Stakeholders from a dynamic and network perspective

From apppm
(Difference between revisions)
Jump to: navigation, search
(Betweenness Centrality)
(Betweenness Centrality)
Line 54: Line 54:
  
 
=== Betweenness Centrality ===
 
=== Betweenness Centrality ===
 +
[[File:BN1.PNG|350px | thumb| |The stakeholder in the center of the network, can act as a bridge between the two groups of stakeholders]]
 +
 
* Bruge disse til at promote projektet
 
* Bruge disse til at promote projektet
  
  
  
[[File:BN1.PNG|200px | frame| |The stakeholder in the center of the network, can act as a bridge between the two groups of stakeholders]]
 
  
 
<div style="clear:both">&nbsp;</div>
 
<div style="clear:both">&nbsp;</div>

Revision as of 14:29, 27 November 2014

Contents

Abstract

Conducting a traditional stakeholder analysis gives the investigator a current state of the analysed scenario. This type of analysis works as a macro analysis, not only framed to contain a specific area of investigation, but takes into account all the different kind of actors (person, group or organisation) that currently has an interest and that can affect, or be affected by, the give action/project.

This article takes the perspective that conducting a stakeholder analysis has to be an iterative process, due to the fact as when a project progress the power and interest of the mapped stakeholders can change drastically. This needs to be taken into account, when “managing” these stakeholders. Therefore taken a more dynamically approach towards stakeholder analyses will help the investigator(s) conducting them.

Typically, when conducting stakeholder analyses mainly two types of dimensions are considered, when mapping them; these could be power vs. interest or Interest vs. Influence. Inspired by analytic tools such as bubble diagrams for project prioritisation and network theory for social networks, which both assign values to the actual nodes (stakeholders) used in the diagram. This could be relevant for the investigator to able to look into these, by adding values himself or through questionnaires. Suggested “node values” could be “knowledge of the project”, “seniority”, “involvement of the project” and their own opinion regarding their “attitude towards the project”.

Applying network theory for mapping stakeholders by e.g. how they communicate, a “shadow network” can emerge. This can represent the informal structure of the organisation, where the project is being implemented. Looking into shadow networks, multiple applications can emerge. One application could be for when influencing different, but the right, stakeholders. It can be more effective by persuading an already enforcer of the project and then use that stakeholder for affecting other key stakeholders, which potential support is needed. Selecting the right enforcer could be analysed from the way stakeholders are interlinked and through the “amount” of communication between them. This can be done in practise by assigning a specific value to the communication between the stakeholders, which then can be illustrated through the edges between them.

Taking into account for creating a more dynamic tool, regarding stakeholder analyses, shadow networks can also be used for predicting, how future scenarios could look like. If crucial stakeholders primarily are surrounded by stakeholders that are negative towards the project – actions needs to be taken – although that specific stakeholder’s attitude towards the project currently is positive.

As all models are not universal, this approach would also have restrictions, where one crucial disadvantage is that stakeholders from the environment could potentially be less represented in the analysis, compared to more internal stakeholders.

Overview of a Stakeholder Analysis today

Conducting a stakeholder analysis is done with the purpose of getting an overview of different actors that currently has an interest and that can affect, or be affected by, a give action/project. This will be useful during project, due to the fact it will be possible to get an understanding on how much attention different stakeholders should get. When using the term “stakeholder”, it covers a broad range of actors; such as individuals, groups and organisations. A stakeholder analysis is what can be characterised as a macro analysis because it not only takes into account for the organisation or a specific area of investigation, but also takes into account for the external environment. From this the analysis can be broaden to take multiple levels into consideration, which includes local, regional, national and even international [2.340]. This will affect the researcher and how this person will have to collect the necessary information.

Conducting a “local stakeholder analysis” usually means that the stakeholders are reachable for individual interviews and otherwise the analysis has to use other kind of existing documentation, such as e.g. reports, if interviews are not a possibility.

The purpose for conducting this kind of analysis is to get a more in depth understanding about the involved stakeholders and their interest, intentions, agendas and their influence or potential resources the project could benefit/dis-benefit from [1, p.241]. From this it can be relevant for distinguish between stakeholders by categorising them as primary (crucial for the survival of the project) and secondary (important, but not essential for the survival) stakeholders [1, p.423].


Current practices, when conducting a Stakeholder Analysis

Multiple kinds of stakeholder analyses can be found in the literature [2][3], depending on what kind of aspects is considered most important. Usually the models all have in common that they are grid based, usually in a two dimensional matrix tables, where this e.g. can represent power vs. Interest, see figure XYZ. Colleting the necessary information can be divided into two subgroups; primary and secondary data gathering [2, p.341].

Primary data gathering cover interactions between stakeholders and researcher, which includes different kind of interviews including semi-structured, structured etc., but also the use of focus groups. The secondary data gathering is more data oriented e.g. reports, internal documentation and is usually discovered during the semi-structured interviews [2]. Current practices concerning stakeholder analyses are primarily based on primary data gathering [4, p.134], where it is investigated “who is important” and “who will be affected” [4,p.146]. From this perspective it can be concluded that this form of a stakeholder analysis, is based on more qualitatively data.

What is missing in the current practices of a stakeholder analysis

Even though a lot of the literature states, when conducting a stakeholder analysis it is crucial it is done from a dynamic and iterative perspective [REF], very little actually states how to do this in practice. This reason for this is due to the fact that as a project progress existing stakeholders may change attitude towards the project and also, new stakeholders may emerge, which needs to be taken into consideration. From this a stakeholder analysis has to be a more dynamic tool and taking into account how the stakeholders actually are interconnected.

Knowing how stakeholders are interconnected can also help researcher to better forecast on the future, regarding stakeholders’ potential behaviour. Therefore current stakeholder analyses needs to be expanded to take into account for more quantitative data gathering, through e.g. questionnaires [4,p.134].

Applying Social Network Theory aspects into a stakeholder analysis

As mentioned earlier, a stakeholder analysis is primarily based on a qualitatively approach for how to identify relevant stakeholders from both a present and a future perspective. During projects multiple stakeholders can at some point show some sort of interest, which either can be positive or negative. This is crucial for project managers, having an idea of for what to anticipate and then how to accommodate this before it is too late. Applying social network theory (SNT) into a stakeholder analysis implies that not only are the individual stakeholders important, but also the way they are interacting, is also important.

The reason why the interaction of stakeholders are relevant for investigating is due to the fact that stakeholders with strong ties are more likely to being able to influence each other [6.p.503]. This kind of influence can be either positive or negative because it can indirectly also illustrate trust, respect, communication, support etc., which all can have crucial impact of the success of getting the maximal benefit of the identified stakeholders.


Applying Social Network Theory

In SNT primarily two types of networks can be of great importance for being able to detect. These falls into the categories [5.p65):

  • Cohesive Networks
  • Bridging Networks

.........................

  • Spørgeskemaer
  • Benefits of numerous different mathematical algoritms


Size of nodes

Betweenness Centrality

The stakeholder in the center of the network, can act as a bridge between the two groups of stakeholders
  • Bruge disse til at promote projektet



 

Degree Centrality

  • Bruge disse til at fange fencesitters
  • Even low powered stakeholders can actually have a strong "informal power", due to its strong interaction with other stakeholders.
  • Indsæt figur

Eigenvector Centrality

  • Used for mapping power within a network.