Gantt chart and Scheduling techniques

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 6: Line 6:
 
A plan can only show the practicability of accomplishing its objectives when the actions and activities in the plan, are put together in a schedule that illustrates when each action or activity will be carried out.
 
A plan can only show the practicability of accomplishing its objectives when the actions and activities in the plan, are put together in a schedule that illustrates when each action or activity will be carried out.
  
Today there is many different methods and approaches to scheduling. It can either be by computer-based planning tools or done manually.
+
Today there is many different methods and approaches to scheduling. It can either be by computer-based planning tools or done manually <ref>E. Miller, ''The Sun'', (New York: Academic Press, 2005), 23-5.</ref>.
  
 
===Gantt chart===
 
===Gantt chart===
Line 19: Line 19:
  
 
==The connection==
 
==The connection==
 +
 +
==References==
 +
<references />

Revision as of 18:03, 19 February 2019

Contents

Abstract

Here you will write your draft for your wiki article, including at least 1 reference.

Scheduling

A plan can only show the practicability of accomplishing its objectives when the actions and activities in the plan, are put together in a schedule that illustrates when each action or activity will be carried out.

Today there is many different methods and approaches to scheduling. It can either be by computer-based planning tools or done manually [1].

Gantt chart

Checklist when creating a Gantt chart
1.
2.


Constructing a Network Diagram

The connection

References

  1. E. Miller, The Sun, (New York: Academic Press, 2005), 23-5.
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox