Dependency

From apppm
(Difference between revisions)
Jump to: navigation, search
(Abstract)
(Blanked the page)
 
(5 intermediate revisions by one user not shown)
Line 1: Line 1:
  
== Dependency ==
 
 
 
== Abstract ==
 
 
 
 
The precedence diagramming method (PDM) includes four types of independencies or logical relationships. <ref name="pdm"/>
 
PDM is a tool for programming activities in planning a project. It is a method of constructing a network diagram of the project schedule that uses boxes, called nodes, to represent the activities and connects them with arrows that show the dependencies.
 
PDM, In a network technology project, focuses on the precedence of activities and logical relationships. It is also known as the activity-on-node or AON and used by many project management software packages.
 
PDM, In a network technology project, focuses on the precedence of activities and logical relationships. It is also known as the activity-on-node or AON and used by many project management software packages.
 
 
== Types of dependencies ==
 
 
 
Four types of dependencies or logical relationship are linking predecessor activity and successor activity together in PDM. Predecessor activity comes before successor activity which is logically a depended activity in a schedule planning. Example: collecting data in a software project management is a predecessor activity and analysing the data is a successor activity.
 
An activity must be time bound with a start and end time. This time bounding acquires the four types of dependencies between predecessor and successor which defined below:
 
 
• Finish-to-start (FS): A successor activity can start when a predecessor activity has finished. Example: building the walls (successor) in a house cannot start before finish the foundation (predecessor).
 
 
• Finish-to-finish (FF): A successor activity can finish when a predecessor activity has finished. Wall construction (predecessor) is required to finish before electrical wiring (successor) inside the walls can finish.
 
 
• Start-to-start (SS): A successor activity cannot start if a predecessor activity has not begun.
 
 
• Start-to-finish (SF):
 

Latest revision as of 16:39, 17 February 2019

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox