Iron triangle
From apppm
Summary:
Contents |
The Iron Triangle’s three pillars
Independence of the three pillars
Cost
Time
Quality
Application
Limitations
Annotated bibliography
Provide key references (3-10), where a reader can find additional information on the subject. The article MUST make appropriate references to the and reference material provided in class – either incorporating it as a source, or critically discussing aspects that are missing from it but covered by this article. Summarize and outline the relevance of each reference to the topic (around 100 words per reference). The bibliography is not counted in the suggested 3000 word target length of the article. [1] [2] [3]
References
- ↑ Flybjerg, B. (2011): Over Budget, Over Time, Over and Over Again, From Peter W. G., Morris, Jeffery K. Pinto, and Jones Söderlund (2011): The Oxford Handbook of Project Management (Oxford University Press.), pp. 321-344/
- ↑ P.M.I. (2017): A Guide to the Project Management Body of Knowledge, 6th edition, Project Management Institute
- ↑ Atkinson, R. (1999): Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria, International Journal of Project Management, DOI:10.1016/S0263-7863(98)00069-6