Managing threats and opportunities in risk treatment

From apppm
Revision as of 23:07, 16 February 2023 by TheisRS (Talk | contribs)

Jump to: navigation, search

Developed by Theis Rosenkvist Sørensen

Risk management is the final stage in the risk management process. It is used to control and monitor the uncertainties during the project. When managing a project, uncertainties are one of the most important factors to control in order to achieve a successful project. Uncertainties occur when certain events in a project are unpredictable and it will only be possible to guess about a future event. Risk management is used to identify risks in the project that help maintain stability and used to prevent unforeseen events that can be cost, resource or time consuming. By using risk management, it is possible to ensure that the project team achieves the goals they are solving by not encountering many unpredictable obstacles during the project.

The risk management process is a five-step monitoring process that Establish Context/Scope, Identify, Analyze, Evaluate and Treat potential risks over the life of a project [1]. By managing the project using responses to threats and opportunities, it becomes possible to minimize the impact of the risk. If this can be done in a successful way, better risk management is achieved and it will thus be possible to reduce the impact of the uncertainties in the project. By using Rumsfeld's (un)known-unknowns, it becomes possible to reduce the risk by establishing precautions that can prevent or reduce the uncertainties from arising.

When working with risk treatment, there are some limitations. One of the crucial limitations is the lack of knowledge sharing. The lack of knowledge sharing leads to a greater amount of uncertainties that could have been prevented. However, not all uncertainties can be prevented and even perfectly planned projects have their limitations. By having a greater amount of expertise, a higher level of risk treatment can be performed and will minimize the risk by identifying crucial uncertainties in the project.

Contents

Introduction

The Risk Management Process

Figure 1: The Risk Management Process [1]

Risk management is a process that works to manage risks to ensure that it cause the least impact in the project. Risk management is based on assumptions and experience from previous projects. However, many assumptions are uncertain which can have an effect on the project's original scope. The Project Management Institute (PMI), describes risks as "An uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives" [2]. By successfully navigating the uncertainty, risk can be managed in a way that is most beneficial to the project scope.

The process involves a "systematic application of policies, procedures and practices to the activities of communicating and consulting, establishing the context and assessing, treating, monitoring, reviewing, recording and reporting risk" [1]. It should be noted that there can be many different applications of the risk management process, as it can be adapted to a particular project to achieve specific goals within the organization.

When operating the risk management process, take into account that the process is an iterative approach and it is important to go back and assess whether there have been changes in the previous stages that could create new potential risks that the project manager needs to adapt in their risk assessment. The stages are illustrated in Figure 1 [1].

(NOTE: Should I elaborate on the five stages as this is an introduction?)



WILL BE DELETED:

ref iso 31000_2018: [1]

[1]


ref PMI: [2]


Project Management Institute, Inc. (PMI). (2021). A Guide to the Project Management Body of Knowledge (PMBOK ® Guide) – 7th Edition and The Standard for Project Management. (pp. 114-125). Project Management Institute, Inc. (PMI). Retrieved from https://app.knovel.com/hotlink/pdf/id:kt012LZJB1/guide-project-management/opportunities

Donald Rumfeld's Matrix

abc

[3]

Hillson, David. "Effective Opportunity Management for Projects - Exploiting Positive Risk", 2003. Ch. 1. "The case for opportunity management". Marcel Dekker Inc.


Risk Management Process

abc

Hillson, David. "Effective Opportunity Management for Projects - Exploiting Positive Risk", 2003. Ch. 1. "The case for opportunity management". Marcel Dekker Inc.

Risk Treatment

The importance of risk treatment lies in the fact that risks are decisive for whether a project will be a success or not. By not managing the risks, the consequence can be fatal. Barry Boehm states the consequence as "If you don’t actively attack the risks, they will actively attack you".



Risk management is driven by the desire to succeed.


Extra?

abc may be to blame for lower success

NOTES:

When reacting to threats, ARTA (Avoid, Reduce, Transfer, Accept) can be used as an approach to the Risk Management Process. The goal is to reduce the impact to zero by either avoiding, reducing or transferring the risks.

Some of the response strategies to threats and Opportunities will also be highlighted in this article

By using risk management, it is possible to ensure that the project team achieves the goals they are solving

Risk management is a five-step monitoring process that establishes context, identifies, analyzes, evaluates and addresses potential risks over the life of a project.


Risk can be either threats or opportunities...

Risk treatment is a way to manage and act on the identified risks.


(CONTENT)

This is a page will be elaborated on the following topics:

  • Managing threats and opportunities in risk treatment introduction (known knowns?, risk management, risk treatment)
  • Risk management process (the 5 stages in the risk management process)
  • Responses to threats and opportunities
  • Discussion and conclusion
  • References


NOTES FOR ABSTRACT:

The goal is to take procortions for the uncertainties and reduce the impact it can we on the project. This can be done by...

In project management there is a lot of uncertainties we need to prepare and take procortions for. By doing this it will be possible to prevent unknown factors that can occure. mannaging thorugout the whole projct.

The 5 steps in risk management

responding to threats - ARTA

Responding to opportunities


Annotated Bibliography

Articles

  1. Project Management Institute, Inc. (PMI). (2021). A Guide to the Project Management Body of Knowledge (PMBOK ® Guide) – 7th Edition and The Standard for Project Management. (pp. 114-125). Project Management Institute, Inc. (PMI). [2]
    • DESCRIPTION
  1. Danish Standards Association (2018), DS/ISO 31000:2018, Risk management - Guidelines. [1]
    • DESCRIPTION


Books

  1. Hillson, David. "Effective Opportunity Management for Projects - Exploiting Positive Risk", 2003. Ch. 1. "The case for opportunity management" [3]
    • Description

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 Danish Standards Association (2018), DS/ISO 31000:2018, Risk management - Guidelines, Retrieved from https://sd.ds.dk/Viewer/Standard?ProjectNr=M296412&Status=60.60&VariantID=41&Page=0
  2. 2.0 2.1 2.2 Project Management Institute, Inc. (PMI). (2021). A Guide to the Project Management Body of Knowledge (PMBOK ® Guide) – 7th Edition and The Standard for Project Management. (pp. 114-125). Project Management Institute, Inc. (PMI). Retrieved from https://app.knovel.com/hotlink/pdf/id:kt012LZJB1/guide-project-management/opportunities
  3. 3.0 3.1 Hillson, David. "Effective Opportunity Management for Projects - Exploiting Positive Risk", 2003. Ch. 1. "The case for opportunity management". Marcel Dekker Inc.