Gantt chart and Scheduling techniques: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 6: | Line 6: | ||
A plan can only show the practicability of accomplishing its objectives when the actions and activities in the plan, are put together in a schedule that illustrates when each action or activity will be carried out. | A plan can only show the practicability of accomplishing its objectives when the actions and activities in the plan, are put together in a schedule that illustrates when each action or activity will be carried out. | ||
Today there is many different methods and approaches to scheduling. It can either be by computer-based planning tools or done manually. | Today there is many different methods and approaches to scheduling. It can either be by computer-based planning tools or done manually <ref>E. Miller, ''The Sun'', (New York: Academic Press, 2005), 23-5.</ref>. | ||
===Gantt chart=== | ===Gantt chart=== | ||
| Line 19: | Line 19: | ||
==The connection== | ==The connection== | ||
==References== | |||
<references /> | |||
Revision as of 16:03, 19 February 2019
Abstract
Here you will write your draft for your wiki article, including at least 1 reference.
Scheduling
A plan can only show the practicability of accomplishing its objectives when the actions and activities in the plan, are put together in a schedule that illustrates when each action or activity will be carried out.
Today there is many different methods and approaches to scheduling. It can either be by computer-based planning tools or done manually [1].
Gantt chart
| Checklist when creating a Gantt chart | |||||
|---|---|---|---|---|---|
| 1. 2. | |||||
Constructing a Network Diagram
The connection
References
- ↑ E. Miller, The Sun, (New York: Academic Press, 2005), 23-5.