Talk:Stakeholders from a dynamic and network perspective

From apppm
Revision as of 16:50, 25 November 2014 by JEPO (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Contents

JEPO Review

General Comments

  • To Short
  • Not enough proper references
  • Would be nice with some pictures of the different stakeholder diagrams
  • Bullet point would make the reading a bit more easy and the main points of your article more visible

Abstract

  • A long description of the over all topic. My be shorten it down to the different methods.
  • Could it be a good idea to pinpoint the different messages and recalling the problems which can appear?
  • List of typical failures of stakeholder analysis, could maybe be a good introduction and the need to create better awareness how to use the tool.

Overview of a Stakeholder Analysis

  • Illustrations of on what levels a SA can be used
  • Maybe also a process diagram or bullet points of the procedure

Current practices

  • What question do you have to make to identify the stakeholders.
  • What subgroups are their.
  • How to handle the different stakeholders?

What is missing

  • This could maybe be included in the abstract?
  • What is the reason that people are not using the SA during the project time?
  • Maybe investigate, what is needed to make it happen. Break routines, establish awareness, integrate in monthly meetings?
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox