(WBS) - Work Breakdown Structure
LukasBonitz (Talk | contribs) (→Diffrent Type-structures) |
LukasBonitz (Talk | contribs) (→Diffrent Type-structures) |
||
Line 18: | Line 18: | ||
== Diffrent Type-structures == | == Diffrent Type-structures == | ||
+ | MECE Structure | ||
=== Deliverable-Based WBS === | === Deliverable-Based WBS === | ||
+ | Based on tangible items | ||
+ | |||
=== Phase-Based WBS === | === Phase-Based WBS === | ||
+ | Build around the project life cycle phases | ||
+ | |||
=== System/Subsystem === | === System/Subsystem === | ||
+ | Build arround systems and subsystems that compose those systems | ||
+ | |||
=== Mixed or Hybrid === | === Mixed or Hybrid === | ||
+ | Incorporates two or more of the approaches mentioned above | ||
== Benefits of WBS == | == Benefits of WBS == |
Revision as of 23:28, 19 February 2023
The WBS (work breakdown structure) is a process used in project management to identify the scope of a project and all the associated tasks that must be done to complete the project as defined. For this purpose, a results-oriented hierarchical decomposition of the work is carried out. This technology not only makes the work more accessible and manageable. It also enables the monitoring of different processes of a project, the estimation of costs and schedules and helps with team building. This led to WBS becoming one of the most important project management tools.
In the following, the author presents the different structuring techniques of a work breakdown structure. Furthermore, he describes the process of creating a work breakdown structure, the different forms of presentation as well as the advantages and limitations of a work breakdown structure and will illustrate these with examples.
Contents |
Backgroud
- U.S Department of Defense 1960´s
- Developed by Nasa
Fundamentals of the WBS
- Packages
- Control accounts
- Levels
- WBS Dictionary
- 100% Rule
Diffrent Type-structures
MECE Structure
Deliverable-Based WBS
Based on tangible items
Phase-Based WBS
Build around the project life cycle phases
System/Subsystem
Build arround systems and subsystems that compose those systems
Mixed or Hybrid
Incorporates two or more of the approaches mentioned above
Benefits of WBS
- Detailed illustration of scope
- Monitor progress
- Cost and schedule estimates
- Build project teams