A project delivery system such as Design-Build is essential to project management in construction projects, and especially ties into project procurement management, where a clear definition of the project delivery method is needed. The defining of a project delivery method is a critical deliverable of the procurement strategy as it is defined in the PMI standards for project management. The procurement strategy should define a project delivery method, the contract payment types, and the procurement phases.
 
A project delivery system such as Design-Build is essential to project management in construction projects, and especially ties into project procurement management, where a clear definition of the project delivery method is needed. The defining of a project delivery method is a critical deliverable of the procurement strategy as it is defined in the PMI standards for project management. The procurement strategy should define a project delivery method, the contract payment types, and the procurement phases.
  
Design-Build in construction is most suitable as delivery method when:
+
Design-Build as delivery method in construction projects is most suitable when:
  
*Where there is a need to make an early start on site – can overlap design and construction
+
*Early on site construction is needed, making design and construction phases overlap
*Where the client wishes to minimise their risk – no responsibility for design
+
*The client wishes to minimise their risk – no responsibility for design
*For technically complex projects which can benefit from the contractor’s expertise
+
*The project is technically complex and can benefit from the contractor’s expertise
*Where the employer does not want to retain full control over the design development
+
*Where the owner does not want to retain full control over the design development
  
 
https://www.designingbuildings.co.uk/wiki/Design_and_build_procurement_route
 
https://www.designingbuildings.co.uk/wiki/Design_and_build_procurement_route

Revision as of 18:21, 14 February 2021

WIP

Developed by William Axel Linderoth Michaelen, s153275

Contents

Abstract

Design-Build is a project delivery system, mainly used in the construction industry. The method utilizes single source responsibility which differs from the more traditional dual or triple source responsibility format used in Design-Bid-Build. The responsibility is defined by contracts, where the contract in the Design-Build project binds the architect and the contractor under one contract with the project owner. One of the key reasons for doing so is to create a shared responsibility between the architect and the contractor, and thereby involve the architect in the construction phase, and the contractor in the design phase.

Design-Build projects can be further divided into two types; Architect-led Design-Build projects and Contractor-led Design-Build projects. In these cases the Design-Build entity is led either by the architect or the contractor, which affect the management structure and responsibilities in several ways with different pros and cons.

A project delivery system such as Design-Build is essential to project management in construction projects, and especially ties into project procurement management, where a clear definition of the project delivery method is needed. The defining of a project delivery method is a critical deliverable of the procurement strategy as it is defined in the PMI standards for project management. The procurement strategy should define a project delivery method, the contract payment types, and the procurement phases.

Design-Build as delivery method in construction projects is most suitable when:

  • Early on site construction is needed, making design and construction phases overlap
  • The client wishes to minimise their risk – no responsibility for design
  • The project is technically complex and can benefit from the contractor’s expertise
  • Where the owner does not want to retain full control over the design development

https://www.designingbuildings.co.uk/wiki/Design_and_build_procurement_route

Big Idea

History

Why choose Design-Build

https://www.pmi.org/learning/library/selecting-best-project-delivery-system-8910

Pros:

  • One liable party: Text
  • Efficiency: Text
  • Collaboration: Text
  • Project costs: Text
  • Fewer disputes: Text
  • Direct payment: Text

Cons:

  • Conflicts of interest: Text
  • Less innovative design: Text
  • Requires more engagement from the owner: Text
  • No bidding restricts access for subs: Text
  • Increased liability: Text

Management Structures

https://www.levelset.com/blog/design-build/

Contract

https://www.consensusdocs.org/contract_category/designbuild/

Figure / Picture

Figure 1: Name of figure (Text and reference)

Limitations

Annotated Bibliography

Book title Descriptive text

References

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox