Roles and responsibilities of program manager

From apppm
Revision as of 15:18, 26 February 2018 by Nikoletta (Talk | contribs)

Jump to: navigation, search


Video 1: Introduction to the definition of Program Manager

Roles and responsibilities of program manager are very complex. For that reason, it is difficult to define them. They can vary from managing multiple projects to managing multiple projects with operational responsibilities, additionally to being accountable for profit or cost targets based on business strategy. Moreover, a program manager has the main supervision of the scope and status of several related projects at once which all together contain the program in order to ensure that the program goals are achieved. This accumulation of responsibilities of a diversity of projects and operations means that the program manager should be able to balance business targets and project/operational performance. His decisions are both tactical and strategic in nature. The program manager must establish an environment that allows the project managers to complete their projects successfully. In more detail, the main leadership duty is to bring more clarity to the team. Occasionally, the Project management office (PMO) may not have sufficient insight of the risk, issues, requirements, design or solution and the clarity that is given from them. In that case, the program manager may be well placed to accept calculated risk and then define clarity in his own terms or to provide this insight by actively seeking out such data from the project managers although in large and/or complex projects, a specific role may be required. However, this insight arises, the program manager needs this in order to be confident that the overall program goals are achievable. [1]

Contents

Big Idea

Origin of Program Manager

Program manager is first and foremost a leader, who delivers a business strategy that requires multiple coordinated projects. Furthermore, he can be considered as a “super” project manager. His roles focus mainly on operational, because he is responsible for planning and supervising the successful completion of the program. Last but not least, the program manager should have previously multi-annual experience of being project manager for large and complex projects. [2]

Roles and responsibilities

The major roles and responsibilities of a program manager are listed below. [2] [3] [4] [5] [6]

Planning

As it mentioned before the roles and responsibilities of a program manager are many and complicated. First of all, program managers are responsible for planning and scheduling the overall program from different perspectives and supervising the progress of it by creating a road-map for it, daily Program Management throughout the program life cycle. In addition, they should be able to manage the main program documents (such as the program initiation document), that means to edit, version and storage all management features files. To fit all these responsibilities together, there are a lot of program management tools (Tools) that can be used for assigning tasks, adding comments, organizing dashboards and approvals.

Management and Assurance

Program managers have to focus also on the assessment and assurance of the proper functioning, the productivity, the quality and the progress of the program with verifying and validating it. For that reason, they should coordinate the separate projects and their interdependencies and interfaces. To manage this, they have to evaluate in a regular basis the performance of each project that is contained in the program and then to do reviews and reports on the entire program. Specifically, they are responsible for review and then approve the different project plans. Before that, they have to ensure that the project plans are to the appropriate level of quality, on time, within budget and that they meet the requirements of the program strategy, plan and governance arrangements.

Alignment and Infrastructure

Program managers should also focus on the internal and external consistency of the program with the infrastructure planning and its interfaces with other programs. It is important because a program consists of several activities which take place at multiple levels and have different goals. Thus, the program manager has to clarify the vision, goals and object of the program and then to align the separate projects objectives with the business/organizational strategy, in some cases with the aid of the business change manager. Apart from that, program managers are responsible for provision of infrastructure that a program needs for its proper function. This includes the program office technology, and other factors in the work environment that contribute to the development and the integrate of the program.

Governance

One of the most decisive roles of program managers is the creation and confirmation of the separate projects that consist the program with the project managers. They have to define the responsibilities and delegate work to project managers. In addition, they should track, manage and provide oversight to team activities and their performance. during the whole program. They should be able to assist and report the project managers when it is necessary.

Improvement and Integration

Another crucial role of program managers is to define the program governance (controls). Particularly, they are responsible for identifying, assessing and managing risks, issues, delays and deviations from required standards. Finally, they should be able decision-making and to resolve performance problems, so they can integrate the program by improving and optimizing its performances.

Finance

Managing and utilizing resources across program is also one of the responsibilities of program managers. They are accountable for executive budget and for financial management that means implementation of specific fiscal practices and controls. In more detail they have to track the costs of the program and manage its budget by monitoring expenditure and costs of delivered and realized benefits during the program development.

Communication

Another role of program manager is to manage the stakeholder's communication and beside that to communicate with executive sponsors and program steering committee and finally to conduct periodic status updates

Leading

Finally, the coaching and developing of the employees either the existing or new ones could be a key role of program managers. They should be able to lead project managers and employees through high-level sessions either communicating knowledge about program and schedule development or motivating them.

During complex and large programs, sometimes it is required, other managers to be appointed who will contribute to the integration of the program manager work. They take over some of the program manager responsibilities that are listed above, for instance a risk manager, a communications manager or a benefits manager.

Application

Skills\Behaviors

In order a program manager to accomplish all his\her roles and responsibilities should have some skills\behaviors. A lot of surveys have be carried out about the behaviors of a successful Program Manager and they resulted that although knowledge about business is significant, there is more importance on his\her program management skills and the most crucial of them are the following four policies: [7] [4] [2]

1. First of all a Program manager has to see the organization strategically, that means:

  • Strategic thinking to plan and anticipate future implications, thinking broadly and understanding the long term impacts of decisions. Moreover, is *:*The organizational awareness – identifying interpersonal and group dynamics; being in tune with and adapting to the organizational culture
  • Leading change – instigating innovation and constructive change; helping others work through change
  • Strong leadership and management skills - effective leadership interpersonal
  • The ability to find innovative ways to resolve problems - the ability to find ways of solving or pre-empting problems

2. Another significant behavior is to understanding how to navigate the organization toward the future:

  • Judgment – analyzing situations effectively and making sound decisions confidently
  • Goal driven – setting and achieving short and long term objectives
  • Driving results from two perspectives – delivering results personally by meeting commitments and achieving goals - achieving business objectives through others by holding people accountable

3. Working well with others:

  • Communicative – expressing ideas clearly and listening attentively to others
  • Collaboration - communication skills
  • Building trust – inspiring trust and credibility with others, maintaining confidences and keeping commitments
  • Integrity – being forthright, honest and demonstrating ethical standards
  • the ability to command respect and to create a sense of community amongst the members of the project teams

4. Critical Thinking

5. Finance

  • Good knowledge of budgeting and resource allocation procedures

6. Project Management

  • Good knowledge and handling of project and program management methodology and techniques
  • good knowledge of techniques for planning, monitoring and controlling programmes
  • sound business case development and approvals skills

Tools

The roles and the responsibilities of a program manager can be performed using a wide set of tools. These techniques can be used to develop ideas and thinking in a program management environment. There are plenty of them and depending on the type of program are differed. On the Table below, the most important tools and techniques that can be used by program managers related to the roles and responsibilities that are referred above, are presented. [6] [8]

Tools Related roles Analysis Illustration
Dashboard Planning The dashboard shows the status of the multiple projects such as the progress of the tasks. If the dashboard is online and part of a cloud-based system, then it works even better, because in that case the managers can update their statuses either they are in the office or not and any time they want, these changes are instantly updated to the dashboard. Kl.jpg
Gantt Chart Management and Assurance Gantt chart is a tool for planning the schedule and creating a visual timeline of the multiple tasks that are contained in the program. Each task can be added manually or easily imported with a spreadsheet. If Gantt chart is online then it’s even easier to use it because avoid to deal with the difficulties of updating it. Moreover, the Gantt chart can be incorporated to the dashboard, thus it makes simpler to oversee the performances across all the separate projects. When team members update their tasks those changes are show up automatically on the Gantt chart. This provides a better overview of the program performance. Km.jpg
SWOT analysis diagram Align internal and external consistency of the program The SWOT (Strengths, Weaknesses, Opportunities, Threats) analysis is useful for specifying the threats and possibilities facing a program. It is a quick and readily understood method. The outcomes of internal business and external environmental analysis can be come of by analyzing of the program's strengths, weaknesses, opportunities and threats.

A similar type of analysis is known as PEST (Political, Economic, Social and Technological factors).

A.jpg
RACI diagram Governance The RACI (Responsible, Accountable, Consulted, Informed) diagram is a tool through that the program manager can define the roles and responsibilities of each participant in the program activities in terms of producing predetermined deliverables. RACI, an acronym which is composed by four participatory program's roles :
  1. responsible: those who undertake the activity or the resources
  2. accountable: those who take the credit for success or accountability for failure or the activity manager; and there must be at least one for each activity
  3. consulted: those whose opinions are sought
  4. informed: those who are kept advised of progress

There is also an expanded version, the RACI-VS that can also be used, adding the following roles:

  1. verifies: check if the product fulfills the quality criteria that set out in the product description
  2. signs off: those who approves the verification decision and confirm the product delivery
H.jpg
Stakeholder matrix Stakeholders A stakeholder matrix serves for mapping stakeholders focus on their importance and level of power to the program. Stakeholders are the individuals or groups who will be influenced by the activities of the program. They could be senior managers whose business areas are directly or indirectly involved, the customers outside the organisation, the suppliers and partners. B.jpg
Cause and effect diagram Align internal and external consistency of the program The cause and effect diagram is also known as fish-bone diagram. It is diagram which illustrates the causes of various events and the impacts that they have on the examined program. Each diagram consists from several start points (A points) and one or more end points (B points). C.jpg
Risk map Assessing risks The risk map is a tool which can present the risk in terms of likelihood and impact in a simple way. The probability of a risk is categorized as low, medium or high. If the risk occurs, there are also a classification for its impact similar with the former one. In case that a risk has high probability of appearance combined with important impacts on the program, that means that the risk is crucial. D.jpg
Decision tree Decision-making The main aim of using a decision tree is because of its strongly effective structure through which different strategies and their possible outcomes can be investigated. For this reason, it is a particular useful tool for choosing choice between several courses of action and investment opprtunities, especially when resources are difficult to be found for it. Furthermore, it is a way to keep a balance between the risks and rewards of each possible way of action. Z.jpg
Radar chart Identifying risks A radar chart is also known as a spider chart. It is a useful tool to define the number of risks to that the different projects are exposed. The start point is to place the relevant data on a table that afterwards is converted into a chart. In more detail, a point close to the centre of a radar chart on any axis shows a low value and a point near the edge indicates a high one. Gk.jpg

Comparison with project manager

Figure 5: Comparison of behaviors between project and program manager. (click to zoom) [7]

Program management is often defined as the next higher organizational hierarchy level over project managers. Program managers are often defined as the interface between higher management and operational-level execution of a company's tasks and in more general as the next higher organizational hierarchy level over project managers. [9]

A program was defined as a set of projects managed together in order to achieve a higher-level common scope, that will be impossible if each of these projects acts alone. [9] Frequently, the processes of projects and programs are described as being similar in nature due to their close link, although they are different in detailed level. [3] For that reason, the differences of these two concepts are presented. The main difference between a program manager and a project manager can be described by two: creation and compliance. The former one is responsible for creating the business environment culture and the project manager should comply with. Furthermore, the project manager's responsibilities are based on the triptych of time, cost, and scope of the project. On the other hand, the program manager is judged not only on these three subjects but also on a level that is cumulative for all the projects and operations within the program. This summation of responsibilities for a variety of projects and operations means that the program manager should carry out frequent trade-offs between business targets and project/operational performances. Moreover, program management decisions have basically strategic character. The strategy aspects must take into account multidimensional impacts beyond the short-term deliveries of the projects. In contrast with the project manager, who should complete and deliver projects within the time schedule and based on the instructions set by the program manager. To sum up, the project manager should focus on deliveries and execution of the projects whereas the program manager is also responsible for the overall organization and efficacy of the program over the long-term. [10]

Example

Figure 6: Managers in construction. (click to zoom) [11]

Big construction companies often undertake complicated projects, such the construction of metro. In this case, the program manager has the largest portfolio, which includes multiple projects on multiple sites and the program manager should be responsible for all the metro stations. Program managers have the overarching control, budget and schedule of a program. If the owner is not an expert in facility design and construction, the program manager provides leadership in this field. He cooperates with the stakeholders, including the client, the superintendent, and district officials. Moreover, in this example, the program manager defines the project managers each of them has to manage work on one of the metro stations. They are responsible for pre-design, design process, construction, integration and delivery of the project. In recent years, the construction manager has been joined as a member to the project-process. They are are the most appropriate to provide important knowledge during the design and construction phase.

How they can coordinate together:

The most critical thing is in every construction program, each manager has a distinct set of responsibilities and the clearer is for each of them what exactly are his or her roles on a project, the better result will come out. In more detail, the responsibilities of construction manager focus only on site-works, dealing directly with the contractor, project and program managers. The program manager works basically from an office and visits the different sites, if required. About the project manager, he has to be based either at office or the construction site.

The same philosophy applies to smaller and also larger construction programs involving multiple projects, such as airports.

Limitations

Although it seems that a program manager contributes to a better development and performance of a program avoiding issues and problems during its process, there are ways in which the program may evolve wrongly. Firstly, the role of a program manager could become too bureaucratic and have a lot of constrains on the program development. That means that program manager has a more implementing role than assisting essentially the process of the program. To clarify the responsibilities for each if the team members seems to be an easy job, especially if the program is in a small scale. In case the program is more complex, it is necessary to define the roles, tasks and prioritize them, otherwise it may complicate its evolution. An example of this limitation could be the wrong allocating of resources, which should distribute evenly according the program needs in order the program to be integrated properly.

See also

Related subjects

Reference

  1. .F.John Reh. November 26, 2017, ‘The Role and Responsibilities of a Manager’ [1]
  2. 2.0 2.1 2.2 .Zein Omar. January 1, 2010, ‘Roles, responsibilities and skills in program management’ / Project Management Institute [2]
  3. 3.0 3.1 .Blomquist Tomas, Müller Ralf. January 2004, ‘Program and portfolio managers’, ‘analysis of roles and responsibilities’ / Project Management Institute [3]
  4. 4.0 4.1 ‘An Roinn Airgeadais’, ‘Roles and responsibilities of the Programme Manager’ [4]
  5. .Michael F. Hanford. May 14, 2004,‘Program management: Different from project management’ [5]
  6. 6.0 6.1 .Jason Westland. May 30, 2017, ‘Best Program Management Tools for Managers’, ‘6 Tools That Help Manage Programs’ / Project Manager [6]
  7. 7.0 7.1 .Lynda Carter, Kristin Tull and Donna VanRooy. ‘Key Leadership Behaviors Necessary to Advance in Project Management’, ‘Project/Program Management Research’ [file:///C:/Users/nikol/Downloads/Key%20Leadership%20Behaviors%202013%20BW%20PRADCO.pdf]
  8. ‘An Roinn Airgeadais’, ‘Programme and project management tools and techniques’ [7]
  9. 9.0 9.1 .Pellegrinelli, S. 2002, ‘Shaping context: The role and challenge for programmes. International Journal of Project Management, ch.20, p.229-233’,
  10. .James T Brown. 2008, ‘The Handbook of Program Management: How to Facilitate Project Success with Optimal Program Management ’
  11. .Christopher Dunne. December 2, 2015, ‘Blog: Drive to Discover’, ‘Construction Management, Program Management and Project Management: What's the Difference?’ [8]

Annotated Bibliography

  1. Roles, responsibilities and skills in program management: This paper taken from the PMI web page captures the meanings of program and project management. It aims to clarify the main roles, responsibilities and skills in program and project managers.
  2. Program management: Different from project management: The purpose of this article is to analyze the main aspects of program management. They are summarized to five categories: governance, management, financial management, infrastructure and planning. Each of these features is explained analytically in this article and simultaneously is compared with those of project management. It also points out for each of these aspects the effort and outcomes needed in order to achieve success.
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox