Search results

Jump to: navigation, search
  • ...ons the percentage of steps completed must be included. This ensure better control and guidance in case of any changes during the project development''.
    5 KB (867 words) - 22:53, 28 September 2015
  • ...ially those which are outside the norm and the ability to balance chaos vs control fall into that category.
    7 KB (1,119 words) - 10:30, 27 September 2015
  • ...ntroduction. You highlighted the poit —>waste reduction and high quality control <— '''Answer''': Good
    4 KB (647 words) - 17:22, 28 September 2015
  • 2.1 Schedule control 2.2 Cost control
    9 KB (1,540 words) - 10:51, 24 September 2015
  • ...nk that it would be nice to add a section on how to use the Gantt Chart as control tool to monitor the projects, in terms of progress, stage reporting etc.
    15 KB (2,680 words) - 20:04, 28 September 2015
  • ...rdinated and economical application of resources to minimize, monitor, and control the probability and/or impact of unfortunate events or to maximize the real ...on to effectively manage its key risks and demonstrate whether they are in control a risk identification process must be in place. Risk identification is a ke
    21 KB (3,034 words) - 15:12, 18 December 2018
  • ...f applicable methods, implying a dynamic and countinous model. The loop of control is built upon 4 phases: individuation, assessment, controlling and monitori The PRM Loop of Control is a comprehensive model consisting of simple and applicable methods
    10 KB (1,435 words) - 13:30, 21 September 2015
  • ...and stored in the system. This allowed the PM to control tasks, issues and control and oversee which project member was responsible for each of them. ...e about these topics and being able to utilize these correctly in order to control projects of this type, and can be the outcome of either failure or success.
    13 KB (2,168 words) - 14:54, 18 December 2018
  • ...to find out additional tasks necessary to achieve sprint goal; to keep the control over processes during sprint development it could be useful to maintain a c
    20 KB (3,205 words) - 15:13, 18 December 2018
  • ...processes and themes that address the planning, delegation, monitoring and control of all these six aspects of project performance. At its core, the method h ...led on a stage-to-stage basis. This approach provides senior managers with control at different milestones throughout the project. The project is assessed at
    27 KB (4,166 words) - 15:42, 18 December 2018
  • '''(9)''' Detection: detection is a ranking number associated with the best control from the list of detection - type controls, based on the criteria from the [[image:Loopofcontrol.jpg|thumb|Figure 6: Project risk management loop of control]]
    30 KB (4,526 words) - 15:48, 18 December 2018
  • # Focus control on the complete process. ...ry process within the construction phase. BSB also focused on the complete control process, not just the prefabricated skeleton, so that they could attain a h
    30 KB (4,402 words) - 15:50, 18 December 2018
  • ...nagement this is something to consider, when trying to predict, manage and control possible issues and delays within the work as well as the execution of the ...hout the five project process stages: initiate, plan, execute, monitor and control and closing the project. This article will consider the areas where GPM mai
    23 KB (3,593 words) - 14:50, 18 December 2018
  • ...emen and machine operators from Denmark. The project management team would control the project in close collaboration with the head office back in Lyngby as s
    25 KB (4,090 words) - 15:18, 18 December 2018
  • ... that no matter the effort, we cannot assume that everything is within our control. When risk identification is seen in the context of risk management, it is
    22 KB (3,515 words) - 15:27, 18 December 2018
  • ... when it has been an internal control, and actions have been taken to take control over the risk, successfully. Inherent risk is before any action has been pu ...ical responsibility for the client. In addition, the client will have full control over the design and projecting.
    22 KB (3,514 words) - 15:25, 18 December 2018
  • Manage the other knowledge areas, coordinate and control possible changes. It produces the following documents: Opening Term Perform Defines the coverage, the verification and the control level. The scope management has processes that address:
    20 KB (2,923 words) - 00:05, 29 September 2015
  • ...ios|risk management]] articles but the main process that should be used to control all risks including financial ones are as follows:
    27 KB (4,209 words) - 15:17, 18 December 2018
  • ...thod in Project Management(CCPM) is a method to plan, execute, manage, and control both single and multi projects, which emphasizes the effects of resource al ...<ref name="CCPM2"></ref>. In addition, the FB acts as means to measure and control the feeding paths.
    29 KB (4,519 words) - 15:45, 18 December 2018
  • ...at it is impossible to manage any organization solely by means of mindless control systems that depend on rules, plans, routines, stable categories, and fixed
    6 KB (1,027 words) - 21:42, 28 September 2015

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox