Design-Build
(→Abstract) |
|||
Line 36: | Line 36: | ||
=== Management Structures === | === Management Structures === | ||
https://www.levelset.com/blog/design-build/ | https://www.levelset.com/blog/design-build/ | ||
+ | |||
+ | === Contract === | ||
+ | https://www.consensusdocs.org/contract_category/designbuild/ | ||
=== Figure / Picture === | === Figure / Picture === |
Revision as of 16:29, 11 February 2021
WIP
Developed by William Axel Linderoth Michaelen, s153275
Example of content: https://en.wikipedia.org/wiki/Design%E2%80%93build
Contents |
Abstract
Design-Build is a project delivery system, mainly used in the construction industry. The method utilizes single source responsibility which differs from the more traditional dual or triple source responsibility format used in Design-Bid-Build. The responsibility is defined by contracts, where the contract in the Design-Build project binds the architect and the contractor under one contract with the project owner. One of the key reasons for doing so is to create a shared responsibility between the architect and the contractor, and thereby involve the architect in the construction phase, and the contractor in the design phase.
Design-Build projects can be further divided into two types; Architect-led Design-Build projects and Contractor-led Design-Build projects.
Big Idea
History
Why choose Design-Build
https://www.pmi.org/learning/library/selecting-best-project-delivery-system-8910
Pros:
- One liable party: Text
- Efficiency: Text
- Collaboration: Text
- Project costs: Text
- Fewer disputes: Text
- Direct payment: Text
Cons:
- Conflicts of interest: Text
- Less innovative design: Text
- Requires more engagement from the owner: Text
- No bidding restricts access for subs: Text
- Increased liability: Text
Management Structures
https://www.levelset.com/blog/design-build/
Contract
https://www.consensusdocs.org/contract_category/designbuild/
Figure / Picture
Limitations
Annotated Bibliography
Book title Descriptive text