Kanban method

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 57: Line 57:
 
==== Measure and manage flow ====
 
==== Measure and manage flow ====
  
[[File:CDF.png|600px|thumb|Figure 3: Example of a CDF <ref name=Tipsographic> Tipsographic. (2020). How to Read a Cumulative Flow Diagram in Kanban. [https://www.tipsographic.com/kanban-cumulative-flow-diagram/]. Accessed February 20th.</ref>]]
+
[[File:CDF.png|600px|thumb|Figure 3: Example of a CDF, where the Kanban board categories are defined by different colours <ref name=Tipsographic> Tipsographic. (2020). How to Read a Cumulative Flow Diagram in Kanban. [https://www.tipsographic.com/kanban-cumulative-flow-diagram/]. Accessed February 20th.</ref>]]
  
 
The feature of measure and manage flow is a corrective step, where the team uses information based on measurements of the flow to improve it, which means that they are looking for ways to improve continuously. There needs to be a certain amount of willingness to maximize the flow and this means for the whole team, because it can help with unevenness, frustrations and decrease of lead times. When there is a maximization of flow the effectiveness of the Kanban implementation is high, therefore is it interesting to look into the effectiveness of the implementation. When measuring the effectiveness there is several Key Performance Indicators (KPI) that can be used, the three main flow metric indicators is: Cycle time, throughput and work-in-progress. A cumulative flow diagram (CDF) can be used to visualize exactly these three indicators if they are measured. The CDF is a great tool to look in to where problems derive from, so this can be managed, and in the end, create an even better flow.  
 
The feature of measure and manage flow is a corrective step, where the team uses information based on measurements of the flow to improve it, which means that they are looking for ways to improve continuously. There needs to be a certain amount of willingness to maximize the flow and this means for the whole team, because it can help with unevenness, frustrations and decrease of lead times. When there is a maximization of flow the effectiveness of the Kanban implementation is high, therefore is it interesting to look into the effectiveness of the implementation. When measuring the effectiveness there is several Key Performance Indicators (KPI) that can be used, the three main flow metric indicators is: Cycle time, throughput and work-in-progress. A cumulative flow diagram (CDF) can be used to visualize exactly these three indicators if they are measured. The CDF is a great tool to look in to where problems derive from, so this can be managed, and in the end, create an even better flow.  

Revision as of 13:20, 20 February 2022

Kanban can be referred to as either a method within process improvement or a visual method in Just-in-Time and Lean manufacturing, following article will be focusing on its uses in process improvement.

Figure 1: Example of a simple Kanban board [1]

The Kanban methodology originates from Japan and is therefore a Japanese word that can be translated to “signboard”. Kanban is a framework that is used in teams that is following the agile methodology, which has gained popularity throughout the software development industry, since the adaption by David Anderson back in 2010. To practice Kanban, it is essential to acquire a lean thinking mindset, which focuses on the improvement of processes and elimination of waste, called Muda in Japanese [2]. To understand more about Lean manufacturing see Lean in Project Management. When teams want to implement lean and a lean mindset, Kanban can work as a beneficial method to bring exactly this to the team, which is explained by David Anderson in following quote.


“The Kanban Method introduces a complex adaptive system that is intended to catalyze a Lean outcome within an organization. Complex adaptive systems have initial conditions and simple rules that are required in order to seed complex, adaptive, emergent behavior.” – David Anderson [3]


In general, Kanban helps project managers to keep an overview of their projects and the tasks involved in them, it also increases collaboration between the team members that is involved within the projects, mainly because visualization with the use of Kanban boards, creates project transparency. How exactly Kanban works will be the focus of this article with an overview of the historical development of this specific method, an elaboration on its uses in project management and its features will also be enlightened, where the final point of the article will define some of the limitations that is linked to the use of Kanban.

Contents

Historical State of the Art

In the Japanese Edo period, which spanned from the 17th to the middle of the 19th century, Japan experienced stability and economic growth throughout the country, after several decades of war and instability. Through this growth, local shops and street markets gained popularity and to attract eventual customers the shops started using different signs and boards to attract potential buyer’s attention, this was the birth of Kanban. Kanban’s of that time tried to tell the buyers a message by clearly communicate what the shops would sell, which is also applicable for the use of Kanban to this day, by being a way to communicate content to the user visually and clearly. [4]

In the mid 1940’s Japan faced a post-war shortage on materials and low volumes of production, this meant that it was necessary to utilize the materials in the most effective way and hereby raise the productivity to achieve a higher volume of production. This was also applicable for the Japanese car industry that was greatly stagnating. One of these car producers were Toyota, which at the time made economic losses and could not compete with other global carmakers. This changed by Taiichii Ohno, who at that time was an industrial engineer at Toyota. He sought inspiration for changes by studying an American supermarket, which only replenished its stocks when customers had bought the available products and hereby work as a pull system, where the demand and pull of products directly affected the supply of products. This inventory system was called “Just-in-Time” and was a great effector on the reduction of waste which leads to low throughput and low performance. Taiichii Ohno implemented this system to Toyota and called it Kanban, because of its new way of signal demand throughout the factory and the foundation for the “Toyota Production System” were made. Toyota Production System is acknowledged as the predecessor to the more generic Lean manufacturing. [5][6][7]

In 2010 David Anderson wrote his book “Kanban – Successful Evolutionary Change for Your Technology Business”, where he enlightens a new way to introduce Lean ideas and methodology into technology development and IT operations with the use of a new Kanban method that utilizes the Kanban system which is known from the Lean methodology. He did this based on his work and observations at Microsoft where he worked as a development manager. The book describes how he sought a solution to overcome deadlines that were set by managers with no regard to possible complexity, risk and size of project. There was a need for a change that would increase productivity and quality, together with a new norm on working schedules and work commitments, it was described that there was a need for protection of the demands towards the software teams and for a sustainable work pace. The initial findings Anderson made, were through the use of a pull system called “Drum-Buffer-Rope” which is an application for flow problems and an approach in the “Theory of Constraints” framework developed by Eliyahu M. Goldratt. One of the side effects using the Drum-Buffer-Rope system and in general a pull system is that it limits work-in-progress and hereby limits overloading of workers. The implementation of the system showed great result in productivity and in lowering of lead times, therefore a success. The transition to another pull system, Kanban, happened simply because it was found that implementing a Kanban system the results would have been the same, but also because of its easy access and because it has a wider acknowledge than the Drum-Buffer-Rope system. [3][2]


Kanban in Project Management

Kanban can be used in project management to bring a lean methodology into the organization and to the team working in a project. As stated earlier, the new adapted Kanban method developed by David Anderson in 2010, which following wiki article elaborates, is developed towards the use in technology development and IT operations, therefore it is, as a project manager, important to distinguish which type of project they are working with and thereby choose the right method for exactly their case of project. Exactly what the Kanban method can give to a project is that it helps visualize tasks and the tasks status, a very simple Kanban board, which is used to visualize this, can be seen in figure 1. Where the stickers represent a Kanban card and the different lanes represent the task status, which gives the manager an overview of the processes. The effects of Kanban in manufacturing are very clear since its development in the 1940’s, and this shows that Kanban fits in the field of low variety and high repetitive work, which manufacturing is. But because of the findings regarding Andersons work in technology development, Kanban also has great effects to the fields of technology development and IT operations which has very high variability of work and also seeks variability to become first movers within the industry. Visibility in the work of technology development has simply, by limiting the work-in-progress, showed great effects on increased productivity, predictability and lowered lead times [3]. Kanban can therefore work as a method that project managers can use both in manufacturing and now in the areas of technology development and IT operations as well.

One of the most important things to elaborate regarding Kanban in Project Management is that Kanban is not an approach to Project Management, which is stated by David Anderson, ”Kanban is not a software development lifecycle methodology or an approach to project management. It requires that some process is already in place so that Kanban can be applied to incrementally change the underlying process” [3]. Therefore, there has to be some kind of processes already in place before using the Kanban method, which is different from other agile methodologies like Scrum, see Scrum for more information, because Scrum focuses on ways to handle the process of Project Management [2].

As a Project Manager, who wants to stabilize and improve the system in technology development and IT operations there are some foundational Kanban method principles one can follow:


  • Start with what do you know
  • Agree to pursue incremental, evolutionary change
  • Initially, respect current roles, responsibilities & job titles


Firstly, when talking about “Start with what you know” the method does not require any changes in the current work processes, but it is implemented directly to the working process, and the focus is solely on improving them. When looking at other agile methodologies like Scrum, is it a whole new system for managing the project and there will be new roles within the team and new activities. Secondly, “Agree to pursue incremental, evolutionary change”, means that when using Kanban there is a search for making improvements within the system that the team works with. By system this means in what way the team is doing their tasks, this could be by following a certain methodology or something else, but the only thing that matters when using Kanban is that everybody on the team understands this system. Measurements within the system and team is very important to make changes, because feedback can be given upon this and hereby help changes. Thirdly, “Initially, respect current roles, responsibilities & job titles”, means that if different representatives of the team do not respect roles, responsibilities and titles, the system of the team would not work out, because everything then will become unclear. This is especially important when working in technology development and IT operations because there is no correct answer on how to manage it, it varies from project to project [2].

The third principle of the Kanban method is well stated as something a Project Manager in every sense needs to take care off, because projects involve people and there needs to be some kind of control of what there is expected of people in an organization or team and what people expect of each other. As stated by Nigel Bennett who writes about the PRINCE2 method. “To be successful, projects must have an explicit project management team structure consisting of defined and agreed roles and responsibilities for the people involved in the project and a means for effective communication between them” [8] Furthermore, the ISO 21502:2022 states that “The project manager should seek to optimize team performance by providing feedback, resolving personal disputes and encouraging collaborative working” [9]. This is exactly a point which is important for the project manager leading a project with the use of Kanban, it requires the use of feedback in the search of continuous improvement, and the collaboration between team members and the organization improves with this.


Features of the Kanban method

One of the greatest features surrounding Kanban is to adopt the philosophy surrounding it, which means adopting the lean mindset. There is also a very important distinction when working with Kanban and more traditional process improvement, because in Kanban it is the team that is responsible of improvement decisions, where the decisions in traditional process improvement is more based on top-down management. There is simply more responsibility left to the team itself [2]. There are five practical core features related to the implementation of Kanban and each one of them will be explained in the following subsections.

Figure 2: Kanban board, self made with inspiration from [10]

Visualize Workflow

The visualization part of Kanban is of great importance, because it enables team members or managers to spot potential bottlenecks in the process. One of the great features for visualizing workflow is the Kanban board, an example of this can be seen in figure 2. The Kanban board showed in figure 2 has also been applied with a pull system, which allows the team members to pull a task when there is capacity to do so [11]. Kanban boards can vary a lot, meaning that they are specific for each team, this means that when a team wants to apply the Kanban board, they should study their own workflow and visualize exactly this. On the Kanban board there are several stickers, these stickers represent a user story which can be stated as the collection of a persona, need and purpose of the task, it is a short and precise explanation of what this exact feature will bring to the end user [12].

Limit Work-in-Progress

In a team there is a certain capacity of how much work there can be made, and by first have visualized the workflows and tasks it becomes clear if there is any column on the board that piles up a great amount of tasks, when this happens it gives the managers a possibility to control this by applying a limit of work-in-progress. By applying this, the team will focus on the work they are already doing and do not start on new tasks, which ends up with a better flow of tasks, followed with less context swinging which has been found to leading to waste of time [11]. Furthermore, there is great gains in limiting the work-in-progress because the team does not get overburdened, which has been an issue in technology development and IT operations.

Measure and manage flow

Figure 3: Example of a CDF, where the Kanban board categories are defined by different colours [13]

The feature of measure and manage flow is a corrective step, where the team uses information based on measurements of the flow to improve it, which means that they are looking for ways to improve continuously. There needs to be a certain amount of willingness to maximize the flow and this means for the whole team, because it can help with unevenness, frustrations and decrease of lead times. When there is a maximization of flow the effectiveness of the Kanban implementation is high, therefore is it interesting to look into the effectiveness of the implementation. When measuring the effectiveness there is several Key Performance Indicators (KPI) that can be used, the three main flow metric indicators is: Cycle time, throughput and work-in-progress. A cumulative flow diagram (CDF) can be used to visualize exactly these three indicators if they are measured. The CDF is a great tool to look in to where problems derive from, so this can be managed, and in the end, create an even better flow.

Make process policies explicit

  • Securing a common understanding

Use models to recognize improvement opportunities

Limitations of the Kanban method


  • Use of Scrumban can cover some of the limitations

Annotated Biography

References

  1. The kanban method. (2022). How to implement kanban. [1]. Accessed February 16th.
  2. 2.0 2.1 2.2 2.3 2.4 Stellman, A., & Greene, J. (2014). Learning Agile: 1st edition. O'Reilly Media. Pages 315-358
  3. 3.0 3.1 3.2 3.3 Anderson, D. (2010). Kanban: Successful Evolutionary Change for Your Technology Business. Blue Hole Press. Pages 21-31
  4. Kanban Tool. (2022). [2]. Accessed February 17th.
  5. Bicheno, J., & Holweg, M. (2016). The Lean Toolbox: 5th edition. Picsie Books
  6. Kanban Tool. (2022). [3]. Accessed February 16th.
  7. Nave. (2018). [4]. Accessed February 17th.
  8. Nigel Bennett. (2017). Managing Successful Projects with PRINCE2. 2017 Edition. The Stationery Office Ltd. Page 22.
  9. Dansk Standard. (2020). DS/ISO 21502:2020, Project, programme and portfolio management. 1st Edition 2020. Dansk Standard. Page 31.
  10. The kanban method. (2022). How to implement kanban. [5]. Accessed February 16th.
  11. 11.0 11.1 The Top 10 Benefits of Kanban. (2022). [6]. Accessed February 20th.
  12. TUser stories with examples and a template. (2022). [7]. Accessed February 20th.
  13. Tipsographic. (2020). How to Read a Cumulative Flow Diagram in Kanban. [8]. Accessed February 20th.

Other notable references not yet used: Articles:

  • Identification of criteria affecting software project monitoring task of Agile Kanban method. By Hamzah Alaidaros, Mazni Omar and Rohaida Romli
  • https://aip-scitation-org.proxy.findit.cvt.dk/doi/pdf/10.1063/1.5055423
  • Collaborative Work Management with a Highly-Available Kanban Board. By Annette Bieniusa, Peter Zeller, and Shraddha Barke
  • file:///Users/JakobWeber/Downloads/5bd0583fd9001d01d4104a4f.pdf
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox