Story Points Estimation
Story Points are an estimation tool used by many IT-development teams. Story Points are often recommended in Agile Project Management frameworks and methods such as Scrum, Agile-Kanban or Extreme Programming (XP). The Story Point estimation tool separates itself from conventional tools by being an arbitrary unit of measure that estimates required effort instead of the more tangible and well-known hours. Proponents of the tool argues that Story Points encompass a range of dimensions including, complexity, uncertainty and risks involved in the task. It remains, however, a controversial tool, often because the concept is not well understood, its benefits are abstract and effective use requires prerequisite work as well as medium or long project run-times.
One clear benefit of using Story Points is that it enables the project team to measure the velocity of the team: An hour is always an hour, and in a perfect world the burndown-chart burns with exactly the amount of work-hours you assign to your tasks. This is, of course, almost never the case. Project teams works more efficiently in some periods than other. Overhead, such as time- or resource waste also varies through the different phases of the project. By assigning Story Points based on effort to tasks you create an effective tool to measure the current speed of the team. An added benefit is that the perceivable metric often creates a common goal to increase the pace within the project team.
Contents |
History
Although there is no definite data available of when the Story Point practice was birthed (citation needed), there exist strong indications that some of the core thoughts behind the tool originate from the Delphi Method[1] developed by the RAND Corp. at the beginning of the Cold War in the 1940's. Later, the Wide-band Delphi Method from the 1970's facilitated increased communication over the Delphi Method. Some of the practices stemming from the Wide-band and Delphi methods have later implemented themselves as common practices in "Agile Methodology", introduced by software engineers in the late 80's and early 90's[2]. In 2001 we especially see thoughts from the Wide-band Delphi Method cemented in the prominent "Agile Manifesto",[3] developed by 17 distinguished software developers to serve as a guideline for Agile Project Teams:
"Business people and developers must work together daily throughout the project."
Scrum, being one of the most widely used Agile frameworks[4], prescribes both time-boxed iterations as well as velocity estimations[5]. And although the Story Points estimation tool is not prescribed in Scrum, the fact that Story Points satisfies both of the prescribed guidelines while also keeping in line with the overall Agile perspective, has made Story Point estimation a widely used although somewhat controversial tool in the recent years.
Application and Use
A Story Point is an arbitrary unit of measure, and so, the precise method of application is not well defined, and may vary greatly between different projects and teams. It is, however, very important that a shared understanding and application of method exists within any team estimating using Story Points.
The template method below provides an example application of the Story Point estimation tool. It is in no way prescribed, and any truly Agile team should aim to develop their own approach:
- Step 1: Identify base stories.
Most Agile software development teams will have either general or technical User Stories made available to them at the beginning of the project. From the backlog of stories identify one or more base-stories to serve as reference to estimate the relative size of the backlog.
- Step 2: Make individual "bids" on stories.
Have each team member (including testers, front- and back-end developers, project owners etc.) write down a reasonable "bid" for the story and keep it secret for now. This could for instance be done using the Fibonacci sequence: 1, 2, 3, 5, 8, 13, 21...[6] The bid should represent each member's personal estimation of the effort required to complete the given story. Make sure to underline the importance of not only taking into account the number of hours they believe the task will take to complete, but consider the task's complexity, risks, size and so on.
- Step 3: Have each team member explain the reason for their bid.
Taking turns, have each team member reveal and then explain his reasons for the bid. Afterwards, discuss in the group the required effort to complete the task and reach a consensus before moving on. Especially pay attention to the outliers and never just average the bids. An example of why this is important has been outlined below: In an Agile team estimating using Story Points, a back-end developer with a lot specialized knowledge has made a bid on a User Story he is very likely to develop some time in the future. Using his considerable knowledge about this kind of story he has decided to make a bid of 13 Story Points. Meanwhile the project owner, who was in charge of writing this particular User Story has failed to see the technical difficulties in implementing this (he thinks) rather simple story. Therefore, he has made a bid of just 3 Story Points. After some discussion between the developer and the project owner it becomes apparent that what the project owner actually wanted delivered was far less extensive than what the back-end developer had read from the User Story. Following, the User Story was quickly rewritten, another round of estimations took place and the team reached a consensus of 5 Story Points for the Story.
- Step 4: Reach consensus for assigned Story Points.
Through group discussion the team should reach a consensus value for each story. This particular endeavor gets easier as the project progresses; this is because the amount of reference stories will grow, making relative estimation faster and less demanding. With enough reference (base) stories the project team will simply have to reach a consensus if the new story requires more, less than or the same amount of effort than a couple of the base stories.
- Step 5: Break down stories.
Once in a while, the team will reach the conclusion that a story requires an extraordinarily large amount of effort to implement i.e. 13, 21, 34... Story Points. This is a good indication that the story can be broken down into two or more smaller stories. As an example a story of 21 Story Points could probably be broken down into 2 stories of 13 and 8 story points, or maybe even 3 stories of 8, 8 and 5 Story Points. The reason an Agile team should always stride towards breaking down large tasks is because the individual, smaller tasks become more manageable while it also facilitates easier Sprint-Planning, reduces the risk of over commitment as well as diminishes some estimation uncertainty.
- Step 6: (During development).
For each story in the backlog, make a rough estimation using the base stories as reference. This will give the team a relative size of the backlog and a gauge of the required effort to implementing the entire project. Before committing a story to a sprint go through step 2-5 to ensure the team is continually working on the same page.
Cost/Benefit
Historically speaking, IT projects have failed at a comparative rate much higher than ordinary projects[8] and estimation accuracy seem to be a core factor, where studies show more than 68 % of projects fail to meet original estimates. It is therefore paramount, that any estimation tool's merits and drawbacks are thoroughly understood before use.
Consider all of the costs and benefits below before deciding if Story Points would be suitable for your team:
Costs
- Story Points take a lot of time in the beginning.
Although estimating is fast once the base stories have all been estimated and completed you might only really benefit from easy and fast estimation after a couple of sprints/development iterations. The Story Point tool is considered a high-level estimation measure, while it excels at long lasting projects it lacks merit for short-lived projects.
- Story Points are tough to understand.
Story Points are not hours, neither are they an estimate of complexity or how many people should be involved in the completion of a task. Rather, Story Points symbolize the required effort for the completion of a task. People who have successfully estimated using hours might have difficulties adapting to using the somewhat more vague Story Points as a estimation and progress-tracking metric.
- Management often care about hours.
Many aspects of a business depends heavily on estimated hours; a work day is measured in hours, consultants gets paid by the hour and a lot of KPI's are often related to hours as well. Realise that management often cares more about when the product will be delivered rather than how many hours still needs to be completed - if leveraged correctly this point of view may be turned into a benefit.
Benefits
- People are inherently bad at estimating time, but good at relative approximation[7].
Estimating using Story Points versus estimating using hours might improve estimation accuracy noticeably as depicted in Figure 2 and Figure 3. Although estimation inaccuracy might be equal for both methods at first, the iterative and reflective nature of Story Point estimation in an agile team, eliminates more estimation inaccuracy faster. This is because the Story Point tool discourages optimistic estimations, while the velocity-metric inherent to the Story Point tool makes progress-tracking easier.
- Story Points makes tracking velocity easy.
Because tracking velocity is prescribed in some Agile frameworks the tool is an obvious choice when using one of such frameworks.
- Story Points often strengthen team cohesiveness and promotes knowledge sharing.
Inherent to the estimation procedure people get to discuss different problems and solutions related to the tasks of the project. The method facilitates strong task-relationship as well as perceived unity (because project owners, developers, managers and testers all work together) which are two of the four metrics related to Group Cohesiveness.
- Story Points are a long-term measure.
Using Story Points is especially effective in large project planned to run for a long period of time. Consider using the tool if you have a large backlog and plan to run for at least a couple of sprints. The tool only becomes effective after a few iterations. The more base-stories the team completes, the more accurate future predictions become. This could arguably be both a benefit and a cost.
Alternatives
There are a number of ways to estimating and measuring size of software projects alternative to using Story Points. Among these alternative ways are measuring Lines of Code (LOC), Thousand Lines of Code (KLOC) or Ideal Days.[9] Another obvious alternative is simply to estimate using Hours.
Lines of Code
Using LOC or KLOC simply estimates the size of the project in regards to the lines that needs to be coded. These methods don't take into account the complexity of the tasks, but have shown to be decent indications of required effort.[10] While these two tools are fairly easy to use, the number of Lines Coded has almost no correlation with program functionality or quality, which often results in the tools being seen as a less desirable practice. LOC is an intuitive tool that is easy to use and most can relate to. However, unlike Story Points, only developers take part in estimating LOC. While this reduces overhead considerably, at the same time it provides some inherent project uncertainty.
Ideal Days
With Ideal Days you apply an absolute measure of required effort to implementing tasks. The main idea is you provide an estimate for the number of unobstructed development days or hours needed for completing a task. While this is also very easy and intuitive to use, it can be implemented with almost the same benefits as estimating with story points can. This is because the metrics can often be used interchangeably: Imagine a team estimating using Ideal Days having a backlog of tasks requiring 0.5 day, 1 day, 2 days etc. Now, convert each of these estimations into Story Points using a 1:1 scale: 0.5 Ideal Days = 0.5 Story Points, 1 Ideal Day = 1 Story Point and so on... Although it doesn't necessarily fit with the Fibonacci sequence the team will still be able to commit a certain number of point to each sprint, measure velocity, get an idea of current overhead, break down large tasks into smaller etc. just like when using the Story Point estimation tool. A story thought to take an Ideal Day typically takes a lot longer to implement than one work day. This is because the tool doesn't take into consideration interruptions such as meetings or unexpected problems such as computer-failure i.a. The team should take special care when estimating Ideal Days, unlike Story Points, that takes input from the whole team, Ideal Days may vary greatly between developers; a task that would take one developer half a day might take another 2 days to implement. People not only have different schedules that might affect the number of Ideal Days, but also has different skill levels to take into consideration.
Hours
Estimating using Hours is probably the most common practice in the industry. Estimating using hours can definitely have its merits as it is easier to align with core-business characteristics. Take special caution when estimating using hours, as this statistically seem to be one of the biggest pitfalls for project success[8]. General caution is advised when estimating using hours:
- Do not place much confidence in your first guess.
- People are notoriously bad at gut-feel estimations. If you are estimating alone, make up at least a couple of bids before deciding.
- Use a formula to improve your estimate.
- A general formula could be (OD*1 + ED*4 + PD*1)/6, where OD is the Optimistic Duration, ED is the Estimated Duration and PD is the Pessimistic Duration.
- Using this method it is possible to weight different estimations to get a more realistic bid.
- If the team later discovers they're being overly optimistic or pessimistic, they can easily change the weights in the formula.
- See also the PERT Article from the Wiki.
- Revisit estimates often.
- Once the project progresses, review hourly estimates often using the new knowledge you've acquired. This will help keep track on the future delivery date.
- This is generally also a good idea when estimating using Story Points. Completion of some tasks, especially in IT projects, may positively influence the remaining work in another, unrelated task.
- This is because possible code-redundancy becomes more apparent when some tasks have already been developed.
- Remember estimation uncertainty is often log-normally distributed (citation needed).
- This has the implication that estimates are often skewed to the right[11].
- This simply means that estimations generally are overly optimistic with a larger portion of estimates being lower than reality. Use this when developing your estimation formula.
- Compare and share your estimates with stakeholders and other developers.
- Teams are much better at estimating than individuals[12]. Agile development also emphasize that estimation is a Team Sport.
- Don't be afraid to tell the product owner your real hourly estimate for a task; maybe the healthy discussion will align some expectations or clear up some miscommunication or documentation.
Mixed Approach
Mixing hours and Story Points is not a recommended practice. This is because hours and Story Points don't measure the same thing. There exist no good trade-off metrics as a Story Point might pertain to 8.3 Hours of work one week, 4 Hours the next and 7.2 Hours the week after that. That being said, the practice is not unheard of[13][14]: Story Points are, as elaborated, a relative measure good for long-term estimation and progress-tracking. But it may lack some short-term benefits. In the referenced examples, two teams have decided to use Story Points as a high level measure, while using hours as a low level measure for Sprint-planning. In both examples it is argued that Hours give a better chance of committing "to capacity" for a sprint so that you don't end up having idle developers towards the end of an iteration.
Annotated Bibliography
For further reading it is suggested to check out:
Books:
Henrik Kniberg and Mattias Skarin (2010), Kanban and Scrum - Making the most of Both, C4Media Inc., USA. ISBN 9780557138326
- This short book gives an outline of the Agile framework Scrum and the Agile Kanban-method. The book touches upon different Agile tools and practices, describes which is prescribed in Kanban and Scrum and explains how they differ.
- The book is recommended for anyone interested in Agile Project Management, as well as new IT development teams deciding upon tools, KPI's and work practices.
Articles and Web-pages:
Sutherland, Jeff et al. (2001), The Agile Manifesto
- This web-page includes the Agile Manifesto, produced in 2001 by prominent and early practitioners of Agile development. It includes the 12 core practices of Agile development as well as the names and information of many renowned scholars and practitioners of Agile, who have since signed the Manifesto. The 12 practices is a recommended read for anyone trying to understand or uphold core Agile practices.
References
- ↑ Downey, Scott. Understanding Story Points
- ↑ Agile Software Development, Wikipedia
- ↑ Sutherland, Jeff. et al. Agile Manifesto Principles
- ↑ 4.0 4.1 Williams, Laurie. "Scrum Practices: Experiences of Three Microsoft Teams"
- ↑ Henrik Kniberg and Mattias Skarin (2010), Kanban and Scrum - Making the most of Both, p. 13 and p. 30, C4Media Inc., USA. ISBN 9780557138326
- ↑ James, Michael Common Effort Estimation Metrics, www.scrummethodology.com
- ↑ 7.0 7.1 Sutherland, Jeff (2013) Why Story Points Are Better Than Hours
- ↑ 8.0 8.1 Sutherland, Jeff. (2011) Scrum Points: Why Story Points Are Better Than Hours
- ↑ Georgsson, Anna (2011) A Case Study at Swedbank IT, p. 15, Master Thesis, Umeå University
- ↑ Source Lines of Code, Wikipedia
- ↑ https://en.wikipedia.org/wiki/Log-normal_distribution Reliawiki
- ↑ Radigan, Dan https://www.atlassian.com/agile/estimation Atlassian
- ↑ Cohn, Mike (2007) https://www.mountaingoatsoftware.com/blog/why-i-dont-use-story-points-for-sprint-planning Why I Don't Use Story Points For Sprint Planning
- ↑ Cheng, Chai Wei (2012) https://www.scrumalliance.org/community/articles/2012/august/story-points-versus-task-hours Story Points Versus Task Hours