Hoshin Kanri
From apppm
Abstract
The aim of this article is to describe a method called "Hoshin Kanri" (or Policy Deployment) developed by Dr. Yoji Akao. Hoshin Kanri is defined as a "form of corporate-wide management that combines strategic management and operational management by linking the achievement of top management goals with daily management at an operation level" [1]. This method is an essential element of TQM and is based on the PDCA cycle. Further, through the article, attention will be given to the X-matrix and the Catchball process.
1)What is Hoshin Kanri? 1.1)Strategy Deployment 1.2)History of Hoshin Kanri - Origin of the word 1.3)7 steps of Hoshin Strategy 2) The PDCA cycle (plan, do, check, act) 2.1)The X-Matrix and the A3-X
3)The Cross Functional-Management 4)The Catchball process
5)Implementation 6)Why Use Hoshin? 7)What can go wrong?
Reference
[1] HOSHIN KANRI: POLICY MANAGEMENT IN JAPANESE-OWNED UK SUBSIDIARIES, Barry J. Witcher and Rosemary Butterworth, Journal of Management Studies 38:5 July 2001, University of East Anglia