Integrated Cost and Schedule Control

From apppm
Revision as of 13:25, 10 September 2015 by S150793 (Talk | contribs)

Jump to: navigation, search

Integrated Cost and Schedule Control

Contents

Background

describe the tool, concept or theory and explain its purpose. The section should reflect the current state of the art on the topic

Application

provide guidance on how to use the tool, concept or theory and when it is applicable

Drawbacks and Limitations

critically reflect on the tool/concept/theory. When possible, substantiate your claims with literature

References

Provide key references (3-10), where a reader can find additional information on the subject. Summarize and outline the relevance of each reference to the topic. (around 100 words per reference). The bibliography is not counted in the suggested 3000 word target length of the article.

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox