Task Management - 3 Levels of Planning Methods

From apppm
Revision as of 12:10, 10 February 2021 by Jeyad (Talk | contribs)

Jump to: navigation, search

Contents

Abstract

Planning methods is a key feature in Task Management and helps to create an overview and structure in projects. Depending on the specific tasks and their complexity, the planning can be done at 3 different levels: - Network Planning - Gantt Chart - Cyclogram Planning The 3 planning methods differentiate in the number of dimensions and represent 1, 2 or 3 dimensions. The goal of all 3 planning methods is to show a path from the beginning to the end of the project, but the difference lies in how the path is visualized and planned. The first two methods are part of the Critical Path Method (CPM) and the last method is Location-Based Scheduling (LBS). The following article gives an insight into how the 3 planning methods benefits Task Management and focus on similarities and differences between the methods depending on the project.


Planning Methods

=Critical Path Method (CPM)

Network Planning 1D

Gantt Chart 2D

=Location-Based Scheduling (LBS)

Cyclogram Planning 3D

Comparison

Similarities

Differences

References

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox