Programming a project with the CPM

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
[[Category:Project Management]][[Category:Management]][[Critical Path Method]]
+
[[Category:Project Management]][[Category:Management]][[[Category:Critical Path Method]]
 
==Abstract==
 
==Abstract==
 
The Critical Path Method (CPM) was developed in late 1950s and became a very popular tool for Schedule Development. The method, which is broadly used by project managers, is a graphical technique which is known with the generic term Network Modeling.  
 
The Critical Path Method (CPM) was developed in late 1950s and became a very popular tool for Schedule Development. The method, which is broadly used by project managers, is a graphical technique which is known with the generic term Network Modeling.  

Revision as of 16:43, 9 February 2018

[[[Category:Critical Path Method]]

Abstract

The Critical Path Method (CPM) was developed in late 1950s and became a very popular tool for Schedule Development. The method, which is broadly used by project managers, is a graphical technique which is known with the generic term Network Modeling. Critical Path Method (CPM) is one of the basic deterministic methods of the network analysis and allows to coordinate effectively the individual and mutually consecutive activities within the project[1]. This article describes the methodology and provides an example of this technique.

References

  1. https://www.pmi.org/learning/library/going-beyond-critical-path-method-6297 / Project Management Institute
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox