Talk:Lessons learned

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 5: Line 5:
 
*Introduction
 
*Introduction
 
**Setting
 
**Setting
 
+
*Application
 
+
**Methodology
- Abstract
+
***Identify
- Introduction
+
***Document
    - Setting
+
***Analyse
- Application
+
***Store
    - Methodology
+
***Retrieve
        - Identify
+
*Avoid project failure with the use of lessons learned
        - Document
+
*Benefits and limitations
        - Analyse
+
**Benefits
        - Store
+
**Limitatios
        - Retrieve
+
*Annotated bibliography
- Avoid project failure with the use of lessons learned
+
*References
- Benefits and limitations
+
    - Benefits
+
    - Limitations
+
- Annotated bibliography
+
- References
+

Revision as of 15:38, 11 February 2023

In general, the content and figures in the original article are good. My focus is not going to be on rewriting what is already there, as the majority is well written and relevant. However, my focus is going to be on creating a better structure and a common red thread between the sections. In addition, I will be adding a number of sections and figures to the article that will touch on things that are not already there.

My suggesions for the structure of the updated article:

  • Abstract
  • Introduction
    • Setting
  • Application
    • Methodology
      • Identify
      • Document
      • Analyse
      • Store
      • Retrieve
  • Avoid project failure with the use of lessons learned
  • Benefits and limitations
    • Benefits
    • Limitatios
  • Annotated bibliography
  • References
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox