Novozymes - CAPEX Portfolio Management: Difference between revisions

From DTU ProjectLab
Jump to navigation Jump to search
Line 1: Line 1:
==Notes for WIKI collection==
==Notes for WIKI collection==
'''Task''
''Task''
* Gather at least 10-20 different tools (e.g. Stakeholder models, communication models, solution designs) that might be relevant for our project
* Gather at least 10-20 different tools (e.g. Stakeholder models, communication models, solution designs) that might be relevant for our project
* Our tool (Article) in the WIKI system should be a short introduction of all the tools gathered and then 5-6 lines shortly describing every tool,  
* Our tool (Article) in the WIKI system should be a short introduction of all the tools gathered and then 5-6 lines shortly describing every tool,  
its usage and at last the reference a site where more information can be obtained.  
: its usage and at last the reference a site where more information can be obtained.  
* So basically, it should be our entire toolbox for the project work.
* So basically, it should be our entire toolbox for the project work.



Revision as of 14:10, 21 February 2020

Notes for WIKI collection

Task

  • Gather at least 10-20 different tools (e.g. Stakeholder models, communication models, solution designs) that might be relevant for our project
  • Our tool (Article) in the WIKI system should be a short introduction of all the tools gathered and then 5-6 lines shortly describing every tool,
its usage and at last the reference a site where more information can be obtained.
  • So basically, it should be our entire toolbox for the project work.

Business Problem

Tool Kit

Bibliography

References