Project Life Cycle in Industrial Engineering

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 3: Line 3:
  
 
==Big idea==
 
==Big idea==
 
+
This structure of life cycle <ref>[''http://apppm.man.dtu.dk/index.php/Life_Cycle_Model''] ''Name of link'' </ref> is often used in industrial engineering, because there is a communication with upper management or other entities less familiar with the details of the projects.
  
 
=== Initiation: Starting the project ===
 
=== Initiation: Starting the project ===

Revision as of 18:22, 11 February 2018

All projects can be mapped to a generic life cycle structure. A project life cycle is a sequence of steps through from the beginning to the end, they are sequential and, generally in industrial engineering, there are 4 four main phases which are: Initiation, Planning, Execution and Closure. The phases can be broken down by intermediate milestones, specific results or deliverables. The life cycle provides the basic framework for managing the project, regardless of the specific work involved, it is independent from the product life cycle produced by or modified by the project.[1]


Contents

Big idea

This structure of life cycle [2] is often used in industrial engineering, because there is a communication with upper management or other entities less familiar with the details of the projects.

Initiation: Starting the project

Planning: Organizing and preparing

Execution: Carrying out the work

Closure: Closing the project

Applications

Limitations

References

  1. Project Management Institute. “Project Management Body of Knowledge (PMBOK Guide)” – Fifth Edition, 2013. Page 38 to 46
  2. [http://apppm.man.dtu.dk/index.php/Life_Cycle_Model] Name of link
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox