Value Analysis

From apppm
Revision as of 17:40, 28 February 2018 by S123666 (Talk | contribs)

Jump to: navigation, search

Abstract

Value Analysis is a systematic tool which can be used to improve the value of a product or process by analyzing its constituent components and the associated costs [1]. The overall objective is to find improvements to the components by reducing their cost and/or increasing the value of the functions.

This article will describe each step required to perform a Value Analysis as well as suggesting tools that can be used during each step. The Article can be used as a template when performing a Value Analysis.

History of Value Engineering

The origins of the Value Analysis goes back to World War II. During the war, there was a shortage of both labor and materials which resulted in companies had to search for substitutions to their existing products in order to still meet demand.  This value-based approach led to General Electric (GE) noticing that substitutions often resulted in reduced cost, improvement of the product or both. GE took this Value Engineering approach out of necessity but it resulted in a systematic process which still has wide application to today. [2]. The specific process originated in 1947 from Lawrence D. Miles and is known as Value Analysis [3].

List of Referneces

  1. Value Analysis and Function Analysis System Technique [1]
  2. History of Value Engineering [2]
  3. name="Bog"Techniques of Value Analysis and Engineering: 3rd Edition, Lawrence D. Miles
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox