Talk:Stakeholders from a dynamic and network perspective
From apppm
Contents |
JEPO Review
General Comments
- To Short
- Not enough proper references
- Would be nice with some pictures of the different stakeholder diagrams
- Bullet point would make the reading a bit more easy and the main points of your article more visible
Abstract
- A long description of the over all topic. My be shorten it down to the different methods.
- Could it be a good idea to pinpoint the different messages and recalling the problems which can appear?
- List of typical failures of stakeholder analysis, could maybe be a good introduction and the need to create better awareness how to use the tool.
Overview of a Stakeholder Analysis
- Illustrations of on what levels a SA can be used
- Maybe also a process diagram or bullet points of the procedure
Current practices
- What question do you have to make to identify the stakeholders.
- What subgroups are their.
- How to handle the different stakeholders?
What is missing
- This could maybe be included in the abstract?
- What is the reason that people are not using the SA during the project time?
- Maybe investigate, what is needed to make it happen. Break routines, establish awareness, integrate in monthly meetings?