Muda, Mura and Muri

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 68: Line 68:
  
  
==Limitations==
+
==Limitations and challenges==
 
“If you are going to do Toyota Production System, you must do it all the way. You also need to change the way you think. You need to change how you look at things.”—Taiichi Ohno. As stated by the creator of the Toyota Production System, eliminating the 3M's requires a thorough transformation. This is therefore incredibly demanding and especially for a medium or large-scale organisation, as you will need to innovate and change the entire mindset of the business.  Teams are usually able to change direction and mentality in a much more rapid order, and is therefore more capable of implementing the Toyota Production System approach more immediately, eliminating the Muda, Mura and Muri waste much quicker. A possible method for larger organisations to achieve less waste and elimination of the 3M's is therefore to begin with focusing on reducing the 3M's within the teams and their respective projects. Doing this may also lead to shape the practices of the whole of the organisation.
 
“If you are going to do Toyota Production System, you must do it all the way. You also need to change the way you think. You need to change how you look at things.”—Taiichi Ohno. As stated by the creator of the Toyota Production System, eliminating the 3M's requires a thorough transformation. This is therefore incredibly demanding and especially for a medium or large-scale organisation, as you will need to innovate and change the entire mindset of the business.  Teams are usually able to change direction and mentality in a much more rapid order, and is therefore more capable of implementing the Toyota Production System approach more immediately, eliminating the Muda, Mura and Muri waste much quicker. A possible method for larger organisations to achieve less waste and elimination of the 3M's is therefore to begin with focusing on reducing the 3M's within the teams and their respective projects. Doing this may also lead to shape the practices of the whole of the organisation.
  

Revision as of 13:50, 29 September 2017

Contents

Introduction

Muda, Mura and Muri is a concept originally developed by the car manufacturing company Toyota, and is often referred to as the 3 M's of waste in lean manufacturing. The three M's collectively describe the practices companies can eliminate to reduce the non-value adding utilisation of resources. The concept aims not for companies to work better but to get rid off practices that does not add any type of value.

These three waste types can typically be found in both manufacturing and office processes and may be used in lean project management. It is therefore also very applicable to projects and project management. As various projects are often challenged with multiple and diverse obstacles, reducing the 3 M's may be a helpful aid when trying to reduce project failure. The concept can be utilised and applied in the planning and execution stages to improve the performance of the project.

Lean project management is the adoption of lean concepts put into a project management circumstance, with a primary aim for a project to deliver more value with less waste. This is essentially done with removal of bottlenecks during the production process which can then expedite growth and boost productivity. The lean management principles mostly stems from the Toyota Production System (TPS) and their idea of lean from 1990, and automaker company Toyota has been renowned for the way it grew from a small company to a global brand with a lean perspective [1] The main goal of the elimination of Muda, Mura and Muri is to integrate light-weight processes and frameworks that can be applied and utilised with limited need for documentation and added efforts.

Muda

Muda is the Japanese word for "waste" and relates to any activity or practice that does not in any way produce value for the customer and generate loss of resources, time and money [2]. There are, as explained by the so-called "father of the Toyota production system", Taiichi Ohno, 7 categories of waste. A common mistake for companies is to focus only on reducing or eliminating the Muda waste, thinking that it represents and covers all types of excess waste, but simply eliminating Muda will not be of help to the company without finding the reason for the waste, which will usually correlate with the two other wasteful practices; Mura and Muri.

The eight categories of waste:

- Transportation (relates to the movement of products between locations and operations)

- Inventory (depicts the stock of finished goods, raw material and the Work in Progress (WIP) that a business obtain)

- Motion (details the physical activity of a machine or individual whilst comporting an action)

- Waiting (the operation of waiting for a worker or machine to finish, a delivery to arrive etc.)

- Over-processing (operations produced beyond what the customer call for)

- Over-production (producing higher number of products than what is needed from customers)

- Defects and Rework (product rejection and altering needs within the business operations)

An eight category is sometimes also added, disclosing the loss of human potential to create value whilst simultaneously producing waste. [3]

Different kinds of waste in lean manufacturing.png

Mura

Mura presents the wastes of unevenness or irregularity and often occurs in linkage with inconsistency in customer demand, cycle times variation and an uneven work pace. It is most often used in relation to material flow, but can also be seen throughout a company's operations and day-to-day activities. The waste of unevenness is usually what creates many forms of the 7 categories of Muda. The Mura waste can often be eliminated by creating and encouraging openness in the supply chain, and is referred to as "levelling" and is often perceived as a counter measure to Mura.

The Mura waste would for example appear in a long-winded implementation project of a new IT system. In the initiation process, work is usually slow and planning, documentation and preparation tasks take longer than expected. After a while, time pressure is increased and work pace escalates, however, the anticipated date of completion is drawing near and the team works overtime to try to finish their tasks in time for the due. Suddenly, defects are discovered. Now the team needs to work even harder to attempt to correct the issues, but there is not enough time. This waterfall example illustrates how the waste of unevenness results in additional Muda wastes and affects the company. Resources and finances are needed to complete the project in time, the client is displeased and worried for the new finish date, the team is overworked and unmotivated.

Muri

Depicts the waste of overburden by causing unnecessary stress and strain to employees or equipment. Of course, some strain is to be expected within a workplace but within set and safe regulations [4]. Muri can transpire as a result of lack of training, poorly developed workplaces, lack of maintenance, limited focus on safety and non-successful measures of performance. Muri is usually a result of the unevenness waste, Mura, but it also often commences from various organisational matters, for example procedural and structural bottlenecks.

Application

The three M's in lean manufacturing, Muda, Mura and Muri are often analogous and to eliminate one often means that the others is eliminated simultaneously. By applying various tools such as Kanban, Just in time (JIT) etc.as it can strengthen production stream, assisting to reduce Mura, the waste of unevenness. Companies including Toyota, Harley Davidson and Dell utilise the JIT philosophy. For example Dell is therefore able to offer remarkably short lead times to their customers by making their suppliers carry inventory instead of doing it themselves, whilst also demanding short lead time on receiving components enabling Dell to quickly assembly products and deliver to end customer [4].The Trusted Platform Value (TPV) and the 5S methodology are frameworks that can be applied to eliminate the waste of overburden, Muri.

There is no ultimate approach or order on how to reduce the 3 M's, however The Danish Lean Forum has published a recommended elimination process:

1. Reduce Muda To be able to overcome the three wastes, Mura should be reduced to create more surplus for the Lean practices. By trying to identify the Muda wastes it is also likely that the two other M's will more easily appear.

2. Reduce Mura To reduce the unevenness waste, companies and organisations should aim for a healthy and strong alignment of activities and processes, as this will decrease delay and day-to-day waste time. this could for instance be done through Just-in-time systems, which are based on limited inventory, aiming to maximise productivity by reducing storage overhead.

3. Reduce Muri This should be done through competence management and weekly planning meetings. By ensuring follow-up meetings on the planning the process could also be more heavily linked to Kaizen, referring to the continuous improvement approach. Making use of self-organizing teams is also a useful way to ensure reduced burden to employees on project level, as the employees knows best how to coordinate and regulate their work in order to amend and improve it.

Aiming for standardised work is also a possible method, setting pre-decided task time, repeatable process steps and work flows. By making use of the standardised work method organisations have previously proven, not only to reduce Muri but also increase employee morale, quality and productivity and reduce the overall costs [5]

Advantages

Reducing the three M wastes can enable the company to focus on "smart work" and not "hard work". This may facilitate a more inspired and invested work environment where the employees are more involved and have higher concern for the success of their respective project and the company as a whole. Furthermore, as elimination of the 3 M's requires clear strategic plans for the future of the company, the employees and managers will have a more clear-cut and defined understanding of the company's prospects.

As reduction of the Muri waste focuses on eliminating overburden, the methodology promotes increased work place safety, hopefully resulting in fewer accidents and mishaps. This will also increase employee satisfaction and boost productivity.

Elimination of the three wastes requires continuous work and consideration, which may enable the company to keep focused and the employees productive and on track.

Furthermore, by curtailing the communication void between management and employees, chances are high that project involvement and productivity will rise.


Limitations and challenges

“If you are going to do Toyota Production System, you must do it all the way. You also need to change the way you think. You need to change how you look at things.”—Taiichi Ohno. As stated by the creator of the Toyota Production System, eliminating the 3M's requires a thorough transformation. This is therefore incredibly demanding and especially for a medium or large-scale organisation, as you will need to innovate and change the entire mindset of the business. Teams are usually able to change direction and mentality in a much more rapid order, and is therefore more capable of implementing the Toyota Production System approach more immediately, eliminating the Muda, Mura and Muri waste much quicker. A possible method for larger organisations to achieve less waste and elimination of the 3M's is therefore to begin with focusing on reducing the 3M's within the teams and their respective projects. Doing this may also lead to shape the practices of the whole of the organisation.

Many of the companies that have tried to apply the lean philosophy and eliminate the three waste types have been able to adhere to the strict methodology. Some of the main limitations with the Muda, Mura and Muri methodology include:

Supplier management: When aiming to cut non-value adding practices, companies will usually become more dependent on cooperating with reliable and professional suppliers. This can be problematic as there may be an increased pressure on ensuring and maintaining satisfying relationships with supplier, also as the situation of the supplier may have greater influence on the company as a result. For instance, for a lean manufacturing project to work suppliers must agree to produce components in smaller batches and also deliver frequently to assembly plants. If suppliers do not agree to do this the company will hold more inventory, increase the carrying costs and reduce capability to enhance their quality and productivity via shorter production runs and better process sequences [6].

Dependency: Reducing the three M wastes will put more responsibility and dependency on suppliers, management and employees. Not only is it difficult to inspire all individuals within the company to follow the change towards the lean philosophy, but it may also prove challenging to ensure that everyone involved keeps following the new practice to and stay united. If some does not follow the methodology there will appear a weak link, hence productivity will decrease. [7].

Morale: It may take long for results to appear after reducing the waste types, during this process company and employee morale may weaken. Also, if the implementation of the 3M's methodology happens during a project, that respective project may suffer. It is vital that managers stay consistent in this procedure to ensure a steady and dependable environment during the application of the Muda, Mura and Muri methodology.


Annotated bibliography

[1]Dansk Lean Forum, 2015. Muda, Mura and Muri, Hvem er de? https://leanforum.wordpress.com/2015/08/20/lean-muda-mura-muri/

Jiwat (2016). 3MUs (Muda, Mura, Muri): A lean Management tool with potentially ‘Big benefits’ for Project Management - IPMA Blog - Learn more about project management. [online] IPMA Blog - Learn more about project management. Available at: http://blog.ipma.world/3mus-muda-mura-muri-lean-management-tool-potentially-big-benefits-project-management/ [Accessed 19 Sep. 2017].


References

  1. [https://leanforum.wordpress.com/2015/08/20/lean-muda-mura-muri/] Liker, J (2004)
  2. ["Womack, J.(2006). From Lean Tools to Lean Management
  3. [http://agileknowhow.com/2016/07/14/getting-rid-3-ms-agile-tackles-problem-muda-mura-muri/] Mysliwiec, P (2016)
  4. 4.0 4.1 [http://missiontps.blogspot.dk/p/3ms.html] Kumar, M (2013)
  5. [https://bobsleanlearning.wordpress.com/2010/01/14/muda/] Hobbard, B (2010)
  6. [http://sloanreview.mit.edu/article/the-limits-of-lean/] Cusumano, M (1994)
  7. [https://www.linkedin.com/pulse/advantages-disadvantages-lean-project-delivery-khan] Khan, M (2016)
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox