Risk analysis

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 40: Line 40:
  
 
:Confidence in:
 
:Confidence in:
 +
::Risk level
 +
 +
::Sensitivity of result to preconditions and assumptions
 +
 
::Information Uncertainty
 
::Information Uncertainty
  
Line 51: Line 55:
  
 
:Limitations
 
:Limitations
 +
 +
=Benefits of analysing risk=
  
 
=Different models used when analysing risk=
 
=Different models used when analysing risk=
 +
==Brainstorming==
 +
 +
----
 +
==Structured or semi-structured interviews==
 +
 +
----
 +
==Delphi technique==
 +
 +
----
 +
==Check-lists==
 +
 +
----
 +
==Preliminary hazard analysis (PHA) ==
 +
 +
----
 +
==Hazard and operability study (HAZOP) ==
 +
 +
----
 +
==Hazard analysis and critical control points (HACCP) ==
 +
 +
----
 +
==Toxicity assessment==
 +
 +
----
 +
==Structured “What-If” Technique (SWIFT) ==
 +
 +
----
 +
==Scenario analysis==
 +
 +
----
 +
==Business impact analysis (BIA) ==
 +
 +
----
 +
==Root cause analysis (RCA) == link!
 +
 +
----
 +
==Failure modes and effects analysis (FMEA) / failure modes and effects and criticality analysis (FMECA) ==
 +
 +
----
 +
==Fault tree analysis (FTA) ==
 +
 +
----
 +
==Event tree analysis (ETA) ==
 +
 +
----
 +
==Cause-consequence analysis==
 +
 +
----
 +
==Cause-and-effect analysis==
 +
 +
----
 +
==Layers of protection analysis (LOPA) ==
 +
 +
----
 +
==Decision tree analysis==
 +
 +
----
 +
==Human reliability assessment (HRA) ==
 +
 +
----
 +
==Bow tie analysis==
 +
 +
----
 +
==Reliability centered maintainance==
 +
 +
----
 +
==Sneak analysis (SA) / sneak circuit analysis (SCI) ==
 +
 +
----
 +
==Markov analysis==
 +
 +
----
 +
==Monte Carlo simulation==
 +
 +
----
 +
==Bayesian statistics and Bayes Nets==
 +
 +
----
 +
==FN curves==
 +
 +
----
 +
==Risk indices==
 +
 +
----
 +
==Consequence/probability matrix==
 +
 +
----
 +
==Cost/benefit analysis (CBA) ==
 +
 +
----
 +
==Multi-criteria decision analysis (MCDA) ==
  
=Benefits of analysing risk=
 
=How to develop a risk analysis=
 
 
=Reference=
 
=Reference=
 
ISO Guide 73-2009 – Risk Management Vocabulary
 
ISO Guide 73-2009 – Risk Management Vocabulary

Revision as of 01:21, 24 November 2014

Contents

Abstract

This article may overlap with Risk Management but will attempt to discuss different approaches to analysing the risk when managing projects/portfolios/programs Several tools will be mentioned and explained briefly, but (in order to allow the full use of the wiki) not be described in detail

Definition

According to the ISO Guide 73-2009, Risk analysis is the “Process to comprehend the nature of risk and to determine the level of risk”

ISO 31000 describes Risk analysis as the process which “provides an input to risk evaluation and to decisions on whether risks need to be treated, and on the most appropriate risk treatment strategies and methods”.

This process mentioned is the computational part of risk management where different aspects, variables and factors are used to estimate the risk involved with a specific feature, action, decision, condition ect. The outcome of this computation is a quantified number or percentage which can then be used as an evaluation criterion, determining either which option to select or if it is safe to proceed down the investigated path.

Main features of risk analysis

Input:

Purpose
Consequences
Likelihood / Probabilities
Existing control features
Effectiveness of existing control features
Causes of risk
Sources of risk
Factors influencing any of the above
Interrelations / Interdependence
Type of risk
Information available
Risk criteria

Output:

Combined Likelihood / probability
Consequences
Confidence in:
Risk level
Sensitivity of result to preconditions and assumptions
Information Uncertainty
Information Availability
Information Quality
Information Quantity
Ongoing relevance of information
Limitations

Benefits of analysing risk

Different models used when analysing risk

Brainstorming


Structured or semi-structured interviews


Delphi technique


Check-lists


Preliminary hazard analysis (PHA)


Hazard and operability study (HAZOP)


Hazard analysis and critical control points (HACCP)


Toxicity assessment


Structured “What-If” Technique (SWIFT)


Scenario analysis


Business impact analysis (BIA)


==Root cause analysis (RCA) == link!


Failure modes and effects analysis (FMEA) / failure modes and effects and criticality analysis (FMECA)


Fault tree analysis (FTA)


Event tree analysis (ETA)


Cause-consequence analysis


Cause-and-effect analysis


Layers of protection analysis (LOPA)


Decision tree analysis


Human reliability assessment (HRA)


Bow tie analysis


Reliability centered maintainance


Sneak analysis (SA) / sneak circuit analysis (SCI)


Markov analysis


Monte Carlo simulation


Bayesian statistics and Bayes Nets


FN curves


Risk indices


Consequence/probability matrix


Cost/benefit analysis (CBA)


Multi-criteria decision analysis (MCDA)

Reference

ISO Guide 73-2009 – Risk Management Vocabulary

ISO 31000 - Risk management - Principles and guidelines

ISO 31010 - Risk management

International Journal of Project Management 32 (2014) - Vahid Khodakarami , Abdollah Abdi - Project cost risk analysis: A Bayesian networks approach for modelling dependencies between cost items

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox