Decision Tree

From apppm
(Difference between revisions)
Jump to: navigation, search
(Created page with " '''Decision Tree''' =Introduction= ==Background== ==Decision Tree== ===Purpose=== ===Structure=== =Decision Tree Analyis= =Considerations= = References = <referen...")
 
Line 11: Line 11:
  
 
===Structure===
 
===Structure===
 +
The decision tree is illustrated as a diagram of decision, as it can be seen in Figure X. The decision tree can be read from left to right. A decision tree consists of the following elements
 +
Root node: It is the leftmost node of the decision tree
 +
Decision node: It is represented by a small square.
 +
Decision tree branches: These branches which emanate from the right side of the decision nodes, compose the set of alternative decisions – solutions, which can be pursued. The project manager can select and put into application, one and only of these branches.
 +
Chance node: Chance nodes are represented by small circles in the decision tree. The number, which can be seen on the branch of each of these nodes, presents the probability of the decision on each branch to occur in the chance node.
 +
Endpoint: The right end of each path of the decision tree is named as endpoint. Every endpoint in the decision tree shows the final outcome of following this particular path from the root node to this particular point.
 +
  
 
=Decision Tree Analyis=
 
=Decision Tree Analyis=

Revision as of 15:12, 30 September 2017

Decision Tree

Contents

Introduction

Background

Decision Tree

Purpose

Structure

The decision tree is illustrated as a diagram of decision, as it can be seen in Figure X. The decision tree can be read from left to right. A decision tree consists of the following elements Root node: It is the leftmost node of the decision tree Decision node: It is represented by a small square. Decision tree branches: These branches which emanate from the right side of the decision nodes, compose the set of alternative decisions – solutions, which can be pursued. The project manager can select and put into application, one and only of these branches. Chance node: Chance nodes are represented by small circles in the decision tree. The number, which can be seen on the branch of each of these nodes, presents the probability of the decision on each branch to occur in the chance node. Endpoint: The right end of each path of the decision tree is named as endpoint. Every endpoint in the decision tree shows the final outcome of following this particular path from the root node to this particular point.


Decision Tree Analyis

Considerations

References


Annotated bibliography

1. Winch, G. M. (2010), "Managing Construction projects". Second edition
Summary: The book presents a holistic approach of construction management. The basic principles of construction project management are presented along with different tools and techniques that aims to enhance construction performance and provide innovative techniques. The use of information and communication technologies is also a point of interest in the book.
2. Kerzner, H., Ph.D., (2006), "Project Management: A systems approach to planning, scheduling and controlling". Ninth edition
Summary: The book illustrates the basic principles of project management. The book is targeting for enhancing the project skills of not only students, but also executives, pointing out that project management can be related to every profession apart from engineeering, including information systems and business.
3. Maylor, H. (2010), "Project Management". Fourth Edition
Summary: This book cover all the topics of project management, focusing in the theory, as well as in the application and usage of the ideas discussed in it. The book points great emphasis into the 4D-model of the project.
4. Flyvbjerg, B. (2008) "Curbing Optimism Bias and Strategic Misrepresentation in Planning": Reference Class Forecasting in Practice, European Planning Studies Vol. 16, No. 1
Summary: This paper presents the method and illustrates the first instance of reference class forecasting. The paper targets in the inaccuracy of the financial appraisal in planning in construction, explains them in terms of optimism bias and strategic representation and present a method of eliminating this inaccuracy.