Bubble Diagram
The Bubble Chart is a two-dimensional chart where bubbles/disks are plotted, much similar to the regular xy-scatter-plot.
In addition the size of bubble, the colour can also vary giving the user up to four dimensions of data in an easily understandable two-dimensional chart.
In the most popular version the horizontal axis represents the Net Present Value over a period of time and the vertical axis represents the probability of success. The size of the bubble represents cost; thereby giving the user a very intuitive feeling of bubbles that are big will also represent big and demanding projects.
It is used as a visual tool to support the decision making in Project Portfolio Management.
A Study has shown that more than 40 % of examined companies use this method, although only 5-8 % uses it as the dominant tool.
If this picture is representative is however not evident. The article aims to provide a clear overview trough a description of the tool and its uses in practice. A list of benefits and disadvantages is created. Although this tool excels in visualizing the portfolio, upstream processes are needs as comprehensive data analysis of all the dimensions of data.
Furthermore a critical view is taken and it is debated if a tool as simplistic as the bubble chart can add real support to the decision making in Project Portfolio Management. A short comparison of the Bubble Chart to alternatives tools such as decision trees and scoring models are done, and the Bubble chart seem to be the strongest of the tools.
Contents |
Introduction to Portfolio Management
In order to obtain a profitable business in the 21th century, an organisation must excel in almost every way possible, from long-term strategic management to everyday planning and scheduling. Constant increasing global competition, ever faster changing technologies together with shorter life cycles make rivalry even harder today than ever. It is evident that if a company does not master project management (REF) and does not have the capability to execute projects swift and efficiently, they will not be able to maintain a profitable business for long. It is not enough to execute the projects right, but you also have to execute the right projects at the right time.
In order to manage all these parameter and always be one step ahead of competitors, few errors can be made. One way to make sure this happens is to make use of Portfolio Management (REF). There are many aspects to Portfolio management and many definitions can be found. The benefits of Portfolio Management are also somewhat dependent on in which area of business it is applied [REF]. This article will focus on the scope of Project Portfolio Management (PPM) (REF). Robert et al. (1999) (REF) argues that from a company perspective PPM is all about how to invest money in order to make more money, and such optimisation is sometimes also referred to Project Portfolio Optimisation (PPO) (REF). Choosing the right projects and building the best portfolio is however much more complicated than selecting the most profitable projects, based on a simple cost-benefit analysis, as the most profitable projects do not necessarily create the most profitable business. PPM is about prioritising some projects over others to balance the portfolio in regards to both risk, resource allocation etc. so the portfolio is in balance with the values and believes of the company as well as fits the current and future market.
One of the most important trades of PPM is the assistance to the decision makers in making the right strategic choices. It is of greatest importance that all projects, small as big, are aligned internally and do not counter work, but instead support the overall corporate strategy [REF].
Bubble Chart/Diagram
One of the tools that can be used to supports PPM is a Bubble Chart (BC). The BC is a two-dimensional chart where bubbles/disks are plotted. Much similar to the regular xy-scatter-plot, but instead of dots data is plotted as bubbles/disks. In addition the size of bubble, the colour can also vary giving the user up to four dimensions of data in an easily understandable two-dimensional chart. Due to the simplicity of the chart, many versions exist and are used extensively. However one version shows to be very dominant as almost 45 % of all BC-users use this design.
In this version the horizontal axis represents the total discounted value of the projects over a period of time (often 5-20 years) and is often referred to as NPV (Net Present Value). The vertical axis represents the probability of success, either as the probability in regards to the risk involved or the probability regarding a technical success. Lastly the size of the bubble represents cost, and thereby giving a very intuitive feeling of bubbles that are big will also represent big and demanding projects. It is important to notice that since the area of a circle grows with the quadrant of the radius, the cost should not be linear to the radius, but to the total size of the circle.
This chart can be divided into 4 quadrants: low-low, low-high, high-low and high-high. It is obvious that projects located within the high-high area are often desired and opposite projects located within the low-low quadrant are unwanted.
The more complicated situation arrives when projects prioritisation needs to be done in either the low-high and high-low area. Trade-offs is necessary but what is more attractive? Is it a high chance of success with small rewards or the low chance of success with high rewards?
It should be mentioned that this method shares some similarity to the Boston Matrix made in 1970 by Bruce D. Henderson which also works as a tool to assist in portfolio decisions [REF]. [2].
As the colour of the bubbles also serves as a dimension of data, it is therefore possible to distinct certain projects from each other no matter where they are located in the matrix. This can be very important if it some kind of dependency between projects should be visualised.
As it can be seen in Cooper et al (2001 - Class) the representation of the axes differs depending on which version that it used. However one version of the BC is clearly dominant with more than 44% of the ones using BC using this version. Other varieties can be seen in table…….
The use and implementation of a Bubble Chart
Cooper et al. (2001 - ClassREF) he reports that BCs are quite abundant with approximately 41 % of companies using this method in some form. Only 5-8 % of the companies however use it as their dominant method (ClassREF). The Bubble Chart is a visual tool that can help managers with scarce time resources make fast decisions. However several upstream processes are necessary for a BC to probably support PPM. Both NPV, resource requirement, together with risk need to be calculated before enough information is available to actually plot the bubbles into the chart.
This means that the BC cannot work independently of other methods and tools. This means that besides the mentioned benefits all the upstream disadvantages will show in the BC.
- NPV Calculations is not always as straight forward as it can seem. One thing is to compare different products, but comparing projects can be a bit more complex. Some projects might be of a tangible nature, but other projects might have an unmeasurable NPV e.g. Projects regarding Communication flow, or knowledge sharing. This incomparability makes some projects almost impossible to plot in a BC. Even if plotted, the not impressive NPV will probably lead to a scenario where it will not be prioritised.
- For some reason it seems like the calculations of required resources are often being underestimated [REF]. This often connects to unexpected expenses because of delays or unforeseen problems. However underestimation could also be a conscience choice from the project proposer as the proposer might have a better chance getting his/her project as they will appear more attractive than they really are. As crazy as this sound this happens all the time [REF].
- Lastly the risk needs to be calculated in order to understand what the chance of success and failure is. Calculating the unknown risk is always a tricky process. For a big pharmaceutical company this could mean using a comprehensive multi-criterion qualitative analysis as feed for a stochastic Monte Carlo simulation [REF].
It is important to remember that BCs vary a lot and comprehensive upstream calculations are not necessarily needed if the chart is used in an early stage to get an easy overview.
If the axes on the BC are somewhat blurry, just called low-high, little preparation is needed. The risk analysis could be made as quick impact-probability matrix. A little portfolio board with experience would be able to make a BC rather fast based on gut-feeling from earlier projects.
The Bubble Chart is a nice tool to create overview, but is only as good as the information put into it.
How can it be used and what are the effect (case study)
Blau et al. (2004) examines the effect of a Bubble Chart compared to a computational decision support system in the pharmaceutical industry. Even though a setup of highly inter-dependent data was used the multi criteria genetic algorithm only yielded a result 28 % better than with the conventional bubble chart approach. Conclusion is that even though a more high-tech solution should be used, the bubble approach still gives an easy overview and serves its purpose in the early stages to assist managers in decision making regarding Portfolio management of any kind.
Alternatives
Many alternatives exist. In the former section it was clearly seen that a nonlinear programming yielded a solution 28 % better than the BC. Many different scoring techniques have also been developed. In comparison to the BC this method can take many aspects into consideration, and depending in the score can go from simple to comprehensive. The Decision tree approach has also been fairly used as it gives the user the ability to get a simple overview. However this method has received criticism due to the fact that the tree can quickly grow to a size where the simple overview is lost and the methods therefore uses one of it greatest benefits. http://en.wikipedia.org/wiki/Decision_tree
Conclusion
The BC should be continuously used as a tool to get clearer overview, but it is important to understand the limitations of this tool, and it is only as good as the surrounding supporting tools. This combined gives the user the opportunity to observe four-dimensional information in a very easy and simple two-dimensional chart. This feature is what makes the BC different from many other tools as it provides the user much data in a fast and visual manner.
References
- ↑ Portfolio management for new product development: results of an industry practices study Volume 31, Issue 4, pages 361–380, October 2001
- ↑ https://www.bcgperspectives.com/content/classics/strategy_the_product_portfolio