Adaptive Project Management

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
 
==Abstract==
 
==Abstract==
Adaptive project management (APM) is a method applied in project management. The method adapts and changes in response to requests from the stakeholder. The process in the method allows the manager to improve decisions and practices during the project life cycle based on experiences from previous results obtained during the project. The method accommodates uncertainties where the process is an adaptive structured and systematic iterative process <ref> name= ''M.Mrsic '' >'' M. Mrsic (2017) “Adaptive Project Management” ActiveCollab. Link: https://activecollab.com/blog/project-management/adaptive-project-management'' </ref>. The method derives from agile project management, however, in adaptive project management, the methodology allows the team to respond to unexpected challenges and adapt new improved methods towards reaching the project goal <ref> name= ''Think Thyme'' >'' Alex (2018) “Adaptive Project Framework Methodology” ThinkThyme. Link: https://thinkthyme.com/project-management/adaptive-project-framework-methodology'' </ref>.  
+
Adaptive project management (APM) is a method applied in project management. The method adapt and changes in response to requests from the stakeholder. The process in the method allows the manager to improve decisions and practices during the project life cycle based on experiences from previous results obtained during the project. The method accommodates uncertainties where the process is an adaptive structured and systematic iterative process <ref> name= ''M.Mrsic'' > ''M. Mrsic (2017) “Adaptive Project Management” ActiveCollab. Link: https://activecollab.com/blog/project-management/adaptive-project-management'' </ref>. The method derives from agile project management, however, in APM the methodology allows the team to respond to unexpected challenges and adapt new improved methods towards reaching the project goal <ref> name= ''ThinkThyme'' >'' Alex (2018) “Adaptive Project Framework Methodology” ThinkThyme. Link: https://thinkthyme.com/project-management/adaptive-project-framework-methodology'' </ref>.  
 
The method can be implemented in nearly all project types with a defined goal but an undecided process to reach the goal. However, one exception is in construction project, where little flexibility is accepted during the project lifecycle. An example of application of the method is during restoration of coastal ecosystem projects <ref> name= ''article'' >'' R. M. Thom (2000) “Adaptive management of coastal ecosystem restoration projects” 15(3-4) p.365-372. Ecological Engineering'' </ref>.
 
The method can be implemented in nearly all project types with a defined goal but an undecided process to reach the goal. However, one exception is in construction project, where little flexibility is accepted during the project lifecycle. An example of application of the method is during restoration of coastal ecosystem projects <ref> name= ''article'' >'' R. M. Thom (2000) “Adaptive management of coastal ecosystem restoration projects” 15(3-4) p.365-372. Ecological Engineering'' </ref>.
 
==History==
 
==History==
The method was introduced in 2008 by Robert K. Wysocki <ref name= ''Think Thyme''>. Often, most project management methods include static strategies, well-defined work, and people working on projects directed by the project manager <ref name=''Lucidchart''>''Lucidchart (2018) "What is adaptive project framework" Blog. link: https://www.lucidchart.com/blog/what-is-adaptive-project-framework'' </ref>. However, strategy is dynamic and unpredictable, and therefore project may fail if the project approach do not deal with uncertainties that exits towards the way to reaching the goal of the project. The APM approach can be compared to the evolution in biology, where favorable traits are adapted in time, and correspondingly, in the adaptive management approach the project manager can adapt new more favorable decisions during the project life cycle to reach the project goal. A change in strategy is accepted as more knowledge, experience and information becomes available, which will be adapted in the strategy < name= ''Think Thyme'' >.  The APM method can be viewed as a response to the complexity of projects, where the two most common failure reasons for complex projects are because of re-prioritization and change in strategy <ref name=''Lucidchart''>.
+
The method was introduced in 2008 by Robert K. Wysocki <ref name= ''ThinkThyme'' />. Often, most project management methods include a static strategy, well-defined work, and people working on projects directed by the project manager <ref name=''Lucidchart''>''Lucidchart (2018) "What is adaptive project framework" Blog. link: https://www.lucidchart.com/blog/what-is-adaptive-project-framework'' </ref>. However, a strategy is dynamic and unpredictable, and therefore project may fail if the project approach do not deal with uncertainties that exits towards the way to reaching the goal of the project. The APM approach can be compared to the evolution in biology, where favorable traits are adapted in time, and correspondingly, in the adaptive management approach the project manager can adapt new more favorable decisions during the project life cycle to reach the project goal. A change in strategy is accepted as more knowledge, experience and information becomes available, which will be adapted in the strategy < ref name= ''Think Thyme'' />.  The APM method can be viewed as a response to the complexity of projects, where the two most common failure reasons for complex projects are because of re-prioritization and change in strategy <ref name=''Lucidchart''>.
 
==Principles==
 
==Principles==
 
The key principles of the methodology are:
 
The key principles of the methodology are:

Revision as of 12:03, 5 March 2019

Abstract

Adaptive project management (APM) is a method applied in project management. The method adapt and changes in response to requests from the stakeholder. The process in the method allows the manager to improve decisions and practices during the project life cycle based on experiences from previous results obtained during the project. The method accommodates uncertainties where the process is an adaptive structured and systematic iterative process [1]. The method derives from agile project management, however, in APM the methodology allows the team to respond to unexpected challenges and adapt new improved methods towards reaching the project goal [2]. The method can be implemented in nearly all project types with a defined goal but an undecided process to reach the goal. However, one exception is in construction project, where little flexibility is accepted during the project lifecycle. An example of application of the method is during restoration of coastal ecosystem projects [3].

History

The method was introduced in 2008 by Robert K. Wysocki Cite error: Invalid <ref> tag; refs with no content must have a name. Often, most project management methods include a static strategy, well-defined work, and people working on projects directed by the project manager [4]. However, a strategy is dynamic and unpredictable, and therefore project may fail if the project approach do not deal with uncertainties that exits towards the way to reaching the goal of the project. The APM approach can be compared to the evolution in biology, where favorable traits are adapted in time, and correspondingly, in the adaptive management approach the project manager can adapt new more favorable decisions during the project life cycle to reach the project goal. A change in strategy is accepted as more knowledge, experience and information becomes available, which will be adapted in the strategy < ref name= Think Thyme />. The APM method can be viewed as a response to the complexity of projects, where the two most common failure reasons for complex projects are because of re-prioritization and change in strategy Cite error: Closing </ref> missing for <ref> tag


Cite error: <ref> tags exist, but no <references/> tag was found