The Critical Path Method (CPM) in Project Management: Difference between revisions

From DTU ProjectLab
Jump to navigation Jump to search
S151176 (talk | contribs)
No edit summary
S151176 (talk | contribs)
No edit summary
Line 1: Line 1:
<center> I N    -    W O R K </center>
<center> I N    -    W O R K </center>


According to the <span class="plainlinks">[https://en.wikipedia.org/wiki/Project_Management_Institute PMI]</span>, project management is the application of knowledge, skills, tools and techniques to project activities to meet project requirements. <ref>Project Management Institute. (2008). A Guide to the Project Management Body of Knowledge. 4th Edition. pp. 6. USA.</ref> The <span class="plainlinks">[https://en.wikipedia.org/wiki/Critical_path_method <b>Critical Path Method (CPM)</b>]</span>  is a mathematically-network based algorithm for scheduling a set of project activities.   
According to the <span class="plainlinks">[https://en.wikipedia.org/wiki/Project_Management_Institute PMI]</span>, project management is the application of knowledge, skills, tools and techniques to project activities in order to meet project requirements. <ref>Project Management Institute. (2008). A Guide to the Project Management Body of Knowledge. 4th Edition. pp. 6. USA.</ref> The <span class="plainlinks">[https://en.wikipedia.org/wiki/Critical_path_method <b>Critical Path Method (CPM)</b>]</span>  is a mathematically-network based algorithm for scheduling a set of project activities.   





Revision as of 10:50, 8 September 2016

I N - W O R K

According to the PMI, project management is the application of knowledge, skills, tools and techniques to project activities in order to meet project requirements. [1] The Critical Path Method (CPM) is a mathematically-network based algorithm for scheduling a set of project activities.


Overview

Introduction

hello

Background

Application and use

Methodology

The Project Network

Example

Consdideration of Time-Cost trade-offs

Benefits of CPM in project planning

Limitations of CPM

References

  1. Project Management Institute. (2008). A Guide to the Project Management Body of Knowledge. 4th Edition. pp. 6. USA.