Planning Methods - 3 Levels of Project Planning
Line 28: | Line 28: | ||
<ref name="CPM" /> | <ref name="CPM" /> | ||
+ | <ref name="Con" /> | ||
==References== | ==References== | ||
<references> | <references> | ||
Line 37: | Line 38: | ||
<ref name="CPM">Slate, A. ''Critical Path Method: A Project Management Essential''. Wrike.com. Published 2018. Accessed February 19, 2021. [https://www.wrike.com/blog/critical-path-is-easy-as-123/"''Critical Path Method''"]</ref> | <ref name="CPM">Slate, A. ''Critical Path Method: A Project Management Essential''. Wrike.com. Published 2018. Accessed February 19, 2021. [https://www.wrike.com/blog/critical-path-is-easy-as-123/"''Critical Path Method''"]</ref> | ||
| | ||
+ | <ref name="Con">Mubarak, S. (2010). ''Construction project sheduling and control''. New jersey: Jhon wiley and sons. |
Revision as of 11:09, 19 February 2021
Developed by Jeyad M. Baig
Planning methods is a key feature in Project Management and helps to create an overview and structure in projects[1]. Planning gives the Project Manager control over the amount of time spent on activities, particularly to improve efficiency for a better project schedule. Depending on the specific tasks and their complexity, the planning can be done at 3 different levels: Network Planning, Gantt Chart and Cyclogram Planning.
The 3 project planning methods differentiate in the number of dimensions and represent a sequence of activities (1 dimensional), duration of activities (2 dimensional) and location of activities (3 dimensional). The goal of all 3 planning methods is to show a path from the beginning to the end of the project, but the difference lies in how the path is visualized and planned. The first two planning methods are part of the Critical Path Method (CPM) and the last planning method is Location-Based Scheduling (LBS).
The following article gives an insight into how the 3 Planning Methods benefits Project Management and focus on similarities and differences between the methods depending on the project.
Contents |
Background and purpose
Project Planning Methods
Critical Path Method (CPM)
CPM is one of the most common project management scheduling techniques used since it was introduced in the late 1950s[2].
Network Planning 1D
Gantt Chart 2D
Location-Based Scheduling (LBS)
Cyclogram Planning 3D
Application of the methods
Similarities
Differences
Annotated Bibliography
References
- ↑ Barron, M. & Barron, A., Watt A. 8. Overview of Project Planning. Opentextbc.ca. Published August 14, 2014. Accessed February 18, 2021."Overview of Project Planning"
- ↑ BYG·DTU, Andersson, N., & Christensen, K. (2007). Location-based Scheduling. Vurdering af LBS-metodens anvendelse i byggeprojekter. Technical University of Denmark (DTU). "Location-based Scheduling"
- ↑ Slate, A. Critical Path Method: A Project Management Essential. Wrike.com. Published 2018. Accessed February 19, 2021. "Critical Path Method"
- ↑ Mubarak, S. (2010). Construction project sheduling and control. New jersey: Jhon wiley and sons.