Resources loading, leveling and crashing

From apppm
(Difference between revisions)
Jump to: navigation, search
(Crashing)
(Crashing)
Line 6: Line 6:
  
 
Crashing is a method used to analyze and choose the most cost-efficient measurements of compressing the project duration.<ref> B. Tonnquist & J.Hørluck (2009), "Project Management - a complete guide", ''Academica'', 1st Edition: 134.
 
Crashing is a method used to analyze and choose the most cost-efficient measurements of compressing the project duration.<ref> B. Tonnquist & J.Hørluck (2009), "Project Management - a complete guide", ''Academica'', 1st Edition: 134.
 +
 +
==Notes==
 +
<references />

Revision as of 16:04, 12 February 2018

Abstract

This article will examine what are the resources loading, levelling and crashing. The application of each of these methods in the project scheduling will be discibed to highlight the key benefits and differences between them. The goal is to provide a reliable guideliness that can be used in the process of allocating the resources into the project schedule.

Crashing

Crashing is a method used to analyze and choose the most cost-efficient measurements of compressing the project duration.[1]


Cite error: <ref> tags exist, but no <references/> tag was found
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox