized as a special kind of WBS they can be used together. By using both approaches the project scope can be view with different perspectives for multiple stakeholders.<ref name="PMI Constraints"> Siegelaub, J. M. 2007. "Six (yes six!) constraints: an enhanced model for project control." Paper presented at PMI® Global Congress 2007—North America, Atlanta, GA. Newtown Square, PA: Project Management Institute. https://www.pmi.org/learning/library/six-constraints-enhanced-model-project-control-7294</ref> |
===Certification=== | ===Certification=== | ||
− | ''' | + | '''Accreditation of PMP and PRINCE2''' |
− | In order to get a PMP or PRINCE2 (Foundation or | + | In order to get a PMP or PRINCE2 (Foundation or Practitioner) certification one must sign up for an exam. A brief overview of the different exams: |
{| class="wikitable" | {| class="wikitable" | ||
Line 140: | Line 132: | ||
|- | |- | ||
− | | '''Exam | + | | '''Exam literature''' || PMBOK Guide || The official manual, Managing Successful Projects with PRINCE2 || The official manual, Managing Successful Projects with PRINCE2 |
|- | |- | ||
− | | '''Questions''' || 200 || | + | | '''Questions''' || 200 || 50 (28 marks or above to pass) || 68 (38 marks or more required to pass) |
|- | |- | ||
− | | '''Format''' || Multiple choice || Multiple choice || | + | | '''Format''' || Multiple choice || Multiple choice || Multiple choice |
|- | |- | ||
− | | '''Question style''' | + | | '''Question style''' || Abstract || Objective testing || Scenario, additional information and questions |
|- | |- | ||
| '''Time''' || 240 min || 60 min || 150 min | | '''Time''' || 240 min || 60 min || 150 min | ||
Line 155: | Line 147: | ||
|} | |} | ||
− | The PRINCE2 | + | The PRINCE2 Practitioner exam is slightly different from the PRINCE2 Foundation exam as the certification is divided into two levels. PRINCE2 Foundation certification represents the PRINCE2 entry level certification. The PRINCE2 Foundation exam is the most basic among the three exams. PMP and PRINCE2 Practitioner can be described with equal level of difficulty, although this is a subjective matter.<ref name=''PMP handbook''>PMI. 2019. Project management professional handbook. https://www.pmi.org/-/media/pmi/documents/public/pdf/certifications/project-management-professional-handbook.pdf?la=en</ref><ref name=PRINCE2Practitioner>AXELOS. 2017. PRINCE2® Practitioner Candidate Syllabus. https://www.axelos.com/Corporate/media/Files/Syllabi/PRINCE2-2017-Practitioner-Syllabus.pdf </ref><ref name=PRINCE2Foundation>AXELOS. 2018. PRINCE2 Agile® Foundation Candidate Syllabus. https://www.axelos.com/getmedia/318c4cb2-da75-4728-888c-26020bfdb41b/PRINCE2-Agile-Foundation-Candidate-Syllabus.aspx</ref> |
'''Prerequisites''' | '''Prerequisites''' | ||
− | There are no formal prerequisites for taking the PRINCE2 Foundation exam. For PRINCE2 Practitioner | + | There are no formal prerequisites for taking the PRINCE2 Foundation exam. For PRINCE2 Practitioner candidates must provide proof of having passed PRINCE2 Foundation or PMP (there are also other exceptions). In order to take a PMP certification candidates must have project management experience. The amount of hours experience needed varies with educational background, split into second degree and four-year degree. Four-year degree candidates need at least 3 years of project management experience (5 years for professionals with a second degree only). 4500 hours of leading experience in directing project must also be obtained (7500 hours for professionals with a second degree). 35 hours of formal project management experience is also required for both four-year and second degree holders.<ref name=PMPcertification>PMI. 2019. "Project Management Professional (PMP)®". Accessed February 20, 2019. https://www.pmi.org/certifications/types/project-management-pmp</ref> |
− | + | '''Practical Costs''' | |
In order to get a PMP or PRINCE2 certification the candidate must pass examination which involves a financial cost, in addition to the cost of the PMBOK Guide and “Managing Successful Projects with PRINCE2” materials respectively. | In order to get a PMP or PRINCE2 certification the candidate must pass examination which involves a financial cost, in addition to the cost of the PMBOK Guide and “Managing Successful Projects with PRINCE2” materials respectively. | ||
Line 172: | Line 164: | ||
|- | |- | ||
− | | '''Exam litterature''' || PMBOK Guide 6th ed. ≈ $51<ref name=''PMBOKlitteraturecost''> | + | | '''Exam litterature''' || PMBOK Guide 6th ed. ≈ $51<ref name=''PMBOKlitteraturecost''>Amazon. 2019. "A Guide to the Project Management Body of Knowledge (PMBOK® Guide)–Sixth Edition" Accessed February 21, 2019. https://www.amazon.com/Project-Management-Knowledge-PMBOK%C2%AE-Sixth/dp/1628251840 </ref> || Managing Successful Projects with PRINCE2 2017 ed. ≈ $91<ref name=PRINCE2litteraturecost>Amazon. 2019. "Managing Successful Projects with PRINCE2 2017th Edition" Accessed February 21, 2019. https://www.amazon.com/Managing-Successful-Projects-PRINCE2-Stationery-dp-0113315333/dp/0113315333/ref=mt_paperback?_encoding=UTF8&me=&qid=1551644238 </ref> || Managing Successful Projects with PRINCE2 2017 ed. ≈ $91<ref name=PRINCE2litteraturecost /> |
|- | |- | ||
| '''Exam cost''' || For PMI members $405 and $555 for non PMI members || Varies as price is set by AXELOS partners || Varies as price is set by AXELOS partners | | '''Exam cost''' || For PMI members $405 and $555 for non PMI members || Varies as price is set by AXELOS partners || Varies as price is set by AXELOS partners | ||
Line 179: | Line 171: | ||
|} | |} | ||
− | The examination cost for PRINCE2 is not fixed as AXELOS does not provide examination | + | The examination cost for PRINCE2 is not fixed as AXELOS does not provide examination themselves but in partnership with others. Getting a PRINCE2 certification will therefore vary from country to country and also with examiner of choice. Moreover, it will depend on whether the candidate gain the needed knowledge by self-studies, from a course online or through an AXELOS partner providing a seminar or similar. Poor project management may result in severe consequences like missed deadlines and cost overruns. Improving team members project management skills by taking the financial cost of acquiring both a PRINCE2 and PMP certification can therefore be argued for.<ref name=PMPcertification /><ref name="Managing Successful Projects" /> |
− | ===PRINCE2 and PMBOK Guide - summarized=== | + | ===PRINCE2 and the PMBOK Guide - summarized=== |
− | Using PRINCE2 and PMBOK Guide together contributes to method and knowledge respectively. The PMBOK Guide provides a body of knowledge which is highly necessary for | + | Using PRINCE2 and the PMBOK Guide together contributes to method and knowledge respectively. The PMBOK Guide provides a body of knowledge which is highly necessary for project managers so that they can be confident in their management role. With PRINCE2 project managers have a process-based method to work with, securing a satisfying progression. The complementary aspect is a key reason for why PRINCE2 and the PMBOK Guide should live alongside with each other. Even though certification in both will be of great cost, the consequences of poor project management skills will be many, and likely surpass certification costs.<ref name="Managing Successful Projects" /><ref name=pmi /><ref name="Klas Skogmar" /> |
== Critical Evaluation == | == Critical Evaluation == | ||
− | PRINCE2 is a powerful project management method, but it has some constraints, and the use of it does not guarantee for a project succeeding. It can be considered unsuitable for smaller projects, or for projects where requirements are dynamic. This can be explained by work intensive procedures related to | + | PRINCE2 is a powerful project management method, but it has some constraints, and the use of it does not guarantee for a project succeeding. It can be considered unsuitable for smaller projects, or for projects where requirements are particularly dynamic. This can be explained by work intensive procedures related to a continuous need for documentation and logging. Using PRINCE2 for the smallest projects may simply be unnecessary in relation to the gains achieved. It can in some cases lead to a pointless production of different management related documents with no or minor substance. This can contribute to a situation where the focus on management is unbalanced with the actually work being done. The extra documentation time required is simply not justifiable. |
On the other side, one can argue that PRINCE2 can be scaled and tailored to meet the concerns about an excessive focus on the management part of a project. However, by using the stated argument it is hard deny whether PRINCE2 is appropriate as a project management tool as any confrontational problem can be characterized as an improper use of PRINCE2. This reasoning will not accuse the PRINCE2 methodology as a reason to the problem itself, but rather the application of it. | On the other side, one can argue that PRINCE2 can be scaled and tailored to meet the concerns about an excessive focus on the management part of a project. However, by using the stated argument it is hard deny whether PRINCE2 is appropriate as a project management tool as any confrontational problem can be characterized as an improper use of PRINCE2. This reasoning will not accuse the PRINCE2 methodology as a reason to the problem itself, but rather the application of it. | ||
− | Generally speaking, three different categories are to be recognized as omitted from the PRINCE2 scope: <ref name="Managing Successful Projects" /> | + | Generally speaking, three different categories are to be recognized as omitted from the PRINCE2 scope:<ref name="Managing Successful Projects" /> |
'''Specialist aspects''' | '''Specialist aspects''' | ||
− | Its generic nature makes it less suitable for activities that are specified for unique activities within different industries. Agile methods, specific techniques including change management or procurement and project lifecycles which all are seen as specific activities, can although be used along with PRINCE2. | + | Its generic nature makes it less suitable for activities that are specified for unique activities within different industries. Agile methods, specific techniques including change management or procurement and project lifecycles which all are seen as specific activities, can although be used along with PRINCE2.<ref name="Managing Successful Projects" /> |
'''Detailed techniques''' | '''Detailed techniques''' | ||
− | Well known techniques in planning and control, such as critical path analysis, are not described in detail in PRINCE2. Only techniques that are unique to PRINCE2 or specifically recommended for a certain planning and control setting are described in detail. An example is the PRINCE2 quality review technique. | + | Well known techniques in planning and control, such as critical path analysis, are not described in detail in PRINCE2. Only techniques that are unique to PRINCE2 or specifically recommended for a certain planning and control setting are described in detail. An example is the PRINCE2 quality review technique.<ref name="Managing Successful Projects" /> |
'''Capability for leadership''' | '''Capability for leadership''' | ||
− | It is not possible to methodize a leadership style that works in every single situation. This is important to empathize as leadership, motivational skills and similar are vastly critical in project management. One cannot simply set a fixed method for leadership, as one leadership style may work well in a given situation and completely unsuitable in another. | + | It is not possible to methodize a leadership style that works in every single situation. This is important to empathize as leadership, motivational skills and similar are vastly critical in project management. One cannot simply set a fixed method for leadership, as one leadership style may work well in a given situation and completely unsuitable in another.<ref name="Managing Successful Projects" /> |
+ | |||
+ | == Conclusion == | ||
+ | |||
+ | PRINCE2 is a project methodology suitable for any kind of project, with its structured process-based approach. The PMBOK Guide can contribute to the three different categories recognized as omitted from the PRINCE2 scope; specialist aspects, detailed techniques, capability for leadership. Knowledge from the PMBOK Guide can provide the project manager with confidence and a point of reference when being confronted with management challenges that are non-typical (specialist aspects). The PMBOK describes techniques in project management, such as critical path analysis, in detail. Although it is not possible to methodize a leadership style that work for every situation, the PMBOK Guide introduces different leadership styles in chapter 3, “the role of the project manager”, that can contribute to a project manager’s capability for leadership. Certifying in both PRINCE2 and PMP is of great financial cost and requires hours spent on training. However, PRINCE2 managers will need a body of knowledge, in order to be confident in their management role. And the PMBOK Guide requires a methodology, such as PRINCE2, that team members can use for their projects in order to achieve good project management.<ref name="Managing Successful Projects" /><ref name=pmi /><ref name="Klas Skogmar" /> | ||
+ | |||
+ | == Annotated Bibliography == | ||
+ | |||
+ | '''Nigel Bennett, Robert Buttrick, Phil Stanton. 2017. Managing Successful Projects with PRINCE2, 6th ed. Norwich: AXELOS Limited''' The Managing Successful Projects with PRINCE2 is the most used reference in the article. It is used as literature for explaining the key aspects of PRINCE2 in the article. The book is also the used literature for PRINCE2 Foundation and PRINCE2 Practitioner candidates. | ||
− | + | '''Project Management Institute. 2017. ''Project Management: A guide to the Project Management Body of Knowledge (PMBOK guide) 6th Edition''. Pennsylvania, USA: Project Management Institute, Inc.''' The PMBOK Guide is used as a reference throughout the article, especially for comparing the two state-of-the-art management certifications PMP and PRINCE2. The PMBOK Guide is published by the PMI organization and a recognized standard in state-of-the-art project management. | |
+ | '''Klas Skogmar. 2015. PRINCE2®, the PMBOK® Guide and ISO 21500:2012. Norwich: AXELOS Limited''' The article describes the relationship between PRINCE2 and the PMBOK Guide. It also includes the ISO 21500 standard. The article is written by Klas Skogmar, consultant in Arkatay Consulting AB. | ||
== References == | == References == | ||
<references /> | <references /> |
Latest revision as of 23:32, 4 March 2019
Contents |
[edit] Abstract
Many major projects fail due to complexity and poor management. The use of a standardized project management methodology is in many cases a necessity in order to achieve desired progress and meet project objectives. PRINCE2 (PRojects IN Controlled Environments) is a widely used project management methodology and highly useable for managing advanced projects. It is designed to drive projects with focus on benefits in each stage of the project. The essence of PRINCE2 is to break the project down into smaller stages which simplifies the project's process. Many different international standards exist, where most project management standards are process oriented. The two dominant process-oriented certification bodies internationally are AXELOS Ltd’s PRINCE2 and The Project Management Institute (PMI) with Project Management Professional (PMP) based on the Project Management Body of Knowledge (PMBOK Guide).[1]
The following article will describe what role PRINCE2 plays in project management. Moreover, the PRINCE2 methodology is described with respect to its principles, themes and processes. Similarities and differences between PRINCE2 and the PMBOK Guide are outlined to enlighten common misconceptions that are important to address as they are among the most used standards in state-of-the-art project management. While PRINCE2 describes in detail how to manage a project as a whole, the PMBOK Guide focus on project management knowledge. A critical evaluation of PRINCE2 it undertaken, to demonstrate the limitations it has. The article will describe how the PMBOK Guide can cover PRINCE2 limitations.[2][3]
[edit] Background
It is first of all important to point out why one need project management certifications such as PRINCE2, and why there is a need for project management at all. A survey from the international consultancy company PwC states that “higher-performing projects are significantly more likely to be staffed with certified project managers” [4]. The organization Project Management Institute defines project management as “the application of knowledge, skills, tools and techniques to project activities to meet the project requirements.” [3] In order to efficiently execute projects in an effective manner, good project management is the key. Good project management will help individuals, groups and organizations to:
- Increase chances of success
- Predict better
- Satisfy stakeholders
- Meet desired objective(s)
- Resolve issues as they appear
- Manage constraints, such as schedule, scope and costs
- Manage change conveniently
In contrast. Poor project management skills may result in:
- Cost overruns
- Deadline overruns
- Rework
- Failure to meet desired objective(s)
As development of successful projects represents a key role in creating value for a given organization, it is clear that effective project management is critical for the organization as a whole. PRINCE2 is a proven best practice in project management and provides a common language for the project’s participants. Using a project framework everyone agrees upon makes communication easier, whereas there is a common understanding of steps and roles. The efficiency of implementing projects increases. Benefits are many and proven.[2][3]
[edit] Overview
PRINCE2 is a project management methodology and stands for PRojects IN Controlled Environments. It is used globally and based on experience from professionals within a variety of different professions and industries. It is generic and can be applied to projects of different art, regardless of project scale, type, organization, geography or culture.
The method can be described with four integrated elements: principles, themes, processes and project environment.[2]
[edit] PRINCE2 principles
The PRINCE2 principles are important to be familiar with when determining whether a project should be managed with PRINCE2 or not. There are seven principles that must all be fulfilled for a project to be appropriately managed by the use of PRINCE2.[2]
The seven PRINCE2 principles are:
- Continued business justification
- There must be an approved justified reason for initiating the project. The justification will have to continue throughout the life of the project.
- Learn from experience
- Project’s team members learn from experience. Reviewing previous projects so that lessons are learned before initiating a project. The learning process continues throughout the project so that improvements can be incorporated during the life span of the project. Experience and lessons learned from the project shall be passed on.
- Defined roles and responsibilities
- Established roles and responsibilities within the structure of the organization which involves the stakeholder interest for those involved.
- Manage by stages
- A project must be managed stage-by-stage. The PRINCE2 project is required to have a minimum of two stages: the initiation stage and an additional management stage.
- Manage by exception
- Responsibilities for directing, managing and delivering projects are clearly defined so that accountability is maintained on all levels. Accountability is secured by delegation of authority from one management level to the next by defining performance tolerances by: cost, time, quality, scope, benefits and risk. Exceeded tolerances are defined as an exception and upper management will have to decide on how to handle the issue.
- Focus on products
- Quality requirements are important in PRINCE2 as projects with this focus tend to be successful.
- Tailor to suit the project
- PRINCE2 universal nature towards managing projects is retained because of its design to be tailored. As a consequence, it can fulfill required needs.
[edit] PRINCE2 themes
The themes address what is critical to address when it comes to project management. This is an ongoing progress throughout the project’s lifetime.[2]
Theme | Description | Answers |
---|---|---|
Business case | Justification for undertaking the project | Why? |
Organization | Roles and responsibilities | Who? |
Quality | Quality of the deliverables (products) | What? |
Plans | Description of how to make/modify the project’s products. Time and money required. When to perform activities | How? How much? When? |
Risk | Plans on how to manage risk | What if? |
Change | Management of change and impact general change | Impact? |
Progress | Viability of the project's plans | Status? Direction? Continue? |
[edit] PRINCE2 processes
The processes describe the project’s progress during its lifetime. From before initiating project activities to the closure of the project. The process based methodology in PRINCE2 provides checklists with recommended activities, products and respective responsibilities.[2]
The seven PRINCE2 processes are as follow;
- Starting up at project: consider if the project is fundamentally a good idea. Choose whether to continue or close down the project.
- Directing a project: the project board make key decisions and are accountable for the project’s success and manage an overall project control.
- Initiating a project: establishment of foundations for the project. Making sure that the organization knows what needs to be done in order to fulfill the project’s objectives.
- Controlling a stage: assign and monitor work. Problem solving, reporting progress to project board.
- Managing a stage boundary: reporting stages and plan the next stage.
- Managing product delivery: controlling the relation between project manager and team managers. Requirements for acceptance, execution and delivery are to be agreed on.
- Closing a project: product deliverables are being handed over and budget closed.
[edit] How PRINCE2 relates to PMP
There are many different project management certifications out there. When it comes to comparing PRINCE2 in relation to the many certifications, one can point out Project Management Professional (PMP) and the PMBOK Guide as a natural basis for comparison. After all, PRINCE2 and PMP are two of the most recognized project management certifications on the market.[2][3]
[edit] Comparison
A certification in either of the two methods will consequently require time and money invested. Identifying the differences and similarities may be of interest as selecting the right certification can be confusing. A key aspect to point out is that PRINCE2 is more concerned with managing the project as a whole, while the PMBOK Guide describes the knowledge required by a project manager. That being said, PRINCE2 and the PMBOK Guide complements each other. Rather than choosing one of them it can be advantageous to choose both.
The PMBOK Guide is a guide provided by the Project Management Institute that describes a body of knowledge, generally speaking – a set of standard project management terminology and guidelines. The body of knowledge is generic and thus applicable to all kinds of projects. It is a process-based approach where work is accomplished by processes. The processes consist of ten knowledge areas: integration, scope, schedule, cost, quality, resource, communications, risk, procurement, stakeholder.
The PMBOK Guide supports the project manager on what he or she should do in a guidance format, while also providing tools and techniques. However, the PMBOK Guide is limited when it comes to methodology. PRINCE2 comes in handy here, whereas it covers defined roles and responsibilities, activities order, objective descriptions. Moreover, PRINCE2 also provides principles which makes it easier to know how to use it. Unlike the PMBOK Guide, PRINCE2 will not describe specific tools and techniques.
One can say that the PMBOK Guide gives a project manager knowledge in project management, while PRINCE2 will answer multiple questions according to the different themes in how to actually manage a given project.[2][3][6]
[edit] Differences
The are some differences between PRINCE2 and the PMBOK Guide although they are complementary. Their view on constraints vary, where the PMBOK Guide defines it as a “limiting factor that affects the execution”. Costs, schedule, scope, risk and resources are mentioned constraint examples. PRINCE2 employs tolerances instead of constraints in order to control the project – with a total of six tolerances. They work as defined acceptabilities; if everything stays within the given tolerances, the project is under control. If exceeded, the situation must be acted upon and managed by exception.[6]
Phases/stages Progression in the PMBOK Guide is divided into what is called phases, PRINCE2 use stages. Stages in PRINCE2 are more detailed and they cannot overlap. As a consequence, the project sponsor gains more authority. The phase concept in the PMBOK Guide is more general and can even overlap each other.
Business case A business case can be defined as a project’s justification. The business case is dynamic in PRINCE2 and therefore updated throughout the project’s process. The business case work as an input to the project charter (project brief in PRINCE2) in the PMBOK Guide and is used statically.
Organization PRINCE2 is highly organized where it takes care of project governance. Interest of the three primary categories of stakeholders (business, user, supplier) are represented. Delegation and reporting routines are defined. The PMBOK Guide does not provide an organizational setup as it has a more general approach towards organization describing overall roles such as project manager, project stakeholder.
Scope management The PMBOK Guide manages scope generally, based on agreed requirements. The scope is then organized into a work breakdown structure (WBS). A similar approach is used in PRINCE2, but with focus on actual outputs, the deliverables of the project. The project’s deliverables are described with acceptance criteria’s and what the customer expects when it comes to quality. A product breakdown structure (PBS) is used. As the PBS can be categorized as a special kind of WBS they can be used together. By using both approaches the project scope can be view with different perspectives for multiple stakeholders.[7]
[edit] Certification
Accreditation of PMP and PRINCE2
In order to get a PMP or PRINCE2 (Foundation or Practitioner) certification one must sign up for an exam. A brief overview of the different exams:
PMP | PRINCE2 Foundation | PRINCE2 Practitioner | |
---|---|---|---|
Exam literature | PMBOK Guide | The official manual, Managing Successful Projects with PRINCE2 | The official manual, Managing Successful Projects with PRINCE2 |
Questions | 200 | 50 (28 marks or above to pass) | 68 (38 marks or more required to pass) |
Format | Multiple choice | Multiple choice | Multiple choice |
Question style | Abstract | Objective testing | Scenario, additional information and questions |
Time | 240 min | 60 min | 150 min |
Aid | None | None | Open book |
Location | Specified | Specified/online | Specified/online |
The PRINCE2 Practitioner exam is slightly different from the PRINCE2 Foundation exam as the certification is divided into two levels. PRINCE2 Foundation certification represents the PRINCE2 entry level certification. The PRINCE2 Foundation exam is the most basic among the three exams. PMP and PRINCE2 Practitioner can be described with equal level of difficulty, although this is a subjective matter.[8][9][10]
Prerequisites
There are no formal prerequisites for taking the PRINCE2 Foundation exam. For PRINCE2 Practitioner candidates must provide proof of having passed PRINCE2 Foundation or PMP (there are also other exceptions). In order to take a PMP certification candidates must have project management experience. The amount of hours experience needed varies with educational background, split into second degree and four-year degree. Four-year degree candidates need at least 3 years of project management experience (5 years for professionals with a second degree only). 4500 hours of leading experience in directing project must also be obtained (7500 hours for professionals with a second degree). 35 hours of formal project management experience is also required for both four-year and second degree holders.[11]
Practical Costs
In order to get a PMP or PRINCE2 certification the candidate must pass examination which involves a financial cost, in addition to the cost of the PMBOK Guide and “Managing Successful Projects with PRINCE2” materials respectively.
PMP certification | PRINCE2 Foundation certification | PRINCE2 Practitioner certification | |
---|---|---|---|
Exam litterature | PMBOK Guide 6th ed. ≈ $51[12] | Managing Successful Projects with PRINCE2 2017 ed. ≈ $91[13] | Managing Successful Projects with PRINCE2 2017 ed. ≈ $91[13] |
Exam cost | For PMI members $405 and $555 for non PMI members | Varies as price is set by AXELOS partners | Varies as price is set by AXELOS partners |
Renewing | Every 3 years | Not necessary | 5 calendar years after certification |
The examination cost for PRINCE2 is not fixed as AXELOS does not provide examination themselves but in partnership with others. Getting a PRINCE2 certification will therefore vary from country to country and also with examiner of choice. Moreover, it will depend on whether the candidate gain the needed knowledge by self-studies, from a course online or through an AXELOS partner providing a seminar or similar. Poor project management may result in severe consequences like missed deadlines and cost overruns. Improving team members project management skills by taking the financial cost of acquiring both a PRINCE2 and PMP certification can therefore be argued for.[11][2]
[edit] PRINCE2 and the PMBOK Guide - summarized
Using PRINCE2 and the PMBOK Guide together contributes to method and knowledge respectively. The PMBOK Guide provides a body of knowledge which is highly necessary for project managers so that they can be confident in their management role. With PRINCE2 project managers have a process-based method to work with, securing a satisfying progression. The complementary aspect is a key reason for why PRINCE2 and the PMBOK Guide should live alongside with each other. Even though certification in both will be of great cost, the consequences of poor project management skills will be many, and likely surpass certification costs.[2][3][6]
[edit] Critical Evaluation
PRINCE2 is a powerful project management method, but it has some constraints, and the use of it does not guarantee for a project succeeding. It can be considered unsuitable for smaller projects, or for projects where requirements are particularly dynamic. This can be explained by work intensive procedures related to a continuous need for documentation and logging. Using PRINCE2 for the smallest projects may simply be unnecessary in relation to the gains achieved. It can in some cases lead to a pointless production of different management related documents with no or minor substance. This can contribute to a situation where the focus on management is unbalanced with the actually work being done. The extra documentation time required is simply not justifiable.
On the other side, one can argue that PRINCE2 can be scaled and tailored to meet the concerns about an excessive focus on the management part of a project. However, by using the stated argument it is hard deny whether PRINCE2 is appropriate as a project management tool as any confrontational problem can be characterized as an improper use of PRINCE2. This reasoning will not accuse the PRINCE2 methodology as a reason to the problem itself, but rather the application of it.
Generally speaking, three different categories are to be recognized as omitted from the PRINCE2 scope:[2]
Specialist aspects
Its generic nature makes it less suitable for activities that are specified for unique activities within different industries. Agile methods, specific techniques including change management or procurement and project lifecycles which all are seen as specific activities, can although be used along with PRINCE2.[2]
Detailed techniques
Well known techniques in planning and control, such as critical path analysis, are not described in detail in PRINCE2. Only techniques that are unique to PRINCE2 or specifically recommended for a certain planning and control setting are described in detail. An example is the PRINCE2 quality review technique.[2]
Capability for leadership
It is not possible to methodize a leadership style that works in every single situation. This is important to empathize as leadership, motivational skills and similar are vastly critical in project management. One cannot simply set a fixed method for leadership, as one leadership style may work well in a given situation and completely unsuitable in another.[2]
[edit] Conclusion
PRINCE2 is a project methodology suitable for any kind of project, with its structured process-based approach. The PMBOK Guide can contribute to the three different categories recognized as omitted from the PRINCE2 scope; specialist aspects, detailed techniques, capability for leadership. Knowledge from the PMBOK Guide can provide the project manager with confidence and a point of reference when being confronted with management challenges that are non-typical (specialist aspects). The PMBOK describes techniques in project management, such as critical path analysis, in detail. Although it is not possible to methodize a leadership style that work for every situation, the PMBOK Guide introduces different leadership styles in chapter 3, “the role of the project manager”, that can contribute to a project manager’s capability for leadership. Certifying in both PRINCE2 and PMP is of great financial cost and requires hours spent on training. However, PRINCE2 managers will need a body of knowledge, in order to be confident in their management role. And the PMBOK Guide requires a methodology, such as PRINCE2, that team members can use for their projects in order to achieve good project management.[2][3][6]
[edit] Annotated Bibliography
Nigel Bennett, Robert Buttrick, Phil Stanton. 2017. Managing Successful Projects with PRINCE2, 6th ed. Norwich: AXELOS Limited The Managing Successful Projects with PRINCE2 is the most used reference in the article. It is used as literature for explaining the key aspects of PRINCE2 in the article. The book is also the used literature for PRINCE2 Foundation and PRINCE2 Practitioner candidates.
Project Management Institute. 2017. Project Management: A guide to the Project Management Body of Knowledge (PMBOK guide) 6th Edition. Pennsylvania, USA: Project Management Institute, Inc. The PMBOK Guide is used as a reference throughout the article, especially for comparing the two state-of-the-art management certifications PMP and PRINCE2. The PMBOK Guide is published by the PMI organization and a recognized standard in state-of-the-art project management.
Klas Skogmar. 2015. PRINCE2®, the PMBOK® Guide and ISO 21500:2012. Norwich: AXELOS Limited The article describes the relationship between PRINCE2 and the PMBOK Guide. It also includes the ISO 21500 standard. The article is written by Klas Skogmar, consultant in Arkatay Consulting AB.
[edit] References
- ↑ Paul D. Gardiner. 2005. Project management - a strategic approach. New York: Palgrave Macmillan
- ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 Nigel Bennett, Robert Buttrick, Phil Stanton. 2017. Managing Successful Projects with PRINCE2, 6th ed. Norwich: AXELOS Limited
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 Project Management Institute, Inc. 2017. Project Management: A guide to the Project Management Body of Knowledge (PMBOK guide) 6 th Edition. Pennsylvania USA: Project Management Institute, Inc. (PMI).
- ↑ Pwc. 2007. "Insights and Trends: Current Programme and Project Management Practices*." Accessed February 21, 2019. https://www.pwcprojects.co/Documentos/BRO%20Boosting%20Business%20Performance%20DC-07-1104-A%20v8%5B1%5D.pdf
- ↑ Based on Figure 1.1 N. Bennett, R. Buttrick, P. Stanton. 2017. Managing Successful Projects with PRINCE2, 6th ed. Norwich: AXELOS Limited
- ↑ 6.0 6.1 6.2 6.3 Klas Skogmar. 2015. PRINCE2®, the PMBOK® Guide and ISO 21500:2012. Norwich: AXELOS Limited
- ↑ Siegelaub, J. M. 2007. "Six (yes six!) constraints: an enhanced model for project control." Paper presented at PMI® Global Congress 2007—North America, Atlanta, GA. Newtown Square, PA: Project Management Institute. https://www.pmi.org/learning/library/six-constraints-enhanced-model-project-control-7294
- ↑ PMI. 2019. Project management professional handbook. https://www.pmi.org/-/media/pmi/documents/public/pdf/certifications/project-management-professional-handbook.pdf?la=en
- ↑ AXELOS. 2017. PRINCE2® Practitioner Candidate Syllabus. https://www.axelos.com/Corporate/media/Files/Syllabi/PRINCE2-2017-Practitioner-Syllabus.pdf
- ↑ AXELOS. 2018. PRINCE2 Agile® Foundation Candidate Syllabus. https://www.axelos.com/getmedia/318c4cb2-da75-4728-888c-26020bfdb41b/PRINCE2-Agile-Foundation-Candidate-Syllabus.aspx
- ↑ 11.0 11.1 PMI. 2019. "Project Management Professional (PMP)®". Accessed February 20, 2019. https://www.pmi.org/certifications/types/project-management-pmp
- ↑ Amazon. 2019. "A Guide to the Project Management Body of Knowledge (PMBOK® Guide)–Sixth Edition" Accessed February 21, 2019. https://www.amazon.com/Project-Management-Knowledge-PMBOK%C2%AE-Sixth/dp/1628251840
- ↑ 13.0 13.1 Amazon. 2019. "Managing Successful Projects with PRINCE2 2017th Edition" Accessed February 21, 2019. https://www.amazon.com/Managing-Successful-Projects-PRINCE2-Stationery-dp-0113315333/dp/0113315333/ref=mt_paperback?_encoding=UTF8&me=&qid=1551644238