Search results

Jump to: navigation, search
  • ...-2017, https://en.wikipedia.org/wiki/Life-cycle_assessment </ref>. The LCA method applies to construction as an essential part of the assessment of buildings
    24 KB (3,587 words) - 12:30, 19 November 2018
  • ...- || - || Presentation and short descriptions of VTT Building Technology's method EcoProP, explaining six exhibits with environmental management in construct
    27 KB (3,835 words) - 13:35, 19 November 2018
  • ...in the time of making decision. According to the Graham M. Winch selection method can be illustrated as function of ''level of dynamic uncertainty'' and ''le From the graph we can establish the most appropriate method of the procuring services for our project and stage in which it is. For exa
    12 KB (1,743 words) - 12:33, 19 November 2018
  • ...sequential life cycle such as the critical path method, the critical chain method, the limited space analysis (LSA) and Location-based Scheduling (LSB). =====The critical path method=====
    19 KB (3,131 words) - 12:41, 19 November 2018
  • ...vities in a timeline like the [[Gantt Chart]] or using the [[Critical Path Method]] (CPM) to estimate the time used and needed for activities dependent on ea ...cal Path Method), CCM analysis ([[The Critical Chain Method|Critical Chain Method]]) or [[Program evaluation and review technique (PERT)|PERT]] model (Progra
    24 KB (3,853 words) - 13:31, 19 November 2018
  • In modern time, commissioning has been tried out as an quality assurance method. The effects of commissioning, are a lowering of maintenance costs which is
    26 KB (3,635 words) - 13:30, 19 November 2018
  • ...especially when the case has a lot of dependencies, is ''the critical path method (CPM)''. The CPM had been used in many construction cases but since the wor ==Critical path method (CPM)==
    14 KB (2,410 words) - 10:23, 20 June 2017
  • ...phy was originally developed for the manufacturing industry, where it is a method of forwarding materiel or work from one process to the next, at the moment JIT is a method of forwarding material or specific manpower or traits at the exact moment w
    21 KB (3,205 words) - 19:50, 20 June 2017
  • ...rocurement and the early involvement of the contractor. A problem with the method is that even though the client is locked to the contractor after stage one ...selection_methods.PNG|250px|thumb|right|Fig. 2 Supplier selection methods (method in bold are the most common at each phase)
    17 KB (2,756 words) - 13:36, 19 November 2018
  • ...ender documents. Furthermore, the classification system and identification method is to be specified. Ref: CCS etc. ...his model, the consultants have a high degree of freedom choosing the work method.
    18 KB (2,663 words) - 13:40, 19 November 2018
  • ==Application Method and results ==
    11 KB (1,918 words) - 11:09, 12 June 2017
  • ...ntractor profit will be increased with the overestimation amount, but this method can lower the chances to win the bid and have the contract.
    19 KB (2,895 words) - 14:04, 19 November 2018
  • ...to achieve a successful project. Building information modelling (BIM) is a method of [[Communication in Project Management]] enabling continuous information ...cooperation between the various parties. BIM is both a model and a working method. BIM means closer cooperation between parties and branches out to each part
    17 KB (2,581 words) - 19:18, 20 November 2018
  • .... (2010), "''Managing Construction projects''". Second edition</ref>. This method is based on <span class="plainlinks">[https://en.wikipedia.org/wiki/Buildin ...aditional methods of planning like [[Gantt Chart]] and [[The Critical Path Method (CPM)]] to address difficulties regarding synchronization either with the
    25 KB (3,674 words) - 19:21, 20 November 2018
  • The '''Earned Value Analysis (EVA)''' Is a method used in <span class="plainlinks">[https://en.wikipedia.org/wiki/Project_man
    17 KB (2,740 words) - 13:21, 27 November 2018
  • ...erficial for the designer to get any help out of the value tree. The SMART method also requires that the involved users can come to an agreement on which fac ... make the "Expert choice" of what is most important for the building. This method also has the limitation of only giving the designer an overview of the desi
    17 KB (2,748 words) - 19:25, 20 November 2018
  • a method that can produce a cash flow in minutes.
    10 KB (1,571 words) - 20:02, 12 June 2017
  • ... analysis and diagram techniques. Information gathering is the most common method of identifying risk sources. It involves brainstorming sessions to obtain a == Basic Method for Identifying Risks ==
    21 KB (3,036 words) - 19:26, 20 November 2018
  • ::-Building Research Establishment Environmental Assessment Method [http://www.breeam.com// (BREEAM)]
    21 KB (3,158 words) - 07:32, 22 June 2017
  • ...ation of these contracts, and highlights strength and weaknesses with each method.
    27 KB (4,200 words) - 19:27, 20 November 2018

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox