Construction Contract Management Guidelines and Administration

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 46: Line 46:
  
  
[[File:Contract management Processes.JPG]]
+
[[File:Contract management Processes.JPG]]<br />
 
Figure 1: Pre and Post Award Activities<ref>http://www.coreworx.com/effective-contract-management-in-engineering-and-construction-projects-pre-award-to-post-award/</ref>
 
Figure 1: Pre and Post Award Activities<ref>http://www.coreworx.com/effective-contract-management-in-engineering-and-construction-projects-pre-award-to-post-award/</ref>
 
<br />
 
<br />
Line 64: Line 64:
 
Some of the most common types of construction contracts used in the construction industry are the following:<ref>http://fidic.org/sites/default/files/FIDIC_Suite_of_Contracts_0.pdf</ref><br />
 
Some of the most common types of construction contracts used in the construction industry are the following:<ref>http://fidic.org/sites/default/files/FIDIC_Suite_of_Contracts_0.pdf</ref><br />
  
[[File:FIDIC FORM OF CONTRACTS.JPG]]
+
[[File: FIDIC FORM OF CONTRACTS.JPG]]<br />
 
Figure 2.0 Fidic form of contracts
 
Figure 2.0 Fidic form of contracts
  
Line 91: Line 91:
 
'''1.6 BENEFITS OF GOOD CONTRACT MANAGEMENT'''
 
'''1.6 BENEFITS OF GOOD CONTRACT MANAGEMENT'''
  
[[File:Benefits of good contract management.JPG]]
+
[[File:Benefits of good contract management.JPG]]<br />
 
Figure 3.0 Image from Business Integrity's 2013 Contract Management Survey.<ref>http://www.metrocorpcounsel.com/articles/23582/business-integrity%E2%80%99s-2013-contract-management-survey-reveals-big-opportunities-saving</ref>
 
Figure 3.0 Image from Business Integrity's 2013 Contract Management Survey.<ref>http://www.metrocorpcounsel.com/articles/23582/business-integrity%E2%80%99s-2013-contract-management-survey-reveals-big-opportunities-saving</ref>
  
Line 100: Line 100:
 
_________________________________________________________________________________________________________________________________________________________________________
 
_________________________________________________________________________________________________________________________________________________________________________
 
<br />
 
<br />
The key to successful post award contract implementation is to ensure that the pre-award activities (tender) are properly carried out. It is important that contracts are actively monitor throughout its lifecycle to help ensure supplier performance is satisfactory, stakeholders are well informed and all contract requirements are met.  
+
The key to successful post award contract implementation is to ensure that the pre-award activities (tender) are properly carried out. It is important that contracts are actively monitor throughout its lifecycle to help ensure supplier performance is satisfactory, stakeholders are well informed and all contract requirements are being meet.  
  
  
Line 106: Line 106:
  
 
'''2.1.1  Planning for effective contract management''' <br />
 
'''2.1.1  Planning for effective contract management''' <br />
: There are 3 key stages to consider in planning for effective contract management during the pre-award stage.<br />
+
There are 3 key stages to consider in planning for effective contract management during the pre-award stage.<br />
  
  
[[File: Planning for effective contract management.JPG]]
+
[[File: Planning for effective contract management.JPG]]<br />
Figure 4.0
+
Figure 4.0 image from PMMS Contract Management Guidelines <ref>https://www.scribd.com/document/196148989/Contract-Management-Guidelines</ref>
  
(1) CONTRACT ESTABLISHMENT<br />
+
'''(1) CONTRACT ESTABLISHMENT'''<br />
 
Some of the key issues that will determine the long-term success or failure of contract management include:<br />
 
Some of the key issues that will determine the long-term success or failure of contract management include:<br />
* Planning <br />
 
* Specification development<br />
 
* Style of the procurement process<br />
 
* Realistic contracts<br />
 
* Contract Transition Planning <br />
 
2  DETERMINING THE CONTRACT MANAGEMENT APPROACH<br />
 
  
3   IDENTIFYING AND MANAGING RISK<br />
+
* Planning – to address issues such as what is the type of specifications involve, how many numbers of contractors needed, how long is the contract duration and the role of sub-contractors should be considered in procurement planning. <br />
 +
 
 +
* Specification development -  A Clear specifications that include measurable KPIs to reduce the risk of contract disputes, cost blow-outs and poor outcomes<br />
 +
 
 +
* Contract Transition Planning - Well planned contract execution plan to ensure that expectations, roles, and responsibilities are clear in the transition to the contract management phase <br />
 +
 
 +
'''(2) DETERMINING THE CONTRACT MANAGEMENT APPROACH'''<br />
 +
 
 +
To determine the contract management approach, the contract management plan formation should be based on the assessment of key issues such as:
 +
* Contract value;<br />
 +
 
 +
* Contract complexity;<br />
 +
* Scale of risk and potential for risk mitigation through a sound contract management practice;<br />
 +
 
 +
* Importance of the contract;<br />
 +
 
 +
* Potential benefits and increased value available through contract management practice;<br />
 +
 
 +
'''(3) IDENTIFYING AND MANAGING RISK<br />'''
 +
 
 +
To ensure an effective contract planning, it is necessary to undertake a risk assessment to consider possible issues that might arise.<br />
 +
 
  
  
Line 148: Line 163:
 
REFERENCES:
 
REFERENCES:
 
<br />
 
<br />
[https://www.cips.org/documents/CIPS_KI_Contract%20Management%20Guidev2.pdf 1..2..7 https://www.cips.org/documents/CIPS_KI_Contract%20Management%20Guidev2.pdf]
+
[https://www.cips.org/documents/CIPS_KI_Contract%20Management%20Guidev2.pdf 1..2.. https://www.cips.org/documents/CIPS_KI_Contract%20Management%20Guidev2.pdf]
 
<br />
 
<br />
 
[http://www.coreworx.com/effective-contract-management-in-engineering-and-construction-projects-pre-award-to-post-award/ 3 http://www.coreworx.com/effective-contract-management-in-engineering-and-construction-projects-pre-award-to-post-award/]
 
[http://www.coreworx.com/effective-contract-management-in-engineering-and-construction-projects-pre-award-to-post-award/ 3 http://www.coreworx.com/effective-contract-management-in-engineering-and-construction-projects-pre-award-to-post-award/]
 
<br />
 
<br />
[https://www.scribd.com/document/196148989/Contract-Management-Guidelines 4 https://www.scribd.com/document/196148989/Contract-Management-Guidelines]
+
[https://www.scribd.com/document/196148989/Contract-Management-Guidelines 4..7 https://www.scribd.com/document/196148989/Contract-Management-Guidelines]
 
<br />
 
<br />
 
[http://fidic.org/sites/default/files/FIDIC_Suite_of_Contracts_0.pdf 5 http://fidic.org/sites/default/files/FIDIC_Suite_of_Contracts_0.pdf]
 
[http://fidic.org/sites/default/files/FIDIC_Suite_of_Contracts_0.pdf 5 http://fidic.org/sites/default/files/FIDIC_Suite_of_Contracts_0.pdf]
 
<br />
 
<br />
 
[http://www.metrocorpcounsel.com/articles/23582/business-integrity%E2%80%99s-2013-contract-management-survey-reveals-big-opportunities-saving 6 http://www.metrocorpcounsel.com/articles/23582/business-integrity%E2%80%99s-2013-contract-management-survey-reveals-big-opportunities-saving]
 
[http://www.metrocorpcounsel.com/articles/23582/business-integrity%E2%80%99s-2013-contract-management-survey-reveals-big-opportunities-saving 6 http://www.metrocorpcounsel.com/articles/23582/business-integrity%E2%80%99s-2013-contract-management-survey-reveals-big-opportunities-saving]

Revision as of 18:56, 20 September 2017


Contract plays a vital role in project management, business strategies, and relationships. It is the foundation of value for the business. Organizations both in public and private are looking for efficient performance at a reduced cost. [1] They are now realizing the importance of contract management in delivering a successful project. Effective contract management can make or break organization's vision, strategy, and its reputation.

All over the world projects are losing billions of monies due to poor contract management. The factor affecting poor contract management can be attributed to many elements such as the lack of knowledge with regards to proper contract administration, the impact of globalization creating a thicker volume of the document, strict government rules and legislation, technological innovation like BIM, and speed of change in contracting norm.

The significant impact of contractual issues affecting the overall performance of an organization leads to a realization that proper contract management guidance and administration is necessary to ensure minimal contractual risk, claim dispute and eliminate the possibility of arbitration cases.

In this article, the approaches and guidelines for Contract Management and Administration for pre-award (tender stage) and post-award (project execution stage) activities will be elaborated and discussed. The article will be divided into two sections. Section 1 includes the contract management principles such as the definition of contract, the contract management and administration definition and value measurement, the benefits from good contract management, contract management lifecycle and its processes, this is to give the readers an overview of what is contract management. Section 2 is the contract management guidelines for pre-award and post-award used to successfully implement the contract. _______________________________________________________________________________________________________________________________________________

SECTION I - CONTRACT MANAGEMENT PRINCIPLES
__________________________________________________________________________________________________________________________________________________

1.1 WHAT IS A CONTRACT?

A contract is a legal document stating the obligations between two or more parties. The contract documents usually outline the principles of offer, acceptance, and consideration, it also defines the terms of payment, the principles of negotiation, the scope of work and the expected level of service.


1.2 WHAT IS A CONTRACT MANAGEMENT AND ADMINISTRATION

Contract Management and Administration is the process of managing the contracts between the company and the vendors/partners. It involves decision-making and timely flow of information to achieve project goal in conformity with the contract documents. Moreover, effective contract management can be measured if;[2]

1 The arrangements for service delivery continue to be satisfactory to both customer and supplier;

2 Expected business benefits and value for money are being delivered;

3 The supplier is being cooperative and responsive;

4 All parties know their obligation in the contract;

5 There are no disputes;

6 There are no surprises;

7 The contract is fully compliant and satisfied both legislative and requirements.


1.3 CONTRACT MANAGEMENT PROCESSES


Contract management Processes.JPG
Figure 1: Pre and Post Award Activities[3]


1.4 ORGANIZATIONAL REQUIREMENTS FOR EFFECTIVE CONTRACT MANAGEMENT

To ensure efficiency in contract management. It is important for the organization to consider people skills and competencies. The type and level of resources required for contract management will vary for different types of contracts. Different levels of skills and competencies will be required for different types of contracts. Some will require the establishment of a contract management team while others will be managed by a single person.[4]

To carry out the contract management activities efficiently. The contract managers and other commercial team members must have appropriate skills and competencies to understand the task at hand in connection with the types of contracts they are dealing with. In addition, senior management should also provide leadership to ensure commitment to improvement.


1.5 TYPES OF FIDIC FORM OF CONSTRUCTION CONTRACTS

Some of the most common types of construction contracts used in the construction industry are the following:[5]

FIDIC FORM OF CONTRACTS.JPG
Figure 2.0 Fidic form of contracts

1 Green Book - Short Form of Contract, First Edition 1999

The Short Form of Contract is recommended for engineering and building work of relatively small capital value. The Guidance Notes for the Green Book recommended that generally it should not be used on projects with a contract value greater than US$500,000.It is a flexible document containing all the essential administrative and commercial arrangements. The contents of contract book: (a) Agreement (b) General Conditions (c) Rules for Adjudication (d) Notes for Guidance.

2 Red Book - Conditions of Contract for Construction For Building and Engineering works designed by the Employer First Edition 1999

The Red Book provides conditions of contract for construction works where the design is carried out by the Employer. The Red Book is intended for use on projects where the employer carries out the design but it also allows for some elements of the project to be Contractor designed. Payments are normally determined by measurement and applying the rates and prices from the bill of quantities. There is an option for payment to be on the basis of a lump sum. The contents of contract book: (a) General Conditions (b) Guidance for the Preparation of the Particular Conditions (c) Forms of Tender and Contract Agreement (d) Dispute Adjudication Agreement.

3 Red Book Multilateral Development Bank (MDB) edition- Conditions of Contract for Construction For Building and Engineering works designed by the Employer (MDB Edition 2005)

The FIDIC MDB edition of the Red Book simplifies the use of the FIDIC contract for the MDBs, their borrowers and others involved with project procurement, such as consulting engineers, contractors, and contract lawyers. As part of their standard bidding documents, the Multilateral Development Banks (MDBs) have for a number of years required their borrowers or aid recipients to adopt the FIDIC Conditions of Contract. The contents of the contract book: (a) General Conditions (b) Guidance for the Preparation of the Particular Conditions (c) Forms of Tender and Contract Agreement (d) Dispute Adjudication Agreement.

4 Yellow Book - Conditions of Contract for Plant and Design-Build For electrical and mechanical plant, and for building works, designed by the Contractor First Edition 1999

The Yellow Book provides conditions of contract for construction works where the design is carried out by the Contractor. It is applicable to the provision of electrical and/or mechanical plant, and for the design and execution of building or engineering works. Under the usual arrangements for this type of contract, the Contractor designs and provides the works in accordance with the Employer’s requirements which may include any combination of civil, mechanical, electrical and/or construction works. The contents of the contract book: (a) General Conditions (b) Guidance for the Preparation of the Particular Conditions (c) Forms of Tender and Contract Agreement (d) Dispute Adjudication Agreement.

5 Orange Book - Conditions of Contract for Design-Build and Turnkey First Edition 1995

The Orange Book is intended for use on turnkey contracts, under which the Employer's requirements usually include the provision of a fully-equipped facility, ready for operation at the turn of a key. The exact Employer requirements will need to be fully detailed to describe the design, construction, fixtures, fittings, and equipment required to be provided by the Contractor’s design. The contents of contract book : (a) General Conditions (b) Guidance for the Preparation of the Particular Conditions (c) Forms of Tender and Agreement.

6 Silver Book - Conditions of Contract for EPC/Turnkey Projects First Edition 1999

The Silver Book is suitable for use on process, power and private-infrastructure projects where a Contractor is to take on full responsibility for the design and execution of a project. Risks for completion to time, cost and quality is transferred to the Contractor and so the Silver Book is only suitable for use with experienced Contractors familiar with sophisticated risk management techniques. The Silver Book provides conditions relating to ‘Tests on Completion’ and Taking Over only takes place after successful completion of the tests. Such provisions are important for EPC/Turnkey projects where the purpose of the contract is to provide the Employer with a working facility. The contents of contract book: (a) General Conditions (b) Guidance for the Preparation of the Particular Conditions (c) Forms of Tender and Contract Agreement (d) Dispute Adjudication Agreement.

7 DBO Contract - Conditions of Contract for Design, Build and Operate Projects First Edition 2008

The DBO contract adopts a “green-field” DBO scenario with a 20 year operation period and a single contract awarded to a single contracting entity (which will almost certainly be a consortium or joint venture) to optimise the coordination of innovation, quality, and performance, rather than award separate contracts for design-build and for operation.The document is recommended for general use where tenders are invited on an international basis. The contents of contract book: (a) General Conditions (b) Particular Conditions (c) Sample Forms.


1.6 BENEFITS OF GOOD CONTRACT MANAGEMENT

Benefits of good contract management.JPG
Figure 3.0 Image from Business Integrity's 2013 Contract Management Survey.[6]


________________________________________________________________________________________________________________________________________________________________________

SECTION II - GUIDELINES IN CONTRACT MANAGEMENT AND ADMINISTRATION PRACTICES _________________________________________________________________________________________________________________________________________________________________________
The key to successful post award contract implementation is to ensure that the pre-award activities (tender) are properly carried out. It is important that contracts are actively monitor throughout its lifecycle to help ensure supplier performance is satisfactory, stakeholders are well informed and all contract requirements are being meet.


2.1 PRE-AWARD CONTRACT MANAGEMENT PRACTICES

2.1.1 Planning for effective contract management
There are 3 key stages to consider in planning for effective contract management during the pre-award stage.


Planning for effective contract management.JPG
Figure 4.0 image from PMMS Contract Management Guidelines [7]

(1) CONTRACT ESTABLISHMENT
Some of the key issues that will determine the long-term success or failure of contract management include:

  • Planning – to address issues such as what is the type of specifications involve, how many numbers of contractors needed, how long is the contract duration and the role of sub-contractors should be considered in procurement planning.
  • Specification development - A Clear specifications that include measurable KPIs to reduce the risk of contract disputes, cost blow-outs and poor outcomes
  • Contract Transition Planning - Well planned contract execution plan to ensure that expectations, roles, and responsibilities are clear in the transition to the contract management phase

(2) DETERMINING THE CONTRACT MANAGEMENT APPROACH

To determine the contract management approach, the contract management plan formation should be based on the assessment of key issues such as:

  • Contract value;
  • Contract complexity;
  • Scale of risk and potential for risk mitigation through a sound contract management practice;
  • Importance of the contract;
  • Potential benefits and increased value available through contract management practice;

(3) IDENTIFYING AND MANAGING RISK

To ensure an effective contract planning, it is necessary to undertake a risk assessment to consider possible issues that might arise.



2.2 POST-AWARD CONTRACT MANAGEMENT PRACTICES









________________________________________________________________________________________________________________________________________________________________________
REFERENCES:
1..2.. https://www.cips.org/documents/CIPS_KI_Contract%20Management%20Guidev2.pdf
3 http://www.coreworx.com/effective-contract-management-in-engineering-and-construction-projects-pre-award-to-post-award/
4..7 https://www.scribd.com/document/196148989/Contract-Management-Guidelines
5 http://fidic.org/sites/default/files/FIDIC_Suite_of_Contracts_0.pdf
6 http://www.metrocorpcounsel.com/articles/23582/business-integrity%E2%80%99s-2013-contract-management-survey-reveals-big-opportunities-saving


Cite error: <ref> tags exist, but no <references/> tag was found