"It [The PDCA cycle] is a flow diagram for learning and for improvement of a product or of a process." [1] W. Edwards Deming
The PDCA (Plan-Do-Check-Act) cycle, also known as the Deming cycle or the Shewhart cycle, is a project management method used to continuously improve the quality of a process or a product. This cycle is based on the four following phases: Plan, Do, Check, and Act.[2]
- In the Plan phase, the problem to tackle is identified, and an action plan is set up.
- In the Do phase, the plan is put into action by the project team.
- In the Check phase, the differences between the results and the expectations are evaluated.
- In the Act phase, corrective actions are taken in order to improve the evaluated situation.
By breaking down a complex problem into these four phases, the organization obtains a clear overview of the situation and is forced to systematically identify areas of improvement, take actions about it, compare the results and the expectations, and make the necessary adjustments.
The PDCA cycle is an iterative method, which means that at the end of the fourth phase, it is recommended to implement again the method on the new situation to continue the improvement of the product or the process. This iterative approach results in an increase of efficiency and effectiveness inside the organization.
Developed by Eric Vincent Vong
Contents |
Presentation of the method
The PDCA method has four phases, each leading to the other, and aims to establish a virtuous circle to improve the quality of a product or a process. [3]
Plan
It is the most important phase in project management because objectives must be defined before acting. Usually, this phase is carried out in three stages.
- Identify the problem to solve, using for example the five W’s or brainstorming.
- Understand the causes, using for instance the fishbone diagram.
- Look for solutions and define an action plan.
Do
It is the moment where the action plan is implemented. Examples of action plan can be creating a prototype, carrying out tests, writing a software code, … In this phase, each team inside the project team works on its side, according to the action plan.
One point to mention and to be careful on is that even if each team works on its side, it is essential to have regular meetings with the whole project team to avoid the tunnel effect and to keep a global overview of the progress of the tasks, because some tasks can impact another one.
Check
In this phase, the project team makes sure that the solution that has been developed (in the Do phase) to tackle the problem (identified in the Plan phase) works well. The easiest way to do that is to compare the results with the expectations in terms of key performance indicators.
Of course, this analysis will emphasize differences. But it is understandable, and it is essential to keep these differences in mind for the next phase.
Act
This phase is usually carried out in two stages:
- First, corrective actions are taken in order to minimize the differences between results and expectations identified in the Check phase.
- Then, the project team draws conclusions of the whole four phases and uses it to begin again the PDCA cycle, by capitalizing on the knowledge acquired.
Visual representation
The most important idea to remember about the PDCA cycle is that each iteration must lead towards a better situation, a better quality of the product or the process. To remember this idea, the PDCA method can be represented with a block behind the wheel, which prevents it from going back and which symbolizes the capitalization of the knowledge.
Examples
Toyota
Toyota is a Japanese automobile company, well known for its efficiency and its quality control. The PDCA method has been and is still a key point of their success, especially in its production process. Indeed, this company uses the PDCA method to make sure to always meet the highest quality standards, by optimizing their process and by capitalizing on their knowledge.
The PDCA method used by Toyota to improve their production process can be described as following [4]:
- In the Plan phase, the company defines the production goals and sets up an action plan to achieve them. This action plan emphasizes details about the production processes, by answering the five W’s (What, When, Who, Where, and Why).
- In the Do phase, the company puts into action the plan defined previously to produce vehicles. During that stage, different kind of data is collected, for instance speed or quality of the production, so that it can be analyzed in the next phase.
- In the Check phase, the company compares the initial plan and its expected goals with what really happened during the production in order to evaluate the differences. By analyzing the data previously collected, Toyota is able to highlight areas that can be improved.
- In the Act phase, the company takes action to improve its production processes based on what was found in the Check phase. Toyota, for example, implemented new tools and new processes to improve their production process.
The PDCA method is part of Toyota’s culture, as underlined by Adriaan van Wyk, former production leader of Toyota South Africa Motors, in which he worked from 2003 to 2008:
"PDCA is so deeply ingrained in Toyota’s fabric that it was not taught explicitly. I had to become part of the culture and live it before I could make it my own.” [5] Adriaan van Wyk
Ningbo Women and Children’s Hospital
Variation of the method
PDSA
OPDCA
DMAIC (from the Six Sigma)
Pros and cons
Pros
Cons
References
- ↑ W. Edwards Deming, "The New Economics for Industry, Government, Education", 1993
- ↑ Nancy R. Tague, "The quality toolbox, Second Edition", 2005
- ↑ Rémi Bachelet, "L’essentiel des outils d’organisation de projet", Ecole Centrale de Lille, 2019
- ↑ Jeffrey Liker, "The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer", 2004
- ↑ Adriaan van Wyk, "PDCA - Make a 400 year old principle the foundation of your success", LinkedIn article, 2019